SPEAKER_04Order of the assembly of the whole meeting for Thursday, October twenty-third.
SPEAKER_04Thank you, Lord Burnham. That brings us to a capital projects funder each.
SPEAKER_00Thank you. Um so the capital projects, sales tax, and CPV all sort of go together, but I'll try to sort of split this off into two different, you know, into different discussions. Um so for capital projects, I guess I'll go over my summary and I have some thoughts. We've we've had some um, we've been looking into funding sort different funding sources. And so I would like to, there are some changes that I would propose to make to the budget that I give you.
SPEAKER_00Um, and I just would like to hear your thoughts on what you like to see, what you might want to put off, or what you think. So um, so starting with the summary, we have ongoing projects, and these are projects that we are under contract for, or we're going sort of to the next phase of those projects. Uh, the first is the school restroom upgrade, or it's restroom and also doors and access. Um, but we will be complete with design this year, and we're hoping to phase the construction over two years, and this is just to spread the cost out over a couple years.
SPEAKER_00Um, so you'll see in the budget for 26 is the critical restrooms, getting those constructed first and then moving on to the doors, access control, and the remaining restrooms. So that's 1.2 from sales tax in this budget. Uh, the harbor, the wave barrier. Um, we've been we've had this in our budget for a couple of years now, and we just don't quite get to it. We've been, we have some divers who have been down this year, and we asked them to look at the wave barrier.
SPEAKER_00So um we're thinking that I feel like realistically in 20 in 26, we would be looking at understanding what's wrong with the wave barrier and what needs to be fixed instead of budgeting for the entire project in this coming year. So that's sort of split into West Creek subdivision development and planning. So we have all our testing done. Um, the plat is done. All we need to do, or what we didn't need to do next is design.
SPEAKER_00So um the public works committee talked about this and they recommended including 140 or 138 and change, but I rounded up to 140 for engineering for um what we have planned out there. And that's coming from the land fund. Uh, Garden City Park, Garden City RV Park Utilities. Uh so we're still in a design contract, and it's it's um it's been a little delayed from what we first expected.
SPEAKER_00We knew there were some obstacles we had to overcome, but it it's looking like that's definitely going to go well into FY26. So we've just budgeted at this point for the remainder of that contract in 26. Um, and I sort of I gave you a list of what you know what we need to do next in order to get to that 100% bid ready drawings. So we're we'll continue to look at funding sources, and I can talk more about that.
SPEAKER_00Um, but with construction potentially in FY27. Um, for parks, we want to keep, we're still working on community garden remediation. And so we're going to have all the testing and um and a management plan in place from DEC this year. And that management plan, and also as an aside, if there you have any questions particularly about any of these projects, I've got um Tyson is here, he can answer some detailed questions.
SPEAKER_00But so we should, you know, I originally we had a chunk of money next year to do all the remediation or you know, to do all this development and stuff at the community garden site, but I start I split it up so that we can just slowly we it would be nice to have a management plan generally for seven pastures as well, before we, or and you know, a really specific plan about how we're going to develop the community garden before we throw a lot of money at it.
SPEAKER_00So you'll see that. Um, for the port, so all of the port projects are being funded from port funds. So we're not seeing any sales tax or CPV funds going into these. Um, rock slide mitigation. This is, you know, you're familiar with this one. Um, we've got our grant, which is being used for the design for phase one. And we have 326,500 of port funds budgeted for next year for our matching funds that we're obligated to pay.
SPEAKER_00But then also we hope to be starting with the CMGC construction part of things. And so we're paying the CMGC contractor granite out of port funds. So that's a separate line in your budget. We're not, we don't want to commingle those two, so they're separate. But so 2.8, we're we're starting that this year, and then next year, um this is an estimate of what we think it would take to finish the design and starting the construction.
SPEAKER_00So we don't know what the construction will cost yet. So this is just an estimate of ours. Um, we do have a million dollars budgeted for just general rock side rock slide safety and maintenance. And that's something we want to keep up on. Um, it's not just the main slide, but the south end of the of that slope where we're seeing rocks coming down. So we want to make sure we get up there before the season and you know, pull down any loose rocks and things like that.
