Bismarck Insights Ep. 31 - Gabe Schell, City Engineer
Mayor Mike Schmitz talks to Gabe Schell, City Engineer.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Mayor Mike Schmitz talks to Gabe Schell, City Engineer.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Welcome to Bismarck Insights with Mayor Mike Schmidz, a transparent and engaging conversational dive into meaningful topics impacting local government in Bismarck, North Dakota. Bismarck Insights is dedicated to removing barriers between the City of Bismarck and the citizens we serve every day. Good morning, and welcome to Bismarck Insights on Mike Schmidz, Mayor Bismarck, and I'm hosting the program today. Today we have back with us Gabe Shall, who's the Engineering Department director. And in the past when you
were with us, we talked about the Engineering department and its focus. But today, knowing what we had go on last summer and what we've got coming this summer, are already started in many respects road projects within the city. So let's talk about some of the projects we got going on so we can try to make people as much aware of what's happening and why and what they might have to do differently for the summer. Sure, thanks thanks for having me. Always have a fun opportunity to get to explain what is it we're
doing and why those orange cones and barrels are out throughout our community. So let's talk about which were some of the major projects that we kind of saw go on in the community in twenty twenty three, and then we'll move into what's in store for twenty twenty four because there's some carryover to some of that. Yeah, there'd be some carryover on some of our twenty twenty three projects. It was a pretty busy year for us. Last year. We had about seventy million dollars worth of work either contracted through US or through the Department of Transportation in our community. And some of the carryover work would be on those larger projects our ash Cooley Drive reconstruction project last year by Horizon Middle School.
There'll still be some permanent pavement markings that will happen this year and some landscaping. Some tie ins to some of the side streets still need a chip seal on top of them, so there's some minor work that would have to happen on that road. Other all of our projects, our main asphalt projects last year for the rehab, we come back in the second year into a chip seal and some crack ceiling on that facility before we let the contractor go or before the contract's done, so there'll be minor work that usually just kind of shows up and it's there for a couple of days and then they take
off after that. So it's not a very long duration, but there still will be some work in areas that we did work last year. So I don't be alarmed from the public when there's another construction crew that shows up and say, hey, wait a minute, we just worked on this road last year. That's it's part of the planet for us to be able to seal that road off and protect that investment. And so in addition to what the city is doing, and we have some acknowledgment of that and probably even some effort or at least helping with the corridor of State Street, there's still work going on up there. Can we just let people know to the best we
can what's happening, what the duration might be. Sure if that State Street project was about a seventeen million dollars safety improvement project last year, so as all the traffic signals and concrete pavement repair that was done, it got on a later in the season, and so some of the last tie ins weren't able to be done appropriately. Last falls lash winter. Really, So the work that's happening now are some of the pedestrian facilities, the sidewalk, some of those last items that remain that just there wasn't enough time in last year's construction season to finish. The DOT tells us it's only just a couple of weeks worth of work. So it being May now, we want to anticipate
this continuing throughout the entire summer. So the good news is for our citizens that that corridor will be less restricted than was last year. Hopefully by the time we get to mid June. Anyway, Yeah, we should have all three of those those beautiful lanes working in perfect unison. Once we get to that point, there the contractors out of that work zone. So what do we have happening in twenty twenty four? I know I'm well aware of one, but we got a couple of projects going in the City of Bismarck. Sure our twenty twenty four list of projects or a slate of projects. We have about forty or so million dollars worth of work this year, so compared
to last year, it's in some ways half last year we had a lot of state highways that were also included in our normal program, so we still did the same amount of work on our city roads, but the DOT did extra work on University Drive and as you mentioned, State Street and Bismarck Expressway. But this year we'll see our biggest profile project is our South Washington Street reconstruction project from Burley Avenue north to the South Bismarck drainage ditch that will convert that two lane rural section roadway into a three lane facility with curb and gutter,
