Road construction season always tests your patience, especially when you don’t know what’s changing day to day. Nick Schirripa from the Michigan Department of Transportation gives an update on the 2026 Michigan construction season and what drivers in Battle Creek, Marshall, and Calhoun County should expect next.
Episode Resources
Michigan Department of Transportation Website
MI Drive Website
ABOUT COMMUNITY MATTERS
Former WBCK Morning Show host Richard Piet (2014-2017) returns to host Community Matters, an interview program focused on community leaders and newsmakers in and around Battle Creek. Community Matters is heard Saturdays, 8:00 AM Eastern on WBCK-FM (95.3) and anytime at battlecreekpodcast.com.
Community Matters is sponsored by Lakeview Ford Lincoln and produced by Livemic Communications.
Do you have a non-profit you'd like to hear highlighted on Community Matters? Go to our website and let us know!
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Richard PietCommunity Matters, that's us. Thanks for finding us here at 95.3 FM on a Saturday morning, Battle Creekpodcast.com. Where you get podcasts, Community Matters, Calhoun, Cody. We're just about everywhere. And if you really want more, you can follow us at Battle Creek Podcast on Facebook, and you might even see me there running my mouth. You thought there was enough of that already, but uh I do that a little bit there too, talking a little bit about what's coming up in the week on the program.
Richard PietSo follow us there too. One of your favorite things, go ahead, admit it, is road construction and all the barrels around and that which we deal with at this time of the year. So we're moving pretty rapidly through the Michigan construction season for 2026. Nick Schirripa is back with us now from the Michigan Department of Transportation to talk about how things are going here in Calhoun County. Hello, Nick. Hello, Richard.
Richard PietI think it might have been 50 degrees cooler the last time we talked, and we were readying for this season. Probably not the most arduous season that you've dealt with as far as these things go, but it's not been dormant either, right?
Nick SchirripaIt has been an interesting season. You know, we've got a couple of big projects. You've got the obviously the big I-94, I-69, Michigan Avenue rebuild over by Marshall. We've got the big I-94 rebuild project over in Barrian County. I just saw the Benton Harbor adding a lane to 131 here in Kalamazoo. So we've got a few big ones happening. Yeah. Um, but it has really been a season of quick hit projects, right? And when I say quick hit, for us, we have kind of two different starts to our season. We have the big construction kickoff in the spring, and then usually right around early mid-July, right up to the fourth of July holiday, we'll see a kickoff of those second half projects.
Nick SchirripaSo we've had a lot of first half, second half projects this year, and not just a handful of big one-year or multi-year projects. So it's it's been kind of that strange kind of year.
Richard PietAnd you know, it's interesting because the longer projects we get time to get used to those, plan around them, et cetera. The quick hit ones, sometimes they show up and we say, hey, where'd that come from? And then it's gone right away. We really have had to pay attention to the MI Drive construction list.
Nick SchirripaIt has been a season of moving barrels. That is certainly accurate. Yeah, as soon as you get used to it being there, it's gone. My drive is is absolutely one of those tools that even we rely on to see what's going on at any moment uh because things can change so quickly.
Richard PietAnd I say this every time you're here, but I'll say it again. Folks who are on that Facebook page where people talk about construction and slowdowns and things of that nature, I always love it when somebody says, What's it like driving to wherever? Boy, you could find out yourself on the MI Drive map. It's so cool and interactive and up to date.
Nick SchirripaIt really is. And it, you know, certainly understanding that folks have to be, I think it's part of our culture. We become very reliant on social media. We become very reliant on any kind of crowdsourced information like that. And it certainly is helpful when you're planning a trip for your family and you can just reach out real quick with a Facebook poster, throw something on X, and in minutes you're going to get a dozen responses from folks you know. Yeah. Um, but with that same same investment of time, my drive is there and can certainly let you know what you're driving into and driving through.
Richard PietI do get it. Some people want to hear someone else offer a testimonial for what they've seen out on the roadways, and I get that. But what is on MI Drive is put up by humans, right? It is indeed.
Nick SchirripaIt is not automated.
Richard PietYeah, it sounds a little silly to phrase it that way, but in our AI age, this is not it. This is uh human interaction. Yeah, good.
Nick SchirripaThere is no A to that I. These are real folks who are doing real work every day to make sure that that map is as up to date as possible. And that we have real-time posting of of incidents too. If there's a a crash somewhere, a down tree that's blocking a road, those kinds of things. Those reports come to us from uh local law enforcement and emergency services, and they get posted real time to my drive. So it really is, I think, in point of fact, I think it really is real-time information for folks to use.
