My fellow pro-growth/progress/abundance Up Wingers in America and around the world: What problem does a data-center moratorium solve, exactly? As these warehouse-sized supercomputers face growing public backlash, they’re blamed for higher electricity bills and strains on the power grid - all while failing to provide enough jobs or tax revenue. But are they actually the problem, or are they exposing problems that have existed for years in America’s electrical grid? Today on Faster, Please! - The Podcast, I am joined by Shuting Pomerleau, the director of energy and environmental policy at the American Action Forum, where she studies electricity markets and energy policy. We discuss New York’s controversial decision to pause construction of large data centers, whether AI is really driving up electricity prices, the economic benefits of data centers, who should pay for expanding the grid, and how states should respond to growing demand for power. In This Episode: * New York’s Data Center Slowdown (0:16) * Dealing with Demand (7:09) * What is the Right Step Forward? (14:24) * Who is Paying Up? (19:27) * Can Regulation Fend Off Data Center Growth? (23:39) * Where Do Data Centers Go from Here (27:44) A lightly edited transcript of our conversation will appear in my Week in Review issue on Saturday. (Another option is using the Substack auto transcript function.) But here are some edited highlights from the chat: On New York’s data center moratorium… My concern is that pausing this will send a very strong signal to investors, data centers and developers, a very chilling signal saying, “you’re not really welcome here.” This is such a fast-moving space. One year is actually a lot of time. On what’s really driving electricity price increases… What has been really driving the electricity increases mostly in the residential sector is the local distribution system - the maintenance, repairs, upgrades that cost a lot of money. It was almost like a coincidence with the AI data center boom and the sentiment against AI. We see that in electricity prices, but if you look into the real price level changes, it’s still quite flat both at the state level and across the country. On the policy challenge of funding AI infrastructure… What is a fair share? That is a question that has always been on my mind. The data centers are not all sitting there across the country doing their own thing separate from the remaining population. They’re providing digital services and great services for us, you and me, using AI. So, what is a fair share? How can they pay exactly how much they use? On the economic benefits of data centers… The opposition to AI data centers is probably one of the biggest pieces of misinformation out there. The right way to look at it is these are businesses that are paying taxes; they’re paying property taxes. If you look at Loudoun County, about 90% of the county’s operating budget comes from data centers. On whether regulation can slow the AI data center boom… I think of the AI data center boom in the United States as a fast-moving train. It’s going to move; it’s going to happen. I think the New York States moratorium, some of the local opposition across the countries may slow down some of the application of development, but not very significantly. I think what will have a material impact on the pace of AI data center development is all the discussion about who’s paying for it. On what needs to happen with data centers… First, permitting reform. It will alleviate the burden off of a lot of people’s minds, and a lot of stakeholders’ minds. Two is, we really need some reform in our grid, in terms of interconnection. I would say interconnection is your keyword, both on the generation side, connecting to generation sources and to large load customers. On sale everywhere: The Conservative Futurist: How To Create the Sci-Fi World We Were Promised This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit fasterplease.substack.com/subscribe
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_00Welcome to Faster, Please!, the podcast. I'm your host, Jim Pethokoukis, and my guest today is Xu Ting Pomerleau. She's the Director of Energy and Environmental Policy at the American Action Forum. And today we're going to talk about data centers. Let's begin with New York Governor Kathy Hochul's decision to pause construction of very, very big data centers in New York, at least for a year. What problem is that moratorium supposed to solve?
SPEAKER_00And is a pausing construction, is that a proportionate response in your view?
SPEAKER_01Yeah, thanks for the question. This is really timely. For those of us who are paying really close attention to the AI and data center electricity market field, It was not really a surprise. Recall that last month, Maine almost passed a moratorium on data centers as well, but the governor vetoed it. So from my perspective, I think this one year pause of new construction of very large data centers, more than 50 megawatts,
SPEAKER_01is supposed to, well, officially they said they wanted more time to study the reliability, the impact on their customers. They want more time to rolling out more thoughtful frameworks in terms of addressing the huge soaring AI demand. That is what they claim that they want to solve. In my opinion, the sentiment is really... Not only here in Virginia,
SPEAKER_01I live in Virginia, across the country, a lot of people are opposing data centers. I started doing research on data centers last summer. Just within one year, the sentiment across the United States towards data centers has changed a lot. Notably, the moratorium is only applicable to
SPEAKER_00new construction projects.