sidewalk on one side, a trail on the other, lighting storms, who are all of those things that we expect from our urbanized facilities. That construction will take place the entire year, so that's not something that will be done in June. Like that State Street project, that will take place this year as well as parts into next year. The improvements will also include a roundabout at the intersection of Burley Avenue and South Washington Street and a traffic signal at the intersection of London Avenue and Santa Fe Avenue, depending on which side of Washington Street you're on, and those will be incorporated as well as part of these proposed improvements. And as we look at that, I mean we
obviously talked about this a year ago the year before that. Partially the decision to go and put in the facility with a not rural road but a street urbanized road. And it's driven by a couple of factors. So what is it that you and the city looks at one ways completely redo an infrastructure project like this. Sure, a lot of times we look at the three things that we look at anyway. Primarily are the pavement condition. Is that road in a sufficient area that the pavement is strong, that's still doing what it
needs to do. We look at capacity as another aspect, are there more people just trying to use that road than maybe it was designed for? And then the last thing, and maybe not the least thing is safety. If there are safety improvements that could be implemented, that's definitely a benefit of project like South Washington hits all those there's a payment conditioned aspect of it, there's a safety aspect of it, in a capacity aspect of it that when you improve that to a three lane section, it removes some of those conflicting left turns from the through lanes, so that improves the safety, but it also improves the ability just to drive up and down the road if that's your desire
to do so, by the time we would add a turn lane at all the intersections that would need a turn lane's kind of the decision prompts you just to put a continuous three section wide roadway through that whole corridor. That suffices. And I know one of the other safety measures that is being implemented, certainly as some traffic control a stop light. Right now, there's a stop sign, but that we having driven that regularly for the last fifteen years, I know what the traffic has become. And certainly there's a lot more development
around South Washington and going to be south of Barley Avenue even on the east side. Is that a pedestrian control purpose or is it just traffic pattern and speed control? Yeah. When we look at a traffic signal, generally speaking, that's required once you hit a certain vehicicular threshold, But there's also pedestrian thresholds as well that you could use to justify why you would put that stop control or that signal control in place. For this particular project on Southwater, it was the traffic, the vehicular traffic is trying to take a left or
trying to take a right, on those side streets. We plan our city road network in a way that we try to consolidate as much of that traffic as we can on a few strategic locations so that we can hit those minimum thresholds that then would satisfy needing a traffic signal, so that we can have one traffic signal in that whole corridor instead of four traffic signals spread out across the whole thing. So as well as we can, we try to funnel that traffic into one location or two locations, so so we can be strategic about the investment that we make in that infrastructure to get people on and off the road safely. And then another traffic control portion of this is the Burley
Avenue Washington Street interchange. We're putting a roundabout in there. What's the value to that versus some other mechanism of controlling traffic there. Yeah, when we look at a roundabout versus traffic signal, it's from a cost perspective, they're about the same. I mean, the traffic signal costs more money to implement the electronic components, but the roundabout is generally larger in size. There's a trade off that usually is kind of a wash when we evaluate that. What we like to see in roundabouts is that with a certain amount of traffic and how that traffic approaches those intersections, they operate actually more efficient than a traffic
signal does. To allow you to go through the intersection. No one's conflicting with you. You just get to go. A traffic signal isn't intuit enough to know that, so you have to stop even if there's no one's coming on the side street potentially, So the roundabouts have an efficiency standpoint from that that they kind of just react to the demand that's there. And there's also a very special safety benefit from them because you're entering that approach at a slower speed. If you do get in a crash or some sort of accident, it's not at a high speed. It's not an angle crash that you might
find at a traffic signal where someone runs a red light or someone advances too quickly. So from that perspective, their lower speed and the type of crashes end up being sometimes cited as a ninety percent reduction in those serious and fatal crashes. And so anytime we can find a solution that works as well or better than a traffic signal, but can do it in a safer manner. That's definitely one that we look into sure, and I appreciate I you know, I think they're on the bouts kind of. We're new to the city of Bismarck until a few years ago and nobody really understood them. But I