Richard PietYeah, and you can filter that map to see construction zones, to see incidents that might be out there. Even in the winter, you can see the camera view from the plows, and you can see the camera view from the poles, the cameras on the posts out there.
Nick SchirripaYep, and you can see all the messages we have on our digital message signs that are out. You can get a look at the there's a speed layer, which will give you an idea if traffic is moving at or near posted speed limits or if it's moving slower. So you can see where there's congestion, whether it's because of a crash or not. Maybe it's just a rush hour. Uh, but you get kind of a feel for that. Uh again, all real time.
Richard PietAll right. So uh Michigan.gov slash drive is where you'll get that. And then in the upper left, you get that little legend there where you can filter by uh any of the things that we've talked about. So speaking of which, real construction going on on I-94, not the largest uh zone of construction, but it's there and uh and they've been working for a while.
Nick SchirripaYeah. And we certainly have a number of projects that are that have an impact on folks' daily commute, right? And that might be more important than the size of the project itself is the impact it has for folks in in their daily lives. And yeah, we do have a fair number of those out there that that folks should be aware of if they're not already. I'm sure if they've driven anywhere near it, they're painfully aware of it. But yeah, you certainly want to make sure folks are aware of those.
Richard PietAnd what is going on on 94 in Calhoun County?
Nick SchirripaOh gosh, where do we even start? So the easy one uh is the one over by the casino. Uh we are rebuilding that stretch of 94 uh and that interchange uh with M311 or 11 mile road uh that's being done this year. That is a big one. Obviously, we've got some we have some lane closures on 94. That interchange is closed for the most part, working folks around that. And that's all part of that bigger Marshall modernization project. Folks remember last year we were at I-69 and Michigan Avenue and Marshall. We're here this year, and then next year we connect those two projects.
Nick SchirripaMost notably the work along it'll be Michigan Avenue, making that a boulevard, all the way from this interchange by the casino all the way out to I-69 and Marshall.
Richard PietIt's gonna look completely different, isn't it?
Nick SchirripaIt really is. And that's all part of that Marshall area jobs, opportunity and recreation campus build out. Certainly, folks are familiar with the four battery appointments coming there, but that's just one piece of that. But in their planning of that, that build out, one of the questions they had was what kind of uh traffic are we gonna expect? And they were looking at a pretty significant increase in not just the number of vehicles, but the size of vehicles in and out, lots of commercial traffic there. So we plan to build out that area in order to accommodate that increase in traffic volume without having a negative impact on the local traffic, the local commuters and folks just trying to get to work and church, right?
Nick SchirripaWe wanted to be as convenient for them as well. So that involves some pretty big projects. Michigan have I-69, I-94, and M311, and then that whole Michigan Avenue Boulevard corridor between 994 and I-69.
Richard PietAll right. And so this year's phase of that will go until the snow flies, I assume.
Nick SchirripaYeah, we're looking at a mid-late November to be done. And you know, so far everything's on track, but there's still time for Mother Nature to have other plans for us. But yeah, yeah. So this year we'll be done by uh in theory, uh, by mid-November. Uh, we'll have rebuilt that interchange. Most of it will be done by the end of this year. Obviously, we'll have some tie-in work to do next year when we start that that project. But this year we're rebuilding I-94 between F-Drive North and Agerson Drive, uh, reconfiguring the interchange at M311, rebuilding the M96 Bridge, the Michigan Avenue Bridge over I-94, and then rebuilding M96 as a boulevard uh right in that area from Wheatfield Parkway to M311.
Nick SchirripaSo it's kind of that little stretch of it. Uh, I guess it'd be to the west of that interchange. So uh that's this year. And then next year we come back and we connect that. We're gonna turn M uh Michigan Avenue M96, uh, make that a boulevard from M311 all the way out to almost I-69. We we did part of it last year, I think the C drive north, maybe somewhere in there. Yeah, but connect those two next year.
Richard PietSo if El Nino, they say this is gonna be the strongest El Nino ever. I've seen at least one or two reports of that. Means that it's gonna be less snowy. Would you work longer? Would you work into the winter?
Nick SchirripaThe short answer is no, and that's because of how the contracts are drawn up. Yeah. Given that this is a multi-year project, there certainly would be an opportunity there to take advantage of some warm weather, maybe to get a jump on next year's work, maybe to complete some of the smaller stuff they do at the end of the project. We come back and you know, we have to we reseed or do some of that, you know, tree planting, those kinds of things. Maybe they get a jump on that. Uh, but for the most part, no. That just means we have a shorter pothole season, yeah, in in theory, right?