SPEAKER_01Anything that has been approved, permitted, currently they have hit the ground, under construction, those won't be affected.
SPEAKER_00There will be new data centers being built in New York over the next year.
SPEAKER_01And there's quite a bit of that in the pipeline. If you look at across the country, obviously Virginia is the first tier market. New York is considered a second tier market. A lot of data center developers, they may not prioritize that, but it is quite attractive given the condensed businesses and population in that state. My concern is that pausing this will send a very strong signal. To investors, data center developers,
SPEAKER_01almost like a very chilling signal, like, or you're not really welcome here. This is such a fast moving space. One year is actually a lot of time. If you think about the competition, what it takes to build things, connect to the grid and find customers for data centers.
SPEAKER_00I certainly understand thinking about this in sort of the political context where AI seems to be, you know, very unpopular and data centers are viewed as sort of an obvious manifestation of that people can sort of see and protest. But there is like a real thing happening. I mean, just to focus, I mean, we'll set aside the stuff about water. Let's just focus on electricity, like prices. Are going up.
SPEAKER_00I mean they're going up nationally and they're going up I guess maybe more on the on the on the east coast. To what extent on the east coast or New York specifically can you blame like as of like right now and over the past two years that data centers have driven that price increase?
SPEAKER_01That's a very great question, James. So historically, up to say of now, there has been electricity prices increase. If you look at the electricity market, both at the state level nationally, it has remained relatively flat over the last couple of decades, just starting from 2025. And this year, if you look at a nominal prices level for these areas, the electricity prices have indeed increased dramatically.
SPEAKER_01Relatively fast, especially in the residential sector compared to industrial and commercial. Now, there are plenty of credible studies out there. The literature tells us that the price increases in the residential sector was not driven by AI data centers. If you think about the electricity market, there are three components, generation, transmission, transmitting the electricity over long distances. Distribution is really going the last mile of delivering the electricity to,
SPEAKER_01say, a rural house in the middle of nowhere. So what has been really driving the electricity increases, mostly in the residential sector, is the local distribution system. The maintenance, repairs, upgrades, that cost a lot of money. So it was almost like a coincidence with the AI data center boom and the sentiment against AI And we see the electricity prices. But if you really look into the real price level changes,
SPEAKER_01it's still quite flat, both at the state level and across the country.
SPEAKER_00But it seems like it's been higher on the East Coast. I mean, that's my perception. Is that right?
SPEAKER_01Yes. So the price increases are much faster in states like Maine and California. That really stand out and on the East Coast too, especially the states sitting under the Regional Transmission Organization, PJM. For the listeners who are paying attention, sometimes it pops up. It's referring to the Regional Transmission Organization covering 13 states. But not New York.
SPEAKER_00New York's not in that, right?
SPEAKER_01Not New York. Not New York. New York is its own thing. New York Independent Operating System. So these states have huge AI data center demand. We have aging infrastructure. If you look at a lot of the thermal baseload power plants, coal and natural gas, they're retiring faster. And a lot of the new projects, say solar, wind, new natural gas power plants, it takes them quite a few years to be connected to the grid,
SPEAKER_01to be able to bring electrons to the grid. PJM is this mess. I've been hearing a lot of challenges.
SPEAKER_00If you want, I think a sympathetic view toward this decision by the New York governor would be this. You're right, like that there's a lot of, you know, Investments that need to be done. We have aging infrastructure. And maybe to some degree, there's a bit of a coincidence that these data centers have come online and electricity prices have gone up.
SPEAKER_00But there's going to be a lot more data centers and they're going to use a lot more power. And going forward, they're probably going to take a big, they're going to need a lot more energy and we're going to have to build more and we have to, you know, make the, spend even more infrastructure. So going forward, there's going to be an impact on So maybe we need to pause and we need to figure it out. And even setting aside some of the maybe potential environmental impacts, we have to figure out like how we want to pay for this. Should the companies be playing a role?
