Bismarck Insights Ep. 76 - Gabe Schell
Mayor Mike Schmitz talks to Gabe Schell, City Engineer for the City of Bismarck.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Mayor Mike Schmitz talks to Gabe Schell, City Engineer for the City of Bismarck.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Speaker 1Welcome to Bismarck Insights with Mayor Mike Schmiz, a transparent and engaging conversational dive into meaningful topics impacting local government in Bismarck, North Dakota. Bismarck Insights is dedicated to removing barriers between the City of Bismarck and the citizens we serve every day.
Speaker 2Hello, welcome to Bismarck Insights. I'm Mayor Mike Schmitz and today we're bringing Gay Schell back from City Engineering. It's springtime and we're going to have lots of things going on in the community. And so, Gabe, there are a lot of people who know who you are, but maybe you want to just reintroduce yourself a little bit for those who have not seen our previous episodes and tell them what your experience is and what's a typical day as a city engineer.
Speaker 3Sure so named Gape Shelton, the City Engineer for the City of Bismarck. So our role is planning, designing, and overseeing the construction of a lot of our municipal infrastructure within our community. I've been in the role for about ten years come come May of this year, and previous to that, I worked as a consulting engineer for about ten years prior.
Speaker 2Sure, so let's talk about what engineering department does and how it's impacting the city as a whole, and how we grow and take care of things, and you know, like how what's a typical day that happens for you and your team? Sure?
Speaker 3So, I mean a lot of it's resolves around answering questions involving infrastructure. So it's our water mains, our sanitary sewers, our traffic signals, our roadways, our sidewalks, et cetera. It's both maintaining what we have and trying to find ways to stretch that infrastructure out for further life or replacing that infrastructure if it's at the end of its life. And then also the conversation about new infrastructure, how do we solve problems engineering problems with engineering type solutions, whether that's addressing a capacity constraint on the roadway network or a maintenance concern that public works may have on some
Speaker 3of their facilities that they own and maintain. We always try to look for those sort of solutions and come up with engineering problem or engineering solutions, I should say, for those types of problems. Typical day is a lot of coordination, a lot of understanding, try to deg into what those issues are, communicating with either the residents or internal or external stakeholders to figure out what the problems are and how do we craft solutions for them.
Speaker 2So, is there anything that you would find that maybe the community things would be a surprise that the city engineer has to deal with or or your team has to deal with on a regular basis.
Speaker 3I mean, maybe it's not a surprise, but just how long some of these things take by the time someone says there's a problem with some location, in terms of how long it takes to analyze what that problem is, come up with what we think might be a solution, look for funding and the funding grant opportunities how to potentially fund that. So it might be a pretty simple step to say we should put a stop sign at this intersection. Some of those if it's an easy solution, they're kind of easy to administer. But if it's more complex thing, it might take years before we're able to actually execute and develop and construct that solution.
Speaker 2So and that leads kind of to the next process. I mean projects, and people notice projects when construction starts to happen during the during the summer, spring, fall, whatever you know, the full winter or not during the winter. Hopefully we don't have a major issue that happens. But how is it that your team prioritizes what projects should be next because we have restrictions on how many dollars, we also have kind of a time limitation. We only have five six months to actually get something done during
Speaker 2the year.
Speaker 3Yeah, so obviously the weather that we have in North Dakota affects greatly our ability to produce good construction infrastructure. If we lived in Florida, we'd be building things year round and we'd have just a different scenario. But because of around here, we can kind of count on April to the early construction and we hope to get parts of November is the end, but those months in between are really where we have to do a lot of our work. So it becomes kind of a cyclical manner in terms of, you know, we'll do construction in the summertime, you know, spring, summer, fall, and then a lot of our winter time is getting ready for that, where there's
Speaker 3designing new projects or closing out the previous project so that we're to hit the ground running the next time the weather allows us to do that. In terms of prioritizing, a lot of us is trying to find efficiency. Sometimes there's efficiencies for us to redo the street traffic signal at the same time we're fixing some of the sidewalks in that area. But other times those two solutions are better actually to kept independent of each other, and let's just fix the water main first and then maybe a year or two years later, let's fix the street component or go out and do a rehabilitation on the street.