Nick SchirripaWe're gonna use less salt in the long run, which isn't a bad thing, right? We're not bad about that. But I think long view, no, not necessarily. They'll take advantage of it where they can. Uh, but just the way projects are drawn up, the way contracts are created, there's not really the opportunity to just keep building out uh as the weather stays nice.
Richard PietAll right. So these projects have been pretty much on time, you said. Did I get that? Yeah.
Nick SchirripaYeah, we really are doing well. We had a couple of projects uh around Battle Creek. We did some work uh on Michigan Avenue and Battle Creek I-94 business loop between Dickman Road and the Amtrak Railroad. Uh that started back in late May, and I believe that's been wrapped up or is wrapping up as we speak. There was another project uh on M66 that started in mid-April. Um, and that was uh right around Athens area from M60 to S Drive South, and that should have been wrapped up in the past week or so.
Nick SchirripaSo we've got a couple that are wrapping up. We've got a couple that are very active. The Washington Avenue Bridge rebuild in Battle Creek that is going through probably mid-October, but everything, all signs point to good things happening there. We do have closure there. Uh, is it Helmer? I want to see a piece of Helmer is closed while they're doing some of the bridge work, but that's uh a short-term closure.
Richard PietThat Washington Street Bridge is a big project and a very well-traveled bridge. So we've got to figure our way around that. Yeah. Uh I know I have. And sometimes you like the alternate, sometimes you don't. That was my experience, but you figure out your way around it. But replacing a bridge is a long stretch, takes a while.
Nick SchirripaIt can be, and it can also be quick. The problem is, is the quicker we make the project, the more impact it has to local traffic. Interesting. So we've seen bridges that we've built part width. Maybe it's a four-lane bridge. We rebuild two at a time so we keep two open, right? That takes a little bit longer. It maintains traffic across the bridge, but the end result isn't the best bridge we can build because it has that seam down the middle.
Richard PietI seem to remember this, yeah.
Nick SchirripaThat seam is open to moisture, it which leads to rust, it leads to concrete deterioration. So it doesn't last quite as long. So maybe instead of a 40, 50-year bridge, it's a 25, 30-year bridge, right? It takes a little bit more uh in maintenance to keep it together for those 50, 60, 70 years over the long haul because you're there more often because of that one seam, it really is what boils down to. On the other hand, we can rebuild an entire bridge in half the time and have a better product at the end, but that means closing that bridge entirely for five, six, seven, eight months, which means we're detouring folks around that bridge.
Nick SchirripaAnd in the case of a bridge like Washington Avenue, that is a major north-south connector for Battle Creek. We're moving a lot of traffic to a different place, but we're doing it for less time. So that's kind of a trade-off, right? What do folks want for the end product? What do they want in the meantime?
Richard PietYeah, and there's been other work going on around it, and that's not necessarily m dot work, but there's been other work going on around it. Uh, I think I'd been using Camley instead, and then that one was closed last week, so it uh went further down. And yeah, so you just figure out your way around it. But this is uh good thing to remember that closing it completely results in a bridge that lasts longer, which is is important.
Nick SchirripaI'm gonna temper that a little bit. They both last the same amount of time, but a bridge that's built as one piece won't require as much maintenance over the long haul, right? I just don't want to give people the idea that if we're building a bridge part width, we're gonna have to be back sooner to rebuild it. We'll be back sooner to do maintenance on it, but it'll last just as long. And certainly we're not gonna keep it open if it's not safe.
Richard PietThank you for that. All right, right. Why are you doing that bridge anyway? I mean, you know, when you think of M dot routes, you might not be thinking about the Washington Avenue Bridge in downtown Battle Creek, right? Why is that your bridge?
Nick SchirripaIt's M89. Over the course of the last 116 years, state routes have designations have changed a little, things have moved around. Certainly M89 now isn't what M89 was when it first started. But yeah, that is M89. That is designated as M89, so that is under state jurisdiction.
Richard PietYeah, the M routes are M dot routes.
Nick SchirripaM's, I's and USs.
Richard PietAll right, so good. And uh there was also something uh going on on uh Beetle Lake Road, I think, uh, as well, which uh is part of that uh 294 project as well.