SPEAKER_00Should I put a tax on it? So, I mean, I guess that would be the sympathetic view that there's going to be this increasing demand. It's going to cause prices to go up and we have to sort of pause and figure it out. I mean, that would be sort of taking her at her word now. And if I take her at her word, would the pause be the best way to deal with this uncertainty and, I guess, the certainty of greater demand?
SPEAKER_01My short answer is no. I think a better approach would be to, if you're really worried about a lot of the huge data centers more than 50 megawatts, Applying to be in the pipeline, you could do some regulatory tweaks and say, maybe we'll need to put in more requirements to study the feasibility rather than a blanket ban. Now, with this one-year pause, I'm quite skeptical that it will actually do anything to solve the issues
SPEAKER_01in New York, in New York State, fundamentally. If you really look at the Emissions regulation for the state is really a hodgepodge patchwork of climate regulations.
SPEAKER_00What occurred to me is like, if she's worried about electricity prices, just tell these companies, either you have to either build your own power or you have to pay us money. Like that to me would be like a simple move rather than we need to pause and think about it.
SPEAKER_01Yeah, exactly. In Virginia, they actually passed a new electricity rate class for hyperscalers, like large data centers, at the end of last year to be effective starting in the beginning of 2027. What it says is if you're certain large scalers above certain threshold of demand, you need to be paying at least 80% of the contracted demand in terms of transmission and distribution costs and 60% of the generation.
SPEAKER_01Is 80 and 60 really calculated based on science? I don't think so. It's more like arts. But like with the politics and policy, you could go in and say, all right, guys, you can build data centers here, but we really need more transparency and see how much cost you're shifting or not shifting to our residential customers.
SPEAKER_00And it also, and maybe this will play into some of the difficulty maybe in building these things and some of the climate rules. It also occurred to me that, one, in New York State, I think, like, they just either shut down, like, a nuclear reactor. There's the, I guess, the Indian Point nuclear plant. They're not going to restart that nuclear reactor. So it seems to me like that's on the state. And more broadly, if you have not been doing Sort of what you should as a state
SPEAKER_00that makes sure you have sort of a modern electrical grid. And I realize that power demand has gone up a lot lately. But isn't that what government is supposed to do? Like that's a public good, being able to have an infrastructure that can supply adequate energy, preferably clean energy, for business. It seems to me that like the state has not done that. They won't reopen a nuclear reactor. It seems that all the focus here is on what the company should be doing or not doing.
SPEAKER_00And the state has sort of thrown up its hands and saying that like, it's not our job to do that. And you need to have an, you need to pay a tax or higher rates or something. So, I mean, that, that's sort of my simple, like knee jerk version is like what the state has, like the state has failed here.
SPEAKER_01Yeah. So I think you're, Spot on here, Jim. So in terms of the data centers thing, I think as one of the many types of hyperscaler, large demand customers, it does get excessive scrutiny, especially over the last couple of months. I think politically it's easier to pick a target and say, you guys are not welcome here. But to your point about the state, Doing its responsibility about making sure there's enough electricity on the grid.
SPEAKER_01So like three things again, generation, are you really allowing as many preferably clean but affordable energy sources to be able to generate electricity in the state? The answer is no. They have very, very stringent climate regulations. New York is in the Regional Greenhouse Gas Initiative, a couple multiple state cap and trade emissions program. Not only that, they have a very strict clean power, net zero emissions target by certain years.
SPEAKER_01On top of that, they also have a certain procurement target. We have to have this many gigawatts of solar and wind by this year. If you look at it as really arbitrary. And heavy-handed state regulated is not really letting the market doing its job. We're not setting a framework or principle approach to allow as many energy sources onto the grid as possible. So that's the generation side.
SPEAKER_01Transmission, we talk about permitting reform a lot in this country. That's really a complex issue with the federal and state local issues. It's the state investing enough transmission lines to bring power from the generation sources to the customers and local distribution. So I do not think the data centers is the only factor here contributing 100% of the potential problems.