Speaker 3What we want to avoid is having to ruin perfectly good infrastructure or damage infrastructure that we most recently constructed. So usually it's kind of starting from the bottom up and making sure that the underground utilities are sufficient before we invest a lot of dollars on whatever that top code is, whether it's a sidewalk, a driveway, or a road in that area.
Speaker 2How about as we look at i'll call major new maybe extension projects, how do we go about prioritizing those. What's the mechanism or the science behind that?
Speaker 3Sure, so we use a lot of factors. Some of it it might be the age of the facility, so there could be a situation where that two lane rural ditch section roadway is coming to the end of its life because the pavement's fallen of heart. Well, that could be one of the reasons that it gets prioritized. And I also view that that pavement is perfectly fine from the assets perspective, but it's not meeting the needs anymore because there's more traffic trying to get to that location, or there's some safety concerns because there are sidewalks or a turn lane or whatever. Maybe the deficiency might be on that court or so we look at both the assets perspective as well as what that asset's intended to perform,
Speaker 3and it's usually a combination of those two things that help us prioritize where we should invest our public resources to improve the network.
Speaker 2Sure, which let's talk about some all those big assets that are under construction maybe right now are going to be and one of them we don't control Exit one sixty one. Well, we have to work with and coordate a lot of things with the state on that. Is that not true?
Speaker 3Yeah, So that exits sixty one Exit one sixty one reconstruction project with the DOT that North Quarter Department Transportation is the lead organization. It's about a fifty million doll their project, with most of that being federal funds. The city does have a million or dollars or so that we're contributing towards that effort. But it's a multi year project, even just the construction composent of it. So we'll see the last of that construction here in the twenty twenty six construction season. But looking back to when these ideas first started and the DOT for starting engaging with us and coordinating, that's probably five or six years ago when
Speaker 3those first conversations were had, both from a staff level as well as from the elected officials perspective, to understand what sort of interchange do we want here, what are the issues that are currently affecting the operations of the interchange, and what sort of solutions would help minimize or mitigate what those issues are. So you can come to a plan that works for the DOT, works for their governing federal highway agency, but also works for us as the locals to make sure that our fire trucks can leave the Merriam fire station in that very close proximity. We're working throughout construction with their staff on coordinating the traffic signals through this area so that we can make sure
Speaker 3that if the ramp is changing on Tuesday, that we have the correct signal programming in the traffic signal controllers that we can still funnel traffic through as efficiently as we can. Understanding it's still a construction zoneess, there is always going to be delays, but we're trying to make sure that we minimize those delays and use the tools that we have available.
Speaker 1To do so.
Speaker 2Okay, And so that's a big project that's been going on now. I don't know, it's probably the year three basically of some kind of form of construction. Last year was real heavy. It's gonna be pretty heavy again this year, and then they'll be wind up to it. Well, we have some other things that we've had going on at the same time, and we have to figure out how we're in a fund those and how long it takes to get those ready to go. And one's Tyler Parkway is going to be started this year in some form, but we just finished up a whole big project on Century Avenue. Like how long does it take some of
Speaker 2those projects to fruition?
Speaker 3Sure, So from the time the idea has had to say this is the corridor we're going to improve. It probably takes about a year's worth of time and minimum to survey the corridor, get a better understanding and depth engineering perspective of what the issues are in the corridor, come up with alternatives that we think our beneficial choose one of those alternatives. There's always a do nothing alternatives. So if it turns out that there's not a good idea or a solution for that, there's always the right to say no, we're not going to fix this at this point in time. We've got to keep analyzing come up with something better. But that process usually takes about
Speaker 3a year to get to that point. Then it kicks into the construction of the actual facility, so that usually takes at least a year. A lot of our projects will be multi year in some way, shape or form, so that it allows the contractor to use one season to really construct that facility and get it back to a serviceable condition, and then maybe the following season to do some of the landscaping or tree planting or some of the things. That might not be the best time to install the tree in November in the snow, but you can still be finishing up some of the sidewalk as long as you're keeping it covered and protected from
Speaker 3the element. So there's some of those elements that carry over and do the second year, but most of those larger corridor reconstruction type projects, I would say are primarily a one year construction with a following second year. So from initiation to the end, it's actually about a three year process of art of the time.
Speaker 2One way have coming up starting the summer is going to be it's a little longer because we have it's a major extension through some terrain that's a little unique.
Speaker 3Yep.