do see that it keeps the constant flow of traffic in that interchange. In particular, there are periods of the day where it doesn't have a lot of traffic, so being able to keep moving traffic through is going to be good. We're also adding on both sides. Now there was just a trail on the one side, which was a parks of wreck kind of trail on the west side, but we'll also have sidewalks or a trail on both sides. Correct. Yeah, we'll be replacing the trail as it was kind of in the same general location on the west side of the roadway, and then a
sidewalk placed on the east side of the roadway. So we'll have a couple of strategic locations for pedestrians to cross the road if they want to walk on the trail network instead of the bike or the sidewalk network. They have the ability to do so. But if you just want to take a walk around your block and you live on the east side of the corridor, you don't have to cross Washington Street necessarily. You can just use the sidewalk network that will be available to them when this project is completed. Then are there any other features that are going in with the ball of vards as we redevelop this trees, any kind of plantings or kind of noise, kind of reduction type
the things the primary item. We do have some boulevard trees placed as well as trees placed on the outside of the sidewalks as appropriate. So we try to beautify these corridors as well as we can. We're limited in how much room we have, how much public right of way there is to use, and so every decision we make, whether it's the boulevard with or the sidewalk with or the trail with, affects the room for landscaping. So we just try to find ways to balance all those things, working with our partners at Parks and rec working with our other departments within the city to understand what is a healthy boulevard space that we need for that tree to be successful long term,
and if we can't find that space, it's not a good planting location. Those might be spots that we would then concrete in or do some other hard surfacing in that area, so that we're on planting a tree today and then watching it not be successful in that overtime. Sure. And lastly, in this particular project, it's a major project, and it's a corridor project. How are we funding that? This project is funded through a couple of different sources. The main one is our half set sales tax that was for use for the construction and reconstruction of arterial roadways. We do have about four
and a half million dollars with the federal aid administered by the North Dakota Department of Transportation in this project as well. We also have other elements. If it was a water main that was needed to be extended, will be a cost that is borne by the water utility from the City of Bismarck. And the last component on this particular project is that there are some developer requested items in terms of where to outflow their sanitary sewer and storm sewer that we've incorporated into this project and then are assigning the cost of those improvements or those upsizes
to that development group who requested it. So we're trying to find ways in the long term to make these projects as efficiently as we can and find ways that lower our longer term operation cost as well. Point probably biggest there is other than those developer requests which are specific to their developments and the property owners within those. We've been able to avoid any major special assessment related to this project. Correct. Yep. The entire work of our South Washington Street project
on the South Washington Core, or piece of it, is paid through the sales tax or the federal aid. We do have a component of widening Burley Avenue that's tied into this project. It'll keep the rural section like it is there today, so it'll still be a ditch on Burley Avenue, but we'll widen that to three lanes instead of the two lanes that are there. And that particular component of the improvement is being special assessed against the developers who requested for that right, and so my point is is to the general public, this is being funded through an avenue we already had voted on and approved to
put these types of improvements in, and not special assessing in this particular case. Yes, we may have others this year that are different than that. So what's the next project or projects that we have going on road construction wise? We have projects in terms of for this construction years that aren't necessarily ours that we're going to lead, but there are definitely projects that our community fields and those are our projects that are on the DOT system. On nine ninety four, i'd like to bring some attention. We have two projects on the
Interstate Corridor. Ones on the Grant Marsh Bridge, which is already under construction, really has been since April. That project is rehab of the existing bridge that's there. It's a lot of guardrail, some paintings, some structural improvements, approach slabs, but all that work. To do it requires one lane of traffic to be closed down during construction. So that started in April and that will likely continue through the end of our construction season through October that our residents will see that those improvements are done. But that is a fifteen million