SPEAKER_01I kind of think it's kind of a scapegoat, like a high-profile moratorium that I'm skeptical how much it's going to do. Maybe it will just deter a lot of the future investment in New York State.
SPEAKER_00I think you can accept going forward that if we're going to build a lot more data centers, they're going to use a lot more energy and someone has to pay for that. And I know there's two ideas that have popped up. Maybe they preceded this pause in New York. Maybe they are about the same time. There's one idea which is to create a federal rate freeze where utilities would pause rate hikes in exchange for access
SPEAKER_00to cheap federal credit and expedited permitting. That's one idea. I think both these tend to be sort of left of center ideas. And the other idea is imposing an excise tax on data centers, investment, With the proceeds of that tax going toward modernizing the power grid, building more transmission lines, transformers. So one, there's kind of like a rate freeze that's worried about rates and an access for cheap credit to modernize the grid.
SPEAKER_00And the other one is a tax to finance the modernization. Any of those ideas seem attractive to you, assuming I've explained them in adequate detail.
SPEAKER_01Yeah, so the first proposal of rate freeze in exchange of something the federal government can get to the states. I don't think that's a good idea. Just like housing, the housing crisis, freezing rent is not going to increase your supply. Freezing electricity rates is definitely not the right way to encourage more generation and bringing the electron to the grid. Now, I've heard that there are some arguments saying, well, this is not a simple rate freeze.
SPEAKER_01You freeze the rate in exchange for some funding and permitting. It goes back to my point about permitting reform. It's such a complex issue. There's very limited things at a federal level that they can do. So for Federal Energy Regulatory Commission, they regulate interstate commerce and transmission. Maybe they They participated in the wholesale market, but most of the retail electricity sales is within the states.
SPEAKER_01So yes, if something is completely within the state's authority, maybe the permitting, the federal cannot help much at all. It's really up to the state authority. If they really try to meddle with the affairs, it will open up a lot of vulnerabilities to litigation. So first idea, I don't think it's a good idea. The second idea, Virginia actually started doing. It passes one of its kind first, whatever you call it, energy tax on AI data centers.
SPEAKER_01It's about 11 cents per kilowatt. It's the first tax like that across the entire country. Now, what's interesting is the context of that tax was they had a huge budget fight at the state government. Some Democratic senators or lawmakers, they disagree with the further expansion of data centers. So they have a huge hole in the budget they need to fill, about 11 cents. And they say, well, for every kilowatt you use,
SPEAKER_01we'll put a tax on it up to $600 million, and then we'll stop. And they haven't really decided how to use the funding. I think it might go to the general fund. But this is one of many ideas to try to get data centers to pay for their quote unquote fair share, right? Like what is a fair share? And that is a question has always been on my mind. The data centers are not all sitting there across the country doing their own things separate from the remaining of the population.
SPEAKER_01They're providing digital services and great services for us, you and me using AI. So what is a fair share? How can they Pay for exactly how much they use. I think the tax is one of the angle. There are many other ideas that there, and if you really want to compare the two, I think maybe the second one is if the data centers are willing to pay and then you tax them, that's a fine idea. But how about if you pause the sales tax exception for these data centers?
SPEAKER_01There's a lot of states marketing it as A preferential treatment or incentive for investment. So because that electricity market is very complex, it's hard to imagine that if you have a big pot of money coming out of the data centers, you can for sure use that money to improve the grid, transmission, distribution, and lower residential bills. There are too many factors out there. And depending on how you use that money, I don't think it's a very...
SPEAKER_01Straightforward, simple issue.
SPEAKER_00Well, someone's got, so there needs to be, assuming we're going to keep building these data centers and people are going to find a value for artificial intelligence, who ultimately, like, so I guess you've kind of answered this, but just to be clear, so who should pay and how do they pay?