Speaker 2So what's going to be happening around Tylert Parkway this summer and not only the roadway, but I think there's stormwater easement or stormwater related to items as well.
Speaker 3So our Tiler Parkway extension will get going in Earnest here in twenty twenty six, and that's an extension from Valley Drive up to Cogburn Road. It's about a fifteen hundred foot or so extension, so it's not a very long project, but we are traversing across a coolie with that. There's not an embankment there today, so one of the major components will be hauling in material from a non site location to fill up in enough room at the bottom of the coolie to place a road on top of that. We know that that there will be settlement in that embankment, so we're doing work initially at the
Speaker 3bottom of the coolie to help stiffen up the surrounding ground. Will be installing some aggregate piers and some other geotechnical elements to ensure that when we place this large bankment on the ground that that ground can support it. It will have the process of bringing in the large embankment and hauling materials down there and compacting in a uniform matter so that we can safely put a road on top that we'll continue to settle throughout all eternity. So we're trying to take as many steps as we can to minimize what that settlement will look like so that when we put the road on, it'll be an asset for a very very long time that we can maintain
Speaker 3and doing so. We'll have that stretch out over a couple of the construction seasons, So our twenty twenty sixth season will be mostly earth hauling and embankment material and putting in a box culvert structure on the bottom to convey water through this embankment, and then year two, after we get as much of that settlement out as we think is sufficient, it will be when we'll be installing the road. So the public won't really have access to cross Tyler Parkway or cross Tyler COOLi on Tyler Parkway until the twenty twenty seven construction season, but they'll see a lot of activity here in the twenty twenty six construction season down in the valley.
Speaker 2And at the same time, do we not have some stormwater stuff going on in that same area.
Speaker 3Yep, So we'll have some stormwater improvements in the Tyler area. So we've had a long standing master plan that we've modified a couple of times in more recent years that identified some much smaller embankment sies are in the magnitude of ten to fifteen feet tall, so they're not filling in the entire valley by any stretch of the imagination. So a series of those, including the Tyler Parkway crossing and some upstream of those, will be constructed here in twenty twenty six. We're try to find once again some of those efficiencies if you have a contractor on site putting in infrastructure for Tyler Parkway. That was a really
Speaker 3good time for us to have that same contractor build some of the stormwater improvements because that's just one less coordination item to worry about, and we'll be able to kind of get those elements completed in the twenty twenty six construction season and get the grass growing in those facilities in operation. Yet in twenty six, do.
Speaker 2We have any other major extension or road projects besides our road repair and maintenance type stuff that's historically goes on every year.
Speaker 3So I wouldn't say there's any really large extension projects besides the Tyler Parkway one that those are our major ones. Other ones that the DOT is leading this year, there'll be a reconstruction of the interstate itself from Exit one sixty one to the east towards Minocan. So that's a process that there will be under construction in the twenty twenty six construction season, similar to what was done last year on the other lanes. The DOT is also going to be performing some well, i'll say, some lighter pavement management, some scrub ceiling, some microsurfacing, I think is what their
Speaker 3improvement will be on a lot of their roadways, including the Interstate and including Expresswaves, Market Expressway and University Drive. What are the accommodations the dot is making in that project that they're bidding in April will be nighttime work, So the contract will be performing all of that work or the majority of that work under nighttime conditions as a means to avoid place in that infrastructure or that repair at the same time that everyone's trying to use that asset or the roadway in this instance, so try to make as many accommodations as we can to limit the impact on the traveling public by constructing that infrastructure
Speaker 3at night when.
Speaker 2It's just less So is there a place where the residents can find out about what the timelines are when construction is happening, when roads are going to be open on an easy basis.
Speaker 3So we have a couple of resources that we use on our website at ismarcand dot gov slash streets. So on that streets page we have both a construction map showing all of the resource or all of the projects that will be undertaking in twenty twenty six. The type or the facility will be repaired. It doesn't get into the timeline. We have another map on that same website that gets into our lane closures and our road restriction. So if there is a lane closure on to the Bark Expressway, a lane closure on a state street, or a major arterial, we will post that information to that
Speaker 3location and send out a press release with graphics to the news media throughout our community. And then even citizens can sign up for text alerts and email alerts if they want to know everything that we're doing. There's the ability on that website to just subscribe to those updates as well.