SPEAKER_00Uh so the shore power assessment, you just approved that contract. And it's getting late in the year, so we're just putting some money in to finish that next year. And that's something we have an agreement with Borough Creek Holdings to do. So I would like to get that finished. Um, the anodes, um, I talked to Cody, and we're likely going to be done with the anodes this year. So that's probably gonna come out. Um, electrical, we're at least going to re for electrical and fire suppression, we think we can reduce these numbers with better estimates as because we're further along than we were before.
SPEAKER_00We have a better idea of what's gonna be left. Um, so cruise float dredging. I will be talking to Cody about this too. 800,000 is for to complete the project. And so I really want to sit down and talk to her and look at our schedules and understand if all of this actually is going to be spent next year or not. So that may come down. Um, oh, actually, the cruise, we hope to get this one done in FY26.
SPEAKER_00It's the deepening project that we're gonna look at the schedule for and maybe reduce some of those um expenditures in FY26. Sorry, I get them mixed up. One is just a very small dredge project under the float, and the other is the entire basin, and it'll take longer. Um, so under public works, we have Main Street. Um we'll we're done with our concept with the work of our engineers to do scoping and conceptual drawings.
SPEAKER_00And so what's left to do, I think we're compiling all that data and we're gonna get it to um, I guess maybe the public works committee first, but eventually the assembly can select a concept that they want. So once that's done, we would then be able to go into engineering. And in order to sort of, we the we were thinking that we want to stay on this. You know, we know that it's a really expensive project. We don't have funding for it right now. And so we thought maybe each year we could knock out a little bit more design.
SPEAKER_00And so I had put a million dollars in in FY26 to get to 35%, but I'm now thinking that we might put that off, partly because um we just submitted an application for rural assist the rural assistance program, and we requested 2.5 million. So that could get us probably to 65% design. And then there's a potential to apply for the build grant for it. And then also we just have um something that we need to think about, and it takes a little while to prepare for it, but we could consider DEC loans.
SPEAKER_00They're low interest and therefore um, you know, therefore, clean drinking water. It's the clean water sort of set of loans, but we would need to get those projects on the list first and sort of do a pre-application, get them on the list, and then we could be eligible for the loans. So that's another uh thing we can do. And so I'm thinking that I would probably remove Main Street from the budget for next year.
SPEAKER_00Um, solid waste, our big incinerator project. So we should be complete with design. We can phase this over two years, and we're looking at$4 million a year. So this is going to be this is one of our big ticket items that I have on uh big ticket items that I have on my list. So you'll see that there's some there's some big ones that are really taking most of the funding this year. That's one of them. We sweater treatment plant upgrades.
SPEAKER_00Uh, so we should be done with design here pretty early in FY26, and then we'll go out to bed and start on construction. And this is the one we have a$10.2 million grant for. And so um we do have a matching. Um I forgot, I didn't write it down. Um, we have a matching obligation for that. Uh, so next year the grant would be about$5.3 million and we would have to match 1.6.
SPEAKER_00And then the following year it'll be a little bit less, but the bulk of it would be spent next year. So that's sort of a big chunk of money as well that we need to spend on that matching, the matching funds. Uh, water tank assessment. So um I think Tyson and I talked about this a little bit, and I think that um we may be able to tone, you know, get this down a little bit.
SPEAKER_00Um, we just our tanks are getting older, we need to see what it's gonna take to fix them, or they're these beautiful, you know, redwood tanks and they're not easily maintained. I guess there's um it's a bit of a specialty, right? Uh so we may make some adjustments there. Uh well controls and pump construction. Um so we've got 500,000 budgeted in FY26 for that.
SPEAKER_00That could also um, we may be able to phase that out a little differently as well. But those that's all this it's designed. Um, and then another focus that we're that we have this year is our building maintenance projects. So we had a condition assessments done on McCabe, A B Hall, the school, and the rec center. And there's a lot that needs to be fixed.
SPEAKER_00And our engineers were able to put them in categories for us. So critical fixes that need that need to be done within the next five years, and then sort of the five to 20 year time. And so we're focusing on the critical one to five years. Uh, we wanted to take the first year and just do the way we thought to approach it was engineer first and then phase out the projects later. And so you'll see on the capital improvement project list that um we're sort of taking it in phases.