SPEAKER_01So that's a great question. I think who should pay and how do they pay? So I have a little bit of background expertise in tax, but I think of it as statutory and effective, right? Statutory, I think the entity that directly needs to pay for the power is definitely the data centers. I mean, they are the infrastructures or facilities that are consuming a lot of the energy. So whoever owns these data centers should be directly responsible for the payment of
SPEAKER_01the electricity they consume. But who will be paying for it? That's a great question. These companies like Google, Facebook, Meta, Amazon, they have customers and users, whether that's businesses or consumers like you and me, and they operate in a free market, in a market competition, so they can pass on increased costs to their consumers. So that's another question. It seems to me in the debate of AI data centers and electricity.
SPEAKER_01There's no such thing as a free lunch.
SPEAKER_00There's no such thing as a free lunch. Someone's got to pay.
SPEAKER_01Yes, who's paying on the paper? I think the discussion is more about that, in my opinion.
SPEAKER_00Also, I mean, another bit of context is there's sort of this assumption that, certainly I think it has been promoted by some sort of anti-data center activists, that these big Warehouses are built. We stuff them with computers. They use a lot of water. They use a lot of electricity. There's like one security guard or something who works at these warehouses and they don't supply any Yeah, I would say that sentiment, the opposition to AI data centers is probably one of the biggest pieces
SPEAKER_00of misinformation out there, right?
SPEAKER_01It is true if you think about actual headcounts of jobs created. They do create a lot more jobs in the initial construction phase of these data centers. They hire construction companies, electricians, hook up everything, and then once you're done, you have all the computers running there 24-7. But I think the right way to look at it is these are businesses. They're paying taxes. They're paying property taxes. If you look at Loudoun County, Which is really the hub of Virginia data center alley.
SPEAKER_01It holds about 80% of the data centers for the Commonwealth. I think Wall Street Journal had a all that out this week saying about 90% of the county's operating budget comes from data centers. Now you and I can hear sitting and debate on whether it's a good thing to I think the right way to think about it is...
SPEAKER_01What sort of a regulatory and investment environment does your state or local county want to project for businesses? There are companies selling goods and services to end customers. They're not just walking around corporations. We all use their goods and services. I think it's important to think about that from that perspective and not fall from these very emotional narratives against AI data centers.
SPEAKER_00Back in February, I was reading a report from Goldman Sachs, and that report argued that local moratoriums and all this regulatory pushback was unlikely to slow data center growth. To what extent is this going to limit the number of data centers we build going forward?
SPEAKER_01Yeah, so I think that's a good question. I think of the AI data center boom in the United States as a fast-moving train. It's going to move. It's going to happen. I think the New York State's moratorium, some of the local opposition across the countries, may slow down some of the application of development, but not very significantly. I think what will have a material impact on The pace
SPEAKER_01of AI data center development is all the discussion about who's paying for it, how much should they be paying for it, are they paying enough of it, will really drive the discussion between utilities, federal, state regulators, and data center developers and consumers to really weed out some of the not-so-serious developments unless I'm really ready to pay for how much is considered fair. Fair share.
SPEAKER_01I'm not going to call up, say, PJM and say, hey, study my project's feasibility to be connected to the grid. So I think that may have some positive effects, like making sure everything that's announced, say 10 gigawatt, is really going to be realized. I think that might have some of the material effects. The moratorium, I don't really expect a lot more states are going to follow suit. There may be a couple more. But I would be surprised if Virginia, say, right,
SPEAKER_01the data center alley, who hosts 70% of the entire world's internet traffic, would have a moratorium next month. Then we'll probably have to have another podcast discuss why we got it wrong. But I don't think so. I think it won't slow down that much.
SPEAKER_00To a senator and one bit of policy advice to a governor, what would those two bits of policy advice be regarding data center regulation?
SPEAKER_01Senator and governor.
SPEAKER_00Yeah. So one federal, one more state level.
SPEAKER_01Yeah, I think for the senator is really understanding How the electricity market works and be very careful about the federal state authority. You don't want to create more litigations and put things in a more dire situation. Right now, it takes a couple of years to connect a new generating source like a solar wind power plant to the grid or for a large load data centers to be connected to the grid. That's several years. So for governor, I think
SPEAKER_01The advice is, it's a very difficult job right now, I understand, for any governor, especially when it comes to AI data centers, you need to really think about prioritizing. I understand the political requirements, you need to appease some of your constituents, your opponents, but whether you're prioritizing environmental regulations, we talk about that, or economic development, Or just some political gestures and midterm is coming,
SPEAKER_01you want to do something that's perceived as popular, but may have long term unintended consequences. It's not easy.