Speaker 2That's what I'm trying to make points for everybody is that in our resources you can find out when things are going to happen. Maybe we don't know today when it's going to happen, but as that timeline approaches and is more set, you can find out and say, you know where to be able to commute and what to maybe avoid.
Speaker 3Yeah, that is definitely the case. Yeah.
Speaker 2So you know, so we're talking about Tyler Parkway and I know the Century Avenue Extension. Those are projects that came about and were funded through a sales tax and on the right now we're going to ask the citizens to extend that. Let's talk about that process and what is you know, what if we pass that sales tax extension, what are we going to be able to accomplish in general?
Speaker 3Sure, so, at a high level, we've used the staff set sales tax and the cities use those dollars to invest in corridors like forty third Avenue ash Cooley Drive, the Century Avenue project that you mentioned, or Tyler Parkway South Washington Street from twenty twenty four is construction, so really large arterial type reconstruction projects. Taking an insufficient roadway that has some sort of deficiency, whether it's usually it's capacity related, and build a new facility, whether it's three lanes, five lanes, whatever, the right traffic control situation might be, roundabouts,
Speaker 3traffic signals, et cetera. To build a facility that is more befitting of the adjacent development that is either there today or that we would anticipate being there in the near future. The citizens passed that in twenty eighteen with a sunset clause that would have that expire ten years later, so we'll see an expiration of that sales tax in twenty twenty nine, I guess early twenty twenty nine, and so the city will be proposing as an extension of that sales tax to use it's still for roadways whether but it will be expanding that project list that the voters previously approved to still have those roadways on there,
Speaker 3because some of them weren't constructed or weren't constructed to their final version of roadway configuration. So we'll solve many or all of the existing roadways that were on the project list, but we'll be adding a few other ones that as we've now seen growth in the community in the last ten or so years, additional roadways might be eligible for or redevelopment or development. So we'll see a new project list that'll expand the scope of the roadways, still being just for roads, but having some collectors and some even our cerial and local roads as well on that project list. And then extend the sunset to be
Speaker 3twenty thirty eight, so another ten years from when it was a plan to be sunseted. Extend that out another ten years so that we can accomplish more of the roadways that are on that project list.
Speaker 2And what has that funding mechanism allowed us to do related to road is if we didn't have it, what would we not have. Maybe's a good way to ask the question.
Speaker 3Sure, So historically we would have funded these large arterial roadway projects through mostly through our federal aid, a lot of it that we get from the federal government through the DOT and eventually through our ismark mandan metropolitan planning organization. Those dollars, I think we're somewhere in the tune of eighteen million dollars over the last time period, last ten years or so. That amount of money would give us probably two miles worth of reconstruction, is what we would have been able to accomplish. We did use the federal dollars in the program, and that's able to expand and extend the sales tax and how far those dollars reach
Speaker 3by still using the federal dollars. But if we relied only on the federal dollars, we probably would have just had two miles worth of road. So imagine probably just the forty third Avenue corridor from Washington Street to State Street and then from State Street to twenty sixth Street. That probably would have been the projects that were the highest priority at the time. Those are the first two that we constructed with the half sent sales tax. That would have meant that our Ash Cooley Drive project from twenty twenty three, our South Washington Street project from twenty twenty four, and our East Century Avenue project from twenty twenty five all would not be constructed and would just
Speaker 3be kind of waiting for an allocation or waiting for another solution to come that would fund that little project.
Speaker 2And other solutions would have maybe been even potentially some special assessment, which is what we're trying to avoid.
Speaker 3Yeah, so we're able to, through the half sent sales tax, use the funds that the community has provided to invest those dollars back into the community. So we find that these projects are probably larger in sculpe and scale than what a typical assessment would be manageable for that single family home or even that business, just because of the sculpe and scale of how expensive it is to build a new roadway from scratch with water rains and sewermains and all the elements that go into that particular facility. Without the halfset sales tax, it would be a very
Speaker 3large assessment on both types.
Speaker 2Of which would maybe make it not feasible, that is quite possibly not feasible.
Speaker 3That is definitely a consideration.
Speaker 2Yeah, and knowing that most of these roadways that are being constructed or rehabilitated through the halfs on sales tax are roadways that are being used by the public at large, including individuals who are not residents obviously a Bismarck. That's why it's targeted to those particular projects rather than your local street.