SPEAKER_00And so for the Rec Center or for the McCabe building, we're going to spend, or we'd like to spend 172,500 to um to design these various ADA um upgrades, health, life and safety upgrades, do a structural analysis, mechanical upgrades, HVAC upgrades, and design those. And then we would um then we would take it in chunks after that. So FY27, we do the mechanical and electrical upgrades and the HVAC upgrades.
SPEAKER_00Um 27, we would then start to design for the next chunk and do that next chunk in 28. And so, and I I wrote this all out. I won't go over it in too much detail, but so that's for McCabe, the Rec Center. We want to start engineering for HVAC and ADA improvements. Um, their their HVAC system has needed um needed attention for quite a while now. Um A B Hall, we're not going to start on that until 27 because they're um those can wait a little bit, but not for long.
SPEAKER_00Uh, the school was probably the biggest one. Um, and we feel that it's very important to keep up with this because it's kid our kids and we need to be compliant with ADA. We need to make sure they're healthy and safe. And so, but the first uh the first big effort is going to be for the ventilation system in the school, and it's it's going to be a big project. Uh, we have 620,000 budgeted in FY26 to design the upgrades, and then we'll go from there.
SPEAKER_00And then after that, there's you know, playground ADA issues, gutters, downspouts, interior lighting, panels in the janitor and boiler rooms, just various um sort of safety upgrades that we need to do. Uh, other port projects that are um that were are sort of almost a little in the periphery, but the industrial dock, we're waiting to see if we get the PIDP grant. And so that is showing on your list under a grant funded item.
SPEAKER_00If we don't get the grant, it won't be, we won't be spending the money on it. Um, port office remodel. The port offices are moving to the CLAA building beginning, um, I think their lease is up in November. And so we just wanted to put some money in each of a couple years just to get the building to where we want it. Um, and then we need to assess the port offices and what can be done with them.
SPEAKER_00Uh Marine service platform that's dependent on the UConn funding. And right now we're doing, we're completing the permitting, as you know. Uh, we would also like to start doing a condition assessment of all the port facilities, which we've started chipping away at. We've got divers looking, you know, inspecting all the underwater, um, all the underwater structures. So you'll see that in there. Um, projects we have not budgeted for or that we don't have in the budget in 26.
SPEAKER_00Uh, we think that the dispatch upgrade will be done this year. Um, so the land trust, the contract is funded in this year, but until I think until we know what we want to do with that, I would look to put it in once we get to that point. Um, but right now there's no funding in in the FY26 budget for it. Uh, West Creek Levy improvements, it would we're we would really like to find a funding source for that.
SPEAKER_00Um, it needs to be done and it needs to be done. It's 100% designed. And um, so it's just allocating the funding and getting it done. And it has to happen before the subdivision does, but if we're still in engineering, we should be good to wait on it this year. Uh, A B trail development. So that's the rifle range to DIE. The contracts we have right now will be complete in 25, and we don't currently have funding in 26.
SPEAKER_00So I that one is another one where we need to do some work on the planning. And I would suggest leaving it out until we know what we're gonna do. Uh, recreational cabin construction, that's another one. We've got we've procured a lot of the materials we need for the outhouse. We have the cabin. Now it's just um finding consensus on location, um, on location, basically. So there's nothing right now in the budget for that.
SPEAKER_00Welcome garden um that recently went to public works committee, um, will be done with 35% design. And then at that point, the assembly would need to make some decisions about how they want to proceed with it. Um, and so we don't currently have funding in FY26, and that's something that we could add if we have a path forward. Uh, the fender modification, we completed that a while ago. And then wastewater treatment plant 301H, I mentioned this before, it's been moved from capital projects into the operating budget, so you won't see that on the list anymore.
SPEAKER_00Um and I think that's it. Without getting too much into the sales tax and CPV discussions, um that's the list we have for next year.
SPEAKER_04Thank you, manager Deech questions for the manager. Assemblymember Waddell.
SPEAKER_07Thank you. Um, I guess I just wonder about the um the levy, the West Creek levee that got removed. As are we concerned that we're gonna have risk of another flood event, which could happen any moment, and where we might lose land due to the failure of the levy. And is that maybe I guess it's more of a question for the assembly about what we think about that being taken out.
SPEAKER_07I I understand we've got a ton here, and and by no means um want to put more on your plate, and but I that one particularly seems like critical. And I guess that's all.