dollar plus contract to do that work. So it's not a minor item by any means, but the cost of that is born entirely by the FEDS and the state to do that particular improvement. The other The big one that's just getting going now is our Exit one sixty one interchange reconstruction, and that project, for those unfamiliar with what Exit one sixty one is is Bismarck Expressway and Centennial Road or the intersecting minor streets. That project's really started its process in twenty twenty when the DOT identified that as a project they wanted to work on. So from twenty twenty through now has really been the designing and planning for
this project. Now in twenty twenty four, we'll start that construction. That project will consist of entirely removing the existing interchange that's there. That interchange is a diamond interchange, which is kind of what you see at most spots throughout our community as well as any other community. It's the most efficient, lowest cost interchange configuration with a ramp on the north side of the interstate and a ramp on the south side of the interstate for egress onto and off of the facility. That over time becomes problematic when there's more traffic wanting to use that
facility than the diamond intert can provide. So we were seeing that even with the number of lanes we had on Centennial Road in Bismarck Expressway, there are still conflicts, and those conflicts then spill back onto the interstate. And when the interstate has a conflict, you can't really back up traffic on the interstate. That's a really big no no. And Duty saw that and prioritize this as a need that they have on their statewide system. To improve that project will build a new bridge just to the west of the existing structure, and so what we'll see in twenty twenty four is that new bridge being constructed as
a single point urban interchange, so all of the ramp movements or the majority of the ramp movements will come into one intersection. That will then the signals will control witch drivers get to go. But inable to do that, we're able to let these non conflicting movements occur at the same time, which allows for efficiencies that we weren't able to realize with the existing configuration. So twenty twenty four is of building the new bridge and getting that one ready. There'll be some tie ins and some work in twenty twenty five construction season will be then bringing all the traffic over onto this new bridge and then removing the old
bridge and then even into twenty twenty six, there will still be some remaining items on there. So it'll be a project that will start in earnest here shortly, and when it starts, it'll continue while the weather's good and while the season is conducive for construction, and then there'll be a winter shutdown period where we'll open up the whole thing again at that point. So, as we go through the construction season this summer, what kind of traffic flow restrictions are we going to see at that particular interchange, because that's a major a major change and a major structural edition which is going to obviously cost traffic pattern
disruption. Yeah, so throughout construction, there'll be at least a lane closure throughout construction on that corridor, so as you're going north or south, you will likely not have both lanes available to you. Thankfully, the DOT and the city and the federal partners that we have on that project all have a unified interest in keeping the interchange open, so you'll always be able to get onto and off of the interstate at that location. Throughout construction. We have a fire station in that vicinity, and it is very important for us to be able to maintain access onto and off of the side streets throughout construction. So the DOT has ensured that will be the case. We'll be able to
respond adequately through the construction zone throughout the duration of this project, but we will find that the capacity of that interchange will be lessened just to the fact that we'll be closing some lanes off to able to bring equipment in and out as well as build a new bridge. So is there a recommendation what people could do to maybe avoid that to still get to where they need to go, or I mean, are are there alternative paths that we see as routes churgels who live in that area. Maybe well, outside of helicopters, we'd
start with helicopters, if that's a choice, But outside of that, if you're driving the vehicles like we expect most people would be. Really it's sometimes it's even just changing the time that you go through a route, and that's the case in Bismarck and lots of areas. If you hit that spot at five o'clock, it's busy. If you hit that at four forty five, it wasn't. You hit that at five pint fifteen, it wasn't what we see during our construction season is kind of a two part thing. Our school traffic obviously drops lower, so those trips from someone's house to a school, back to a house than to work, those kind of go away, and so our traffic actually dig decreases in our summer months because of that. But
then we see this increase of displaced traffic that then occurs because maybe the road's closed or maybe it's a restriction, and we find vehicles going in a different route. We don't really have a dtour route per se for that Expressway and Centennial route because it will be open, but those that I think will have figured it out pretty quickly if that's faster for them to go on the route that they used to, or maybe it's another half of a mile to go on a different route taking Nineteenth Street or taking State Street to get to where they need to cross the interstate. It might be longer today to do that,