Speaker 3I guess there's some value in the sense that the dollars collected from the sales tax that's within Bismarck is both paid for by the citizens of Bismarck, obviously a large percentage of it is, but also those visitors that come from outside of the Bismarck corporate limits. So we're able to have more of the community that is using the facilities coming into our community to shop or to work, to help pay for maintain and building the facilities that we need in the city by extracting some of that cost from our visitors.
Speaker 2In Well, it's important for me to realize it's not a new halfs on sales tax, it's a continuation of the existing halfs on sales tax that we're asking the voters to say yes or no to.
Speaker 3Yep, that's correct. It would show no difference on I if the sales tax measure passes or it would not show an increase on whatever that purchase would be for that land order.
Speaker 2So as we look to what we currently have for funding, which ends in twenty twenty eight or early twenty twenty nine, do we have any projects that we can complete with those dollars beyond Tyler Parkway.
Speaker 3So the remaining dollars that we'd anticipate collecting over the next couple of years if the sales tax extension would would not be approved by the public, there's still elements that we would be able to put money towards. The State Street Corridor is a quarteror that we haven't invested very much of our local money because there's eligibility for federal and state eight on some of those corridors. So we would look to see what our what it's still left on the project list of corridors that are eligible for funding, and then look to see what the greatest needs are on those corridors to help prioritize those dollars.
Speaker 3Some of that is why we are considering an extension, because it adds additional project list opportunities, and in some way some of those projects might be more critically important to the citizens at this point in time than some of the list that is on the some of the projects that are on the project list currently.
Speaker 2So if we were to look at just the ending in twenty eight abought roughly and it's again it's a rough number because we don't really know until the tax is collected from sales, But what does it look like the fund would have available.
Speaker 3So we'd anticipate around twenty million or so somewhere around twenty million, it would be our estimation at this point in time of unencumbered projects. You know, we don't have anything else in the books past our Tyler Parkway extension. So we'd feel that those dollars are the ones that are still available to be put towards any eligible project on the product list or the project list as revised.
Speaker 2And to give some perception, should know what that twenty million dollars would pay for Roughly how many miles.
Speaker 3So that twenty million would probably go towards one to two miles of arterial road reconstruction. If that was put towards a state street type project and it's six lanes wide, it probably went to stretches far maybe it's one mile on a state street would equal to you know, that twenty million dollars compared to other quarridors where that one mile, but Pe'll stretch a little bit firs.
Speaker 2So I'm just trying to give perspective to people so they know why why we feel it's important that we have this fun in source to continue to take care of our roads and provide the network that's necessary to get to and from major places.
Speaker 3I guess yep, that's what we look at. And it's interesting in Bismarck, or rarely any community, as we look at that network where we build the network, where we're asking the citizens to reside within that network and use it. We're not asking the citizens to manage the water main or the sewermine. Once they flush the toilet or turn on the tap, that that's their only job, but it's up to us to get the water or sewage away or to the paupertation networks is kind of its own little animal because we're asking people to really occupy that network and use it. So we appreciate the input that we get from the public because they are the ones using the network and noting the deficiencies and noting the
Speaker 3delays or the areas for improvement because they're ingrained within that network on a daily basis.
Speaker 2And that leads into working with the public and what is part of your role when it comes to engaging with our residents.
Speaker 3Sure, we're all civil servants working on behalf of the public. So it's as we're trying to find solutions for finding solutions, not for me as a person having a problem, to trying to find a solution for that person who's engaging in that system. Whether it's a stormwater pipe that isn't draining the way it should, or a road facility or a traffic signal progression that maybe isn't operating it. It's great ast efficiency we're asking. We get a lot of information from the public because they are there are the eyes and ears to be able to say it rained last night and I got water at this location. I've never seen water there before. So it's up to us
Speaker 3to try to help figure out if there's a solution that involves the city. Maybe it's something upstream change, maybe it's something that we're just seeing more intense rainfalls, and there really isn't a solution per se to solve the problem. It's as we engage with the public, we try to take as much information as we can to better understand what the problems are and see if there are solutions in the realm of infrastructure that we can present. Sometimes those solutions are more enforcement activities. If it's a police officer helping with enforcement on speeding out of corridor. It's
Speaker 3a problem that the vehicle speeding, but it's both because maybe there's not a sufficient speed limit signs out there to let them know what the speed limit is. Maybe there's other solutions that we can come up with engineering so it doesn't feel it's comfortable going faster than the speed limit, but there's also an enforcement activity. So sometimes maybe the problem comes to us and we try to look at solutions, but we reach out to other departments within the city to help find if there's a solution that's more holistic in nature.
