In this episode, Jason dives into the concept of standard unit sizes and their critical role in construction logistics. Using examples from NASA rockets, shipping containers, and international transport, he shows why standardization isn't just a guideline, it's essential for smooth operations, supply chain efficiency, and on-time delivery. What you'll learn in this episode: Why standard sizes exist and how they impact supply chains. How international shipping and transportation influenced construction standards. Why "trade partners won't follow the system" is a management problem, not a people problem. How to pre-plan and enforce precision for prefabricated units and delivery. How standardization prevents bottlenecks and improves flow. Are your prefabricated units and deliveries running on standard sizes, or are you leaving efficiency to chance? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Hey there, welcome everybody out to podcast number 1633. In this podcast, I'm gonna talk about fitting things into standard sizes, standard delivery units. If you're interested in that, please stay with us. Welcome everybody. I hope you're doing well and staying safe out there. This podcast actually came from the continued insinuation that trade partners and vendors argue about participating on site, which I think is nonsense.
And I don't think it's real, first of all. And the other thing is, even if it does happen, I think it's nonsense. But another thing is that I just finished writing Elevating Construction Logistics. Actually, another announcement, I finished writing the rest of the lean books as a part of the series, Elevating Construction, The Lean Way. So flowing together on attack time and pull is posted and QC'd, total participation and visual systems, and then quality and continuous improvement.
Those are loaded, but not QC'd, so I wouldn't recommend doing it for another week. But I'll have those buttoned up here in another week, which means, by the way, I don't know if anybody knows this. The Kindle versions of those are downloadable. I actually do that with all my books, which means that you can load the PDF into AI if you ever want to create checklists or guides or posters or distill down lessons or blah, blah, blah. Like, I do it that way on purpose in case you ever need it.
But those are done, and I'm learning so much from it because the information is from my research, from my base knowledge and content and manuscripts, and if I do it on an AI chat, it pulls in the wisdom. And one concept was standard unit sizes. Excuse me. And I really enjoyed, and I can't remember where I first saw this, but, and there's gonna be one customer here, that standard sizes
come from somewhere. Like, if you look at the rockets, this is where I originally heard the analogy, the component sizes for rockets that were sent on, or that were used, sorry, on NASA jets, jets? Rockets, sorry, NASA rockets, I apologize, to send the space shuttle into orbit, some of the components had to come by rail line to
NASA, which had to go through bridge, or sorry, railway tunnels. And that determined the size it can fit and transport. And actually, it works not just on rail line, but like that holds true for other types of transport, bridge heights and tunnel heights and things like that, et cetera, which were actually, the railway tunnels were built around a standard boxcar, which was built around the standard
railroad wheel width, which was built from the old wagon ruts from the pioneer days, which the wagon ruts were built from wagons that were, they can trace their way all the way back to the Roman Empire. And the wheel width was based off of the width of a horse's ass. So the joke went, and I don't know if it's true or not, just so you know, if you're like, I'm gonna fact check that, you should.
But I do know that it was in a presentation that I saw a long time ago, and I thought it was funny at a minimum, that the conclusion was components from the NASA space shuttle, the size of them was determined by the width of a horse's ass. Anyway, so that was a joke, making fun of that, but it is real. I'm sure that there are, there are standard units that are based off of something that
you would think are pretty simple. But in the Lean book, I'm bringing this back around, the Lean book, what I found out is that standard container sizes for shipping containers, which also fit on railways, which also fit on the backs of trucks, are an actual thing. Like they are a thing. It helps international transport. It helps supply chains. It helps logistics. Instead of having a lot of different sizes for transport containers or storage containers, they now
have a standard unit that works with cranes, that works with trucks, that works with railways, that works with tie-downs, that works with shipping. And the point that I wanna make is that vendors don't argue about fitting things into a box car. Like they're like, how can I fit these metal panels? How can I size these engines? How can I size these tires? How can I size this unit to be put into transport? Because that's the standard international shipping container size.
It's just common. And when I hear general contractors say, well, they won't ship it like that, or they won't box it like that, or they won't ship by zone, or they won't transport it into the prefabricated unit sizes that we need. What are you talking about? I don't know if anybody knows this, but in the Incredibles, there's a fashion, there's a superhero fashion designer who creates all their super suits who is talking to Elastigirl.
And she's like, what are you talking about? You're Elastigirl. Like, I always think about like, what are you talking about? Vendors are arguing about tack times, rhythms, prefabrication unit, prefabrication unit sizes, crane pick limits. I don't think so. The entire international order is based on standards. And not only is it based on standards, but it's the only way that it would properly work or else everything else would get
bottlenecked. So the key here is that, like this myth that trade partners won't fall into a tack time system, that vendors won't fall into a delivery system and that they're just gonna dump it over the fence is false. All it is is a lack of management, a lack of leadership because everybody in the logistics value stream, they're used to these things. The reason, again, that we don't get what
we want the way we want it is because we don't standardize it and expect it because we don't pre-plan it. And so that's not a dig, that's just saying, if we wanna get better on job sites, we've gotta stop catching mistakes on the job site and we've gotta start pitching accuracy and precision. Meaning we've gotta start asking for what we need in the right sizes, with the right standards, according to the right tack time, the way we want to receive it on project
sites. So take that for what it's worth. It's a very big topic for me and my brain and I hope you all found it valuable.
Avoiding the hardest problem rarely makes it disappear; it usually gives it more time to grow. In this episode, Jason explains why one of the best ways to improve projects, leadership, and even your own peace of mind is...
When estimating durations, people tend to drift toward one of two dangerous extremes: padding the schedule because they have been burned before, or promising unrealistic performance because they believe they can push...
You do not need authority over the entire project to start leading. In this episode, Jason shares a story from his own career to explain why the most effective way to lead from below is not to wait for permission,...
A three-week pull may look like Lean planning, but Jason argues that it can leave teams focused on what is directly in front of them instead of preparing the entire phase properly. In this episode, he explains why...
A great meeting should do more than share updates it should expose what is off track and help the team solve it. In this episode, Jason breaks down the purpose and flow of the Level 10 Meeting from the Entrepreneurial...