SPEAKER_04And if I understand correctly, you think there's a good chance there's a funding source, a potential funding source that we could pursue. Maybe not in FY26, but potentially coming up.
SPEAKER_00If we did go that route, um I think as you've seen, actually getting funding from those grants can take a little longer than we would like most of the time. Um you know, honestly, I I don't know what to think right now about um emergency uh project funding. Um you know, we've seen a lot of changes. Right now the government's shut down.
SPEAKER_00If we do have grants, there's no one there to manage them necessarily. Um so I don't know. I mean, I I did go for a grant before because it seemed as though there was all there was a lot of disaster funding, and we had been in areas that were declared disaster areas in the past. So we were eligible for the funding. And so I applied at that time and we did not get it. And I don't know what those chances would be now. There, I think there are a lot of funding sources we could try for.
SPEAKER_00I I'm not super confident that. We would get them.
SPEAKER_04Thank you. Assemblymember Potter or Henry, do you have any questions for Manager Deach on the CIP summary and list?
SPEAKER_06Your Honor. This is Assemblymember Pomeroy. I just wanted to give you a heads up that I uh was finally able to log in. Um so I am here and I do not have any questions right this minute.
SPEAKER_04Welcome to the meeting. Thanks for and thanks for putting that on the record.
SPEAKER_05Are you there?
SPEAKER_04Yep. Do you have any questions, Assemblymember Potter, for the manager?
SPEAKER_05Oh, I'm just um I'm looking forward to um finally getting the the the Lost Lake cabin up. So um I'm glad to see that continued discussion. Um as far as the school projects are do any of these, I'm trying to remember where what the state did with um funding for their deferred maintenance program. And do any of those projects um would they qualify for any state assistance?
SPEAKER_00I think that we could definitely apply for grants that maybe could go towards that. Um and and we can we can make that a focus. And actually, um we've got AML who is help, they're helping us find grants. Um, and these are ones that I think would be very you know, we were looking at Main Street in particular as it's a safe route to school. And because the school is sort of involved and in the area, it makes it almost more eligible for funding than maybe other projects.
SPEAKER_00And so I think that school projects are probably high up on the list. But as for the deferred maintenance program, I think maybe Superintendent Coffran could talk more about it if you'd like him to.
SPEAKER_03Yes, please. Okay.
SPEAKER_08Thank you. Uh Josh Coffran, Superintendent, Skagway School District. Um, there was no money uh put in the deferred maintenance, and so I don't think that that is a fund that's available to the school for any of these projects. However, I do believe that the CIP is. Um what we've been told is that completed projects looking for reimbursement have a better chance of succeeding uh than ones that are just in the ideological phase at the moment. And so that's how we've approached it is we get these, we get these bathrooms done, even phase one of the bathrooms.
SPEAKER_08Um and I can go to work at with Deed and uh do the application and see what we can do, at least get on the list.
SPEAKER_04Thank you. Uh Dr. Coffran, while I've got you up here, uh can you talk a little bit about the doors? Because I remember reviewing that, and I thought there were other options that were not millions to um uh uh address the situation with the doors that seem fine but are not uh maybe compliant with ADA. And I thought there were other other options we had for that that weren't millions of dollars to deal with every door in the school.
SPEAKER_08I I think there certainly are. I think uh maybe uh public works director Ames could speak more to that, but I know that ADA was the focus of that. I I I think we're open to just about anything that that works. Um I think we just want to be in compliance is all. So um if if there is an option that is cheaper that allows us to be in compliance, we're all for it.
SPEAKER_01Sure.
SPEAKER_11So what we're uh in the in the design process here, we're gonna have the the design and the bid documents done in a way that the doors will be done, will be bid on as a unit price. Um and those doors that are not compliant will be identified as ones that we absolutely need to do to become compliant. And then if we want to drop doors that are non-compliant off the bid, it'll be um easy to do because they are a unit price. So we won't necessarily have to do every door, but we can see what that cost is and and go from there.
SPEAKER_04Thank you. I just want to make sure that that's something that's not we're not looking at that as a hard number that you've got doors that work well, there's nothing wrong with them other than they're not meeting, you know, a new modern code. And I'm not saying that that that there might be some that you yes, you have to widen the doorway. It it's mandatory, there's no way to get around it, and that's going to be expensive. But if you've got a lot of doors that could have, you know, a different knob on it or something. Um, you know, I'd like to really explore that as an option of how we aren't uh renovating something that works fine.