Speaker 2And how do we go about trying to engage the community. You hold some opportunities well, even talking about the sales tax, we've had some opportunities for people to engage on that. Let's talk about that process and how do we how do we have more of that from our public. I mean basically it's public come to these meetings when we have them, but let's talk about it.
Speaker 3Sure, So a lot of it is through engagement opportunities. Usually it's because there's a reason that we're asking for input, because we're trying to get that input before decision is made or before direction is given. Obviously we're open to input at any given time. Someone calls us up or sends it an email, contacts us through a website very very frequently just to ask a question. So we're always open to that. But if we're trying to go through a more strategic process that the city, we'll have a very detailed engagement process and we'll try to use that is reaching the audience where they are. So it's come to a public meeting, that's great. We know that there
Speaker 3are people that are busy that don't have times. We try to put those same resources out there to be consumed at their leisure. So maybe the same slide deck or the same information that shared of a public meeting is recomposed or reconstituted in a different way that can be consumed by that citizen, and always with the request to say, please look at this information and give us your feedback. Well, of the things that you like forere of the things that you didn't like. We take all that information, and whether it's through staff vetting or if it's eventually a commission decision, we present that information so that we can try to make the best decision as we can with the information available. So that's kind of
Speaker 3the typical process that we use in those initiative.
Speaker 2And how do we let people know about a public meeting?
Speaker 3So public meeting, we'll try to use as much as we can the news media outlets that we have, so we'll broadcast that information out through the channels that can expand that message. We also have our own social media and our own websites, so anyone who follows our information or follows our channels is able to get that engagement. If we know we're doing a project in a particular neighborhood and we want that neighborhood's input, we'll send out direct mailings or postcards to those individuals saying I think you probably are the one that needs to know the most about this project because this is the backyard of your area that we plan on building this new facility.
Speaker 3So we'll do a more direct engagement when we know that that's the person that we're trying to reach for those higher profile type projects.
Speaker 2As well, and we did back in December, I believe it was. We had some more community wide forums typically when we talked about the sales tax extension and what the project would look like or projects that might look like on the list. And we're not afraid to get critical comments either, are we.
Speaker 3No that A lot of times I love getting criticism. It's it's always constructive. Even if someone calls up and they're yelling and swearing, they're calling because they have a reason and they're passionate about that issue. So try to push the swearing and the yelling part aside and just try to think of what is the thing that they're really asking about, or how do we mind that data, mind that information to come up with what this real problem is and what the solutions might be. So we're always trying to extract that information. We want to have a bad solution vetted early. We don't want to get to the point of constructing this thing and then having it not work and having someone say, well, I told
Speaker 3you so. If someone has some good insights as to what the water elevation is when it rains out there, we take that neighbor's information, we try to corroborate that with what we think is happening and make sure that we all have the same understanding of what the problem is. And we get a lot of that through our public engagement.
Speaker 2Yeah, so, ibli like I just encourage you to be on the lookout for when there's notifications posted to engage, because that's how we can make better decisions as a community, and it's the information we gather from that is what we can sanitize and come up with a potential solution to fix a problem.
Speaker 3Yeah, I feel very confident if we had seventy five thousand people say we want alternatively and they all said that that we would know that we're doing right by the people. When we have only ten people engage and three of them say do this and seven of them do this other thing, it's hard to know exactly if that's what all of the public want, if that's just the very select public that engage in the process. So the more public engagement we get, the more confident we feel that that engagement reflects the view of the total public and not just maybe a couple of interested citizens.
Speaker 2So as we look to the future, where are some of our challenges or opportunities for Bismarck.
Speaker 3I think a lot of our challenges and opportunities are thinking through funding streams and how do we approach funding. We'll have a really large stormwater management and flood protection project in self Bismark coming to a head here soon. Looking at how we'll fund that project is something that's kind of decision traffic. It made in the very near future for both our local share as well as what else we can potentially get from our partners at the state as well as the federal government. So funding is always top of mind because we can have the greatest solutions possible for a particular problem that we see in
Speaker 3the community, but ultimately those cost money, and so trying to find what's the right amount of money to invest in that solution is always a challenge and it's always a top of mine sort of subject.