SPEAKER_00My advice to Washington would be to pass permitting reform, make it easier to build stuff in this country.
SPEAKER_01Yeah, I think many, many people will agree with you 100%.
SPEAKER_00And I was going to ask this earlier, but let me ask it now. Would it be better if all these data centers just brought their own power? You know, maybe they can't do it right now, but you know, whether it's building, whether it's natural gas turbines or I don't know, in five years, maybe it's small modular reactors. Should they just, you know, would that be like a good solution if technically possible?
SPEAKER_01Yeah. So that's been discussed a lot. It's called like off the grid, bring your own power. So the biggest challenge is The electricity market, the utility sector is a heavily regulated, very complex market. It's completely different from your everyday competitive market. A lot of these tech giants like Google and Meta, they're doing what they are best at, right? Which is innovation, technological development, AI race.
SPEAKER_01They don't necessarily want to be in the utility sector. Energy sector, energy market, it's a whole completely different sector. You need to deal with fuels, fossil fuels, as opposed to renewable energy going through the local state and federal
SPEAKER_00regulations. They would rather get it from the grid if possible.
SPEAKER_01Yes. And also there's another important component is... Efficiency of technological advancement, right? They might consume so much power right now that it warrants investment in a natural gas power plant. And mind you, I think Bloomberg NEF had a study out earlier this year saying that even if you look at a natural gas power plant, It is 60% more expensive than previously to build a natural gas power plant because
SPEAKER_01of the supply chain and the turbines and all the terrorism regulations. It's not easy. It's not like I can just bring my own power and build power plants. It takes at least several years and you're going to get the approval from all the utilities. And also the wind, natural gas turbines has a huge delay. If you were ordered one today, You might get one in five years if you're lucky. So it's not that easy. And as the data centers get more efficient,
SPEAKER_01they may consume less energy, they may consume less water. If we do have the technology where if you have excess energy or electricity, say you have solar panel or solar wall in your house, you are able to sell some of the electricity back to the grid. You may add some money or get some credits for future electricity bills. So I think there are a lot of considerations here and because of the permitting challenges in the United States,
SPEAKER_01it may add at least a couple of years if they want to bring their own power and that will delay their timeline significantly.
SPEAKER_00My last question, for this not to be Such a hot button issue over the next five years. What needs to happen?
SPEAKER_01That's a difficult question, Jim. I don't think one single thing, probably a couple of things.
SPEAKER_00First, permitting reform.
SPEAKER_01It will alleviate the burden off of a lot of people's mind, a lot of stakeholders' mind. Two is we really need some reform in our grid, both Interconnection. I would say interconnection is your keyword, both on the generation side, connecting to generation sources and to large low customers. I think those would be two key aspects, permitting reform and international interconnection pipelines.
My guest this episode is James Coleman. James is a professor of law at the University of Minnesota and a nonresident fellow at the American Enterprise Institute. At AEI, he focuses on energy policy and regulation....
Welcome to Faster Please! - The Podcast, the audiovisual companion to my Faster Please! newsletter. I am your host, Jim Pethokoukis. My guest this episode is Dr. Kevin Cannon. Kevin is the principal at Starbench...
My guest this episode is Chelsea Follett. Chelsea is a research fellow at the Cato Institute’s Center for Global Liberty and Prosperity, where she works with HumanProgress.org. She is also the author of the Past...
My guest this episode is journalist and author Art Tavana. Art is currently a PhD researcher at the University of Southern California, focusing on Disney and fan studies. He also teaches courses on Disney and technology...
My guest this episode is Stephanie Wakefield. Stephanie is an assistant professor of Urban Planning and Environmental Design at Florida Atlantic University. She is also the author of a wonderful recent article in...