SPEAKER_11Yeah, we can definitely do some what we call value engineering when the bid comes in and and make a cost reduction at that point. Um I there will every door probably will need will have some cost associated with it because they will probably need to be adjusted or hardware will be need to need to be replaced, but might not necessarily have to replace the entire door. Um the the other thing I wanted to comment on with the school is I just want to remind everybody that it's um it's not just the the school, but it's also the the emergency shelter for for the town.
SPEAKER_04And I I would just say personally, I think that the bathrooms are long overdue and very needed for an upgrade. Um and I don't think the ADA, I don't think ADA existed when the Skagway School was built in 1983. I don't think that had had passed. I don't think those parameters were were there. And um from what I'm you know, my understanding of ADA, it's it's not even close to being compliant to be able to get a wheelchair in and out of the bathroom.
SPEAKER_04So I think that's a that's a major issue that it's time to address it of of the things on this list. That's one I I think we need to um hold that part probably right up the top for me.
SPEAKER_03Something on burn them?
SPEAKER_12Yeah, I don't have anything really to add. I am uh after listening to the manager go through and and uh saying she's dropping certain things off of certain areas in there. Is is there a part in here that has the total that you're that you've already decided to drop or did I not?
SPEAKER_00No, but I was sort of playing around with the spreadsheet uh this afternoon. Um and this gets into the CPV, because I was playing with the CPV percentages as well. Um but if we drop a million, I mean obviously what you're gonna see here is that the sales tax fund deficit would go down to 1.8 million instead of 2.8. And that's um, I haven't done anything with the port projects yet.
SPEAKER_00Um if we, you know, if you did decide to do the levy, we could look at if that could be phased as well. Maybe we can do it over two seasons, or yeah.
SPEAKER_04I I would also comment that I think with with with Main Street knowing we don't have a budget, you know, a funding source, um I I think we're gonna have to face that before we start putting money into it, especially with all the problems we have. And I've heard uh Assembly Henry Henry say we need to we need to put it out to you know put it to the voters, see if it'll be bonded. That's an option. Um, as well as as the option of uh uh for Garden City and the utilities there.
SPEAKER_04But until I think until we have a funding source to be allocating a million here, a million there, going forth for something we know we don't have the money for. I I I I have a hard time knowing where to cut, but uh it's clear we have to. And you know, we're talking a$35 to$40 million Main Street project. I think we've got to figure that out ahead of time before we're you know, if it if the goal is to save, then that's one different goal.
SPEAKER_04But if it's putting it towards engineering for something, we don't have the money to do it. I I think we're we've got the car before the course. And I know that's not a popular opinion with Director Ames, but um, I don't know where the money comes from. You know, we look at these budgets and there's a very large deficit to be able to pull it off. So that's um unfortunately that's my take on on some of the some of these big ticket items. I mean the the incinerator, we've been talking about that for a decade close to it.
SPEAKER_04Um I know we got a little bit sidetracked during COVID, but uh that the incinerator is is something I I think it's put that right at the top of the list with the school bathroom personally.
SPEAKER_00Yeah, and I I was I went through and I was just identifying where are we, you know, where are these big spends happening? And really in sales tax, sales tax is actually better off than the CPV fund right now. Um, and the big ticket items are school upgrades, Main Street, which I'm gonna pull, wastewater treatment grant plant upgrades, and that's just our matching part. And then starting to engineer the school, the rest of the school upgrades.
SPEAKER_00Um so those are really like the main things we're foc we're spending our sales tax on in this list.
SPEAKER_09Assemblymember Hillis. I do not have anything right now. Assemblymember Henry.
SPEAKER_02Uh well at this time, Mr. Mayor, um, I would just reiterate what you mentioned. Um the size, the scope of the project of doing Main Street, in my opinion, absolutely has to be bonded. Uh that's gonna have to be something that we retire uh over a long period of time. Uh in regard to Garden City, I've advocated for bonding that as well, uh, but it's from a different point of view, whereas I'm being told by uh people at the table, people out in the community, that we are in dire need of uh making some lots available so that people can build because we're in a crunch, we're in a crisis, call it whatever you want.