but they'll find that that might be shorter once construction starts in full. Moving forward, the point is, you know, residents be aware of these improvements are to help safety, and it also make sure that the structures are going to allow traffic to flow, but be patient with us. Do we have other projects that are in the community that are going to have an impact to residents on a regular basis for traffic flow, any other street repairs or
I think it all depends on where you live and where you go. I think that's what it boils down to. We have maps on our engineering website at BISMARKND dot gov slash streets that has our construction map of really everything that we plan on doing this summer or say this construction season, because it extends from spring, summer and even into fall. It doesn't tell you what's happening that day. Necessarily, it's not telling you this is a lane closure on XYZ Street at ten pm or ten am. But it does show you what's in store. And so one of those primary projects that we are talking about this year will be a concrete pavement repair project on E Century Avenue from Fourth
Street all the way over to Tyler Parkway and including Tyler Parkway. So, once again, if you live on the south side, work on the south side, shop on the south side, go to the school on the south side, you might not even know that this project's happening. If you live on the northwest part of the community and you probably do use Century Avenue and this will be a project that would affect you. It's just concrete payment repair. But in order for us to take that one panel out of commission once again, we have to close down a lane. One thing that we'll find is a little unique about this project is we will be moving, depending on the phase of construction, all of the traffic to either the north two lanes
or the south two lanes and give the contractor the entire rain over their work zone. So we're hoping that those are some things that they can make those repairs faster and find those efficiencies so that they can get out of that work zone faster, and that helps them, it helps us, it helps the public. But it might be a little disconcerting for the public to be on the wrong side, if you will, of the road during some of those phases. But we'll have adequate traffic control out there showing the public where to go and then bringing them back on to the normal right side of the road, if you will, once they're through that work zone. As part of
that project, we will be turning off some of the traffic signals. Some of those signals are more critical during the school year, particular at Ithaca Drive, that is a signal that it's needed during the school year, but when school is an incession, there's not as much traffic that makes its way through that intersection, So we'll be turning that one off to give the contractor the ability to use that whole intersection get out of there quickly instead of having to maintain a signal and kind of work in quadrants and take what could take a month to get through that intersection, he'll be able to do and in a couple of weeks. Instead, we're doing the same concept at Fourth Street at
Washington to be Fourth Street and Century Avenue. We'll be converting that to a stop sign control, which will still allow traffic to move, but it might not move as quickly during some of those peak hours. But once outside of Century High School's school season, we'll find that less traffic uses that facility as well. So we try to put into our contracts dates that they can't start until such and such a date and dates that they have to be done by so that they can make sure that they're working in those areas at times that there's less traffic occurring. Wonderful, and I noticed there's another. I think
it's on Divide if I got the right street I'm thinking of right now Fourth and Divide. Is there a project going there or is that not necessarily your department? So that's that's our department as well. Once again, if you're if you live in north west to the north central, you'll feel that project. This year, we're doing a water main replacement currently in the month of May and into June on Divide Avenue from Fourth Street along the north side of the Capitol till about eight or ninth Street or so. As part of that project, we will have to close some segments of some side streets during that
operation. But once we're done with the watermin replacement, we are using this opportunity then to come in and reconstruct that roadway into a concrete section. So similar to what we've done on other segments of Divide Avenue over by Sleepy Hollow Park by twenty sixth Street as well as a couple of years ago. Last summer, we did the same concept on West Divide Avenue closer to Tyler Parkway and College Drive area. We'll convert that asphalt roadway into a concrete section, which will mean we won't have to come back into that area as often. So it's a longer construction project that will see initially, but then once that
roadway is in concrete, we won't have to go back and maintain that road with the same frequency moving forward in the future. And this is an example of us trying to do well to projects effectively or take care of multiple issues all at once. So replace the water main, take care of pavement. So we were not coming in and doing pavement then all five years and that later all we should have put water main in. Yeah, we're trying to create some efficiencies. Yeah. When we look for those efficiencies, I mean each each facility is a system, whether it's a water main system or a network, or a sewer main or a storm sewer pavement. We look for