Nick SchirripaYeah, Beetle Lake Road, which is how everybody knows that road name, that is M294, it's a state route designation. Uh we just started this week repairing that bridge uh over the Kalamazoo River. It's about a half million dollar investment. And there's a laundry list of things we're doing, but it comes back to that bridge maintenance piece we were talking about earlier. This is one of those things we have to do periodically to keep bridges open, safe, all those things. It is not a terribly long project, but it's long enough to be an annoyance. It is closed while we're doing it, right?
Nick SchirripaSo we should have it open by mid-September is when we're looking. So it's a little over a month, but yeah, we do have to close the bridge to do that. So we're gonna be detouring folks uh on I-94, I-194, or the penetrator. That's just fun to say, uh, and M96 uh Columbia Avenue. That's the detour to get around that bridge from either direction. But again, what we would call a quick hit project that's a pretty short-term project, but it has significant impact. So for the seven, eight, nine weeks we're gonna be there and have that bridge closed. I mean, that's a couple months folks are gonna have to get used to a new route on their daily commute to work.
Richard PietHow about that uh business loop stretch in the south end of the airport there off to 94? You got some work still going on there.
Nick SchirripaYeah, that is an alternating closure. And if I remember correctly, we're just doing some resurfacing there, uh, some repaving. But again, one of those projects that we've got to get in and get it done. So alternating lane closures, it's only gonna be about six weeks. We'll be done in theory, we'll be done by mid-September. Again, it'll be open though, so it's it's a little less of an inconvenience. Folks should be able to use that route. Just gonna have it keep your eyes open for where those crews are because safety notwithstanding, uh, just getting used to which lane to be in will change one week to the next.
Richard PietAll right. And you mentioned some other things that are in the region, not necessarily in Calhoun County, but a lot of us happen to go 94 to 131. You talked about that lane widening. This is that stretch between 94 and stadium drive that uh is getting an extra lane. Yep. And sometimes there are backups there.
Nick SchirripaWell, there are backups there all the time anyway. So that movement, uh, anybody who's familiar with that interchange, I-94 and 131, westbound to I-94 to northbound 131. That's right near Oakland Drive. Lots of folks get on the highway there. That is a very popular movement. And even prior to this project, we were seeing daily congestion issues, particularly during the week 7 a.m. to 9 a.m. was one, but not nearly as bad as the evening peak. So 3 p.m. to 6, 6:30, 7 o'clock p.m., we were seeing lots of congestion issues.
Nick SchirripaAnd that's been ongoing. I mean, we're 15 years removed from the expansion project of I-94 at that point.
Richard PietYeah.
Nick SchirripaSo for the past decade and a half, we've been watching and trying to figure out what the best route was. How do we address some of that? Certainly, we can't tell fewer people to drive there. So, what we learned over the years is that one of the most popular movements is Westbound 94. And then getting off at Stadium Drive. Part of that is related to Western Michigan University. Part of that's related to access to downtown Kalamazoo. And both of those destinations have got new options that are open. Last year we reopened uh the I or 131 business route interchange, just north of town, that now is a full interchange.
Nick SchirripaYeah. Was a partial before, now it's full. So more options there for getting in and out of downtown Kalamazoo if you're heading north or coming from the north, and you don't have to rely as much on Stadium Drive or West Main. So there are some different traffic patterns emerging. So the solution we're proposing here and we're building out is an auxiliary lane that connects westbound I-94 to Stadium Drive along northbound 131. So if you're getting off of westbound 994 onto US 131 northbound, there will be two exit lanes.
Nick SchirripaThe right exit lane will stay a lane all the way to Stadium Drive.
Richard PietOkay.
Nick SchirripaAnd get off at Stadium Drive. So if that's the movement you're making, you never have to change lanes. You're getting off, you're getting on, you're getting off, all in the same lane. Uh, and then that other exit lane from westbound 94 to northbound 131 will get you on a northbound 131 proper, and you'll go past Stadium Drive. And again, you won't have to change lanes. So there certainly will be some lane changing happening, without a question, but by adding that additional capacity just in that small stretch, just a couple miles, hopefully we're gonna reduce some of that congestion by easing the movement to those destinations.
Richard PietYeah, that should be a huge help because anybody who's done it knows what that's like traditionally. You come around from westbound 94, northbound 131, and you gotta look over your shoulder and be ready to get in that traffic because it's a common. Yep. And of course, if you're driving northbound past 131, the advice is to get over in the left lane to allow all this traffic that's coming over that has to get over in a hurry to do so.