SPEAKER_02So to accelerate that, uh and lacking the funding source on you know the the first page of what you're looking at, uh I would think that it only makes sense to bond it. The cost of money isn't uh it has the market hasn't rallied. As a matter of fact, as you know, the Fed has cut a small cut, but a cut nonetheless. So prime is is probably about as good as we're gonna see, given a half point one way or an uh or another over the uh the near term anyway.
SPEAKER_02But um I'll I'll have a little more uh as we move on with this through uh sales tax and CPV.
SPEAKER_04Thank you Assemblymember Pomeroy, do you have anything now that you've joined uh about the Capital Projects list?
SPEAKER_06Nothing at this time, yeah.
SPEAKER_04Okay. Uh Manager Deach.
SPEAKER_00Um I I will um well I guess you can see it from I want to make it easy for you to consider adding or taking out projects. And so I can give you a nice, you know, a more linear list of what each project, what sort of costs we're looking at for the one year. Um so that when it comes to the table, you can make those decisions.
SPEAKER_04Thank you. Anything further? Any further questions, thoughts? Epiphanies. All right, let's move forward to uh the 2B sales tax fund. Manager Deach.
SPEAKER_00Um, I'm thinking if we want, we can have the school representatives come up, but I just wanted to let me see. Just give you a brief overview. So sales tax, we're estimating we're going to have 17.8 million in reserve. Um, and you know, if if we take out Main Street, we're we could end up with um 1.8 out of reserve.
SPEAKER_00So that would be we would still we would end up with 16.8 million and um less left in reserves, or 16 about. Um, so this is gonna change uh as we make adjustments, and it's actually pretty fun. I should I could send you my spreadsheet, you can play with the numbers and make things, you know, everything's connected across the whole thing. So um right now, I think um, so you'll see we sales tax goes towards bond payments.
SPEAKER_00It also goes towards the general fund mill rate adjustment. So we're buying down property tax, um, keeping property taxes low. And then you'll see that, you know, the large chunk is really going into the capital project. So if we can do, you know, make adjustments there, that would go down. And then to the clinic, 1.8 million. Um, so for the school, um, they're asking for the cap or the max cap is$2,148,000,021.
SPEAKER_00And they're asking for an additional$1,096,696. Um, and I just gave you, uh Heather got me this today, the sort of how that local contribution is calculated. Uh, so that is that sheet that I gave you. And then we have what was submitted by the school. And I don't know how much you would like me to talk on your behalf. I don't want to get anything wrong, but you know, I think basically the those extra funds that they're asking for are it's community programs.
SPEAKER_00So we're looking at, you know, food program. Um they're they're programs that can be that can benefit the community and not just students. So would you like to come up if that's okay?
SPEAKER_04Absolutely. Thank you.
SPEAKER_08Okay. Uh again, Josh Goffin, Superintendent, Skagway School District. Um, thank you for allowing us to be here and for considering a request. Uh I guess maybe I should talk a little bit about our approach to creating this budget. And when I say we, I mean obviously the business office and the school board. And so this request um comes from the school board. I am the emissary that delivers it and gets behind it and um has a lot to do with with creating it. Um and and when we when we did create it, um you should know that it's not an aspirational budget of any kind.
SPEAKER_08We're not looking for anything extra to add to the school. This is purely a maintenance of effort um piece of uh uh budget here. Um so what you see in front of you and what what the the ask is is for us to be able to maintain everything that we've got right now from uh student instruction to community programs. Um I wrote a narrative, I believe it's in your packet, uh, about how we're approaching community service programs.
SPEAKER_08And um yeah, I'm I'm open to questions.
unknownDr.
SPEAKER_04Cochran, can you just describe what the um I I forget the term that manager deeds just used, but uh the the one million what what the uh what those programs are. I mean it's it's lunches, it's uh extracurricular classes, uh other act, you know, recreational activities. Can you just describe those so that the assembly and the community understands what it is beyond the the max contribution?
SPEAKER_08Certainly. I I should have led with that a little bit. Um just just so it's it's on the record. Um essentially two different sources of funding uh that have traditionally come from the municipality. Uh one being the maximum local contribution, that's the number that's set by the state. I believe that is the two million dollar. Um so that's that's the cap number. That's um Skagway has always uh met to the cap. And I think that we are the envy of the state in a lot of ways because of that. Um but we also have the community service programs and the biggest drivers of the community service programs, and it's split into two different categories, one being community recreation, the other being community welfare.