those efficiencies. If we look into the needs of that system for the next five years and a capital plan, what are the things that are needed And if someone highlights an divide avenue, we need to be working on the water main. And we're from a street perspective, we're also looking at the same thing. We try to figure out is it best to combine those is to one project do it at the same time. Is it best to do the water main and in a given year and then come back in the next year to do the street. Sometimes we look at that and other times we look at it and say, these are independent enough that the efficient way to do this is to not have them combined, because we don't need seven contractors working in the same corridor at the same time. It's going to be faster,
easier, more efficient to let some of these tivities occur early and then come back in later if it's a light reconst signal project or some other standalone facility that might be able to be done in a year or two after the pavement. Okay, and then let's look forward just a little bit to twenty twenty five. What's out there that we should let people know might be coming or is coming. So twenty twenty five are our high profile projects, I guess, first of all would be the continuation of some of these projects that are happening. So I think for first and foremost that Exit one to sixty one
project will still be in full force at that point in time for that interchange reconstruction, our projects on the city side, as we look at our big types of improvements, our next half cent sales tax projects scheduled for twenty twenty five is the reconstruction of east Century Avenue from about Centennial Road to the east to where the road ends at cost to drive. So we'll convert that two lane road into a multi lane five lane facility similar to the rest of what Century Avenue is for our community. It's a really important road for us. It parallels the Interstate running east west across the really the entire comunity. But
as part of that project will also be extending Century Avenue to the east and too really new grounds. It's not areas that are developed currently, but will be securing easements and rights of ways to move that roadway and connect it to an intersection of a fifty second street, which also would be a new extension to that facility. So it'll be about three thousand or so feet of Century Avenue being reconstructed and then about two thousand or so feet of extensions of these roads that will then provide some additional connectivity into and out of the neighborhoods in northeast Bismarck, so they don't have to rely on just their one way in or out, but it can rely on a couple of different options for them
to get in and out of their their subdivisions or their places of business. It probably gives a little better emergency response to some areas, or for sure we'll plan for the emergency response needed when those areas developed. Yeah, it definitely will allow secondary routes if if the main route is closed, or if the crash is on XYZ Street and that street's closed while they're attending to that emergency. That providing other ways to get in and out for those emergency responders is another primary reason. While the city is pursuing a road project outside of what is the current developed area of the city Bizbar, so it is a
little bit new for us, so we take it on with a couple of steps. We need to make sure that we know that the need is there for the facility, so we don't build a road that really goes nowhere, even if the vehicles aren't driving on it. Our seasons are flying and are freezing, our winters are tough on roads even if no one drives on them. So in a minute we put it out there, it starts its expiration date even if there's not a car driving on it. So we want to be careful about not putting roads out everywhere and using this strategically and connecting things that we know are our needs. Well, Gabe, thank you for updating the citizens of Bismarck on what's happened, what's going on now, and I'll
little look into what will be coming next year and the way of road infrastructure work. Thank you for joining me today my pleasure. Thank you for watching Bismarck Insights with Mayor Mike Schmiz. If you have specific topics or questions you'd like addressed in future episodes, email m Schmidz at Bismarck and d doc gov.
Recall the City of Bismarck at seven oh one three five five one three zero zero. To learn more about the City of Bismarck, visit Bismarck and d doc gov, or follow us on a variety of social media channels by searching Bismarck and DCOV. Bismarck Insights is a collaboration between Dakota Media Access and the City of Bismarck. You may find Bismarck Insights episodes on Government Access channels two and six oh two, as well as on Roco, Apple TV and fireTV devices. On Radio Access one oh two point five FM and on demand at FreeTV dot org.
Nobody is credited on this episode yet.
Mayor Mike Schmitz talks to Matt Gardner.
Mayor Mike Schmitz talks to Christy Ames-Davis, City Forester.
Mayor Mike Schmitz talks to Christopher Holzer, Traffic Engineer.
Mayor Mike Schmitz talks to Noah Lindelow.
Mayor Mike Schmitz talks to Krista Rausch.