Nick SchirripaThis should be uh a big relief to that. Certainly. And I think you know, it's gonna take, I'm gonna go out on a limb here. It's gonna take a few months, I think, for traffic to really settle into that new alignment once we complete it this fall for folks to get used to that auxiliary lane and used to a new lane pattern. But give it a couple months, give it a few months, people are gonna settle in. And once people settle in, I think we're gonna see a lot of that congestion eliminated or at least reduced to a point where it's not stop and start on 94, on the exit ramp on 131. You might be only going 35, 40, 45 instead of 70 miles an hour, but you're going to keep moving, and it's it that accomplishes the goal.
Nick SchirripaThat if we can keep traffic moving at a safe and prudent speed, I think we nailed it.
Richard PietAll right. So there's uh what we know about what's happening now as we start to look at the end of this uh 2026 season. You heard Nick say uh the Marshall project will continue next year. Any other big things that are coming next year that we know about yet?
Nick SchirripaUh not that we know about yet. We're still several months away from really having next year's program dialed in and being able to share any kind of details or schedule. But you mentioned the Marshall Modernization Project. That's worth, I think, a a little bit of a deeper delve or at least a second mention because now we're not working at an interchange or on an interstate. We're working on Michigan Avenue.
Richard PietYeah.
Nick SchirripaUh and how many people every day drive M96 between Marshall and Battle Creek at any point. So we're gonna want folks to be really aware of that one because when it kicks off in the spring, you know, it's the last year, it's a the third year of a three-year, $335 million investment. It's a huge investment. Uh, it's a giant undertaking. So we really want to finish with a bang, right? We want to make sure we get this one right. So when we kick it off in the spring, uh obviously we'll let folks know when it's all starting. We'll give them the dates, the detour routes, all those things that they need to know beforehand.
Nick SchirripaBut kind of getting that in your head now and being aware that, hey, come next year, M96, Michigan Avenue isn't going to be available to me, at least to the same extent and capacity it's available now. Might want to start thinking about some alternate routes that are the most convenient for me. You know, we post detours frequently, Richard, and you've seen this where we put up a detour that may take you five miles out of the way. And that's because of the limitations we have for posting detour routes. But one thing we always try to tell people is find the alternate route that makes the most sense for you.
Nick SchirripaIf it's a public road, it's open to your use. So by all means, don't use our detour route if it doesn't make sense for you. If there is a more logical, reasonable route for you to take, by all means use that. We just need to have that posted for folks who are just passing through and may not be familiar with the area or their destination doesn't fall between the endpoints of that detour route. So start thinking of that now.
Richard PietGood to know. Uh have some sign guidance that can help you in those uh situations. Okay, so uh I'm sure we'll talk again in the spring and we'll have a sense for what's happening when the details come available. But you've planted the seed for us now to remember and expect that's what will be happening next year in that Marshall Modernization Project.
Nick SchirripaAnd while I can't go into details, Richard, I can tell you beyond a shadow of a doubt, there will be other road projects somewhere in Battle Creek area, Cow County. We're gonna be doing something.
Richard PietAmazing. I know it's weird. So out of character. No, we're kidding, of course. Uh yeah. So we'll look forward to those details. And of course, in the meantime, Michigan.gov slash drive, all that info we talked about, which is really a terrific map, and it's up to date, and it's human interacted. So you don't have to uh question whether that's is that real? Yes, it's real, and it's being maintained. All right, Nick, we always appreciate the updates. Thank you.
Nick SchirripaPleasure, Richard. Thanks so much.
Richard PietNick Schirripa with the Michigan Department of Transportation on Community Matters.
Representative-elect Jim Haadsma returns to talk about election night uncertainty and lay out what we wants Lansing to tackle first, from prescription drug costs, utilities oversight, and local projects that bring...
A new grant through the Calhoun County Land Bank Authority makes it easier for low incoming families to fund minor repairs to their owner-occupied homes in Albion and Homer. Krista Trout-Edwards and Quinton Hay break...
Mika Roinila and Shaun Morrison with the Salvation Army Battle Creek talk through some of the new programs their annual Red Kettle Holiday Campaign will help fund throughout 2027 for those in need across Calhoun and...
Stephanie Cornish from the Harper Creek Optimist Club pulls back the curtain on organizing the Battle Creek Christmas Parade, including how the lineup is engineered and why spacing matters to ensure a smooth route. She...
Rick Stover with Veterans Helping Veterans Southwest Michigan Foundation returns with an update on how the organization is using a $50,000 grant from Blue Oval and an event designed to help senior veterans unlock...