Speaker 2Sure, and we don't want to go and build try to build something knowing we can't fund it, and vice versa. We all raise a bunch of money and then not use it.
Speaker 3Yep. So it's kind of making sure that our analysis and our understanding of the problem is in lockstep with what we think is a legitimate funding plan. Even funding the design or whether it's performed in house by engineering staff or perform through a consultant, it takes time and resources to analyze those things, and so we want to make sure we'reundzing the things that maybe have some daylight on the end of that process to construct a solution that would solve that problem.
Speaker 2So we've talked about a lot of projects. I think it's important for everybody to understand that we partner significantly with the State of North Dakota and federal DOT to get some of these projects done. And even utilizing our sales tax dollars sometimes allows us to construct a project knowing we're going to get federal funding, but we can wait for that federal funding to coming. For example, I think South Washington Street is one of those. Is that not true?
Speaker 3Yeah, So our South Washington Street we were able to advance construct that project. So we used entirely our sales tax dollars to construct the federal aid eligible elements of the project, with the understanding and agreement from the DOT to our of Transportation that when the federal funding is available in a later year, that we would be granted those same federal funds as at that point in time, so we're able to get that project in the ground faster, which generally speaking, in the construction industry, if you build it today, it's going to be less expensive than building it tomorrow. There's always inflationary app specs that seem to
Speaker 3increase the cost as we look into the future. Rarely do we see cost savings if we wait five years. It is rarely less expensive to do something five years later. So our ability to construct those facilities early and then get paid back by the DOT a year later or maybe even two years later, we're able to see the cost savings by getting that infrastruction on the ground an earlier timeframe.
Speaker 2Right, So, is there anything that you would like the every Bismarck resident to know that's behind the scenes of the city.
Speaker 3From your perspective, I would say is we're approche air construction season. The thing that I would like everyone to realize is just to drive slowly through those construction zones when we see a cone. Hopefully we're all remembering a driver's ed or getting our permit or whatever those rules of the road are, and just slowing down because you might not know what that activity is and our ability to have potentially a construction worker walking along that cone and is a very disruptive feeling when someone's driving past at thirty five miles an hour next to that construction
Speaker 3work zone. So just encouraging as much of the public as we can to drive slowly through those construction zones as we enter that season, I guess that'd be the one message I'd want to share.
Speaker 2As much as possible, and that's I'm thank you for saying that, gay, because it is it's important we keep those men and women safe. We also keep our drivers safe for traversing through the area because if there's some construction object, it may not be a person. It might be a piece of equipment that causes an ultimate quick decision that may cause an accident. Now we've brought the police department, the fire department in someone's been hurt, like we want to avoid that, yep.
Speaker 3And when the road close sign is up or that barricade that says this road is closed, leave us. You don't have to drive past that to see what happens and then have to turn around and come back out. That's not helping anyone maintain safety. In the work sign. It's really not helping that resident get to where they want to get to. If the road close signs up, that means the road's closing.
Speaker 2In well, Gabe, thanks for joining me today talking about our upcoming summer season and the project list related to the extension of the sales tax and the value that brings to the community.
Speaker 3That's my pleasure. Thanks for having me. Thank you, Thank you for.
Speaker 1Watching Bismarck Insights with Mayor Mike Schmiz. If you have specific topics or questions you'd like addressed in future episodes, email m Schmidz at Bismarck and d doc gov. Recall the City of Bismarck at seven oh one three five five one three zero zero. To learn more about the City of Bismarck, visit Bismarck and d doc gov, or follow us on a variety of social media channels by searching Bismarck and DCOV. Bismarck Insights is a collaboration between Dakota Media Access and the City of Bismarck. You may
Speaker 1find Bismarck Insights episodes on Government Access channels two and six oh two, as well as on Roco, Apple TV and fireTV devices, on radio Access one oh two point five FM and on demand at FreeTV dot org
Nobody is credited on this episode yet.
Mayor Mike Schmitz talks to Matt Gardner.
Mayor Mike Schmitz talks to Christy Ames-Davis, City Forester.
Mayor Mike Schmitz talks to Christopher Holzer, Traffic Engineer.
Mayor Mike Schmitz talks to Noah Lindelow.
Mayor Mike Schmitz talks to Krista Rausch.