SPEAKER_08Uh the biggest driver inside of community recreation is our student activities, and that's anything from uh kindergarten, first grade, intramural basketball all the way up to high school DDF wrestling, basketball, you name it. Um, we've also run several um camps like uh we we did a uh two or three-week wrestling camp for elementary students that that was uh basically funded through this. Um so uh so that that's that's the extracurricular activities of basically anything that you can think of that involves students um competing or trying to trying to better themselves academically.
SPEAKER_08Um the community welfare, the biggest driver here is our food service program. Um we have partnered with community Catholic Services to provide senior lunches two days a week, and I think that's going really well. We started that last year. Um, and I know that um I've heard really good things uh not only from community Catholic services, but from several seniors themselves. Um and so looking at it this year, there is an increase in the community service programs, and what I'd like to do is to be able to protect some of those things that are uh say non-traditional instructional type things that go on in a school, uh things like music and art and physical education.
SPEAKER_08Um so uh if if I can if I can protect those through a community service program and then be able to focus some of the operational budget that's driven by the uh maximum local contribution, I think that's the the best of both worlds because we are we're we're giving everything that we can from kindergarten all the way up to um AP English classes, AP history classes, we've got AP math classes. So we've got a full array, and it's pretty robust for a school our size to be able to offer all the things that we do. I know families are appreciative.
SPEAKER_08Um I'm I'm a parent myself, and so I I see what that what that does as far as the the funding mechanism allowing us to provide all these opportunities for our students and our families. Um that's what we're trying to do. We're trying we're trying to try to keep that going. Um, we are not seeing a lot of support at the state level. Um, so it's unfortunate the the local municipalities have to pick that up. Um and so that's that's part of the reason why we're here. Um yeah.
SPEAKER_04Thank you. Any questions about the school budget? Assemblymember Waddell.
SPEAKER_07Thank you. Um, would you give a brief overview of the changes that have occurred at the state level that are affecting this year? If you can.
SPEAKER_08I I can. Uh well, it's it's it's a little difficult because our our fiscal years are misaligned, and so I I won't have exact numbers to give you. Um, but what it what I can say is that they they finally did. Increase the base student allocation, which is great news. I believe the amount was$680 was the increase. But if you factor in inflationary costs and everything else involved with running a school district, the actual ask to make us whole from 2016, the last time they raised the BSA, would have been about$1,800.
SPEAKER_08And so that's where we started as a superintendent's association and as a school boards association. It got whittled down and somebody picked 680 out of the air somehow. And that's what made it to the table and made it across the finish line. And we're thankful that that's that's fantastic. But to actually make it so that I wouldn't have to come and ask for the increase that we're asking for, that BSA raise would have had to be$1,800. So an additional$1,200 on top of what they've already approved. And so that's going to be a big push from education proponents over the next several legislative sessions, I would imagine, is to continue to keep up with inflation with the BSA.
SPEAKER_07Thank you.
SPEAKER_04To follow up on that, uh Dr. Coffran, the proposal that where local contributions could be the formula could have been changed where things like burger feeds would have been counted against what the municipality can contribute. That was appealed and overturned, I believe, uh, which I know there was a lot of comments from Skagway, including myself, um uh writing to say that that seems like a pretty punitive maneuver for uh supporting our pri our star asset, our students.
SPEAKER_04Um and I'm I'm I think I'm summarizing that, but I believe that that was appealed, and um they I don't exactly know what happened with that proposed change, but I think it was squashed.
SPEAKER_08So there were proposed regulations that came from the Department of Education that were to be approved by the State Board of Education. That's kind of the hierarchy there. Um, and when it when it came out, um superintendents, business officials, uh municipal leaders from all over the state. Thank you for that, by the way, um spoke out against it. I know that Frank Hauser, the superintendent in Juneau, really led the charge in Southeast. Um and they got tons and tons of testimony. And it came out, gosh, I was saying two and a half, three weeks ago, that they essentially shelved those regulations.
SPEAKER_08So they took no action. So the document still exists, and so it it's it's still out there. Um, but that what they wanted to do was go back to stakeholders and see if they could make make something make sense um with that to try and um to try and fit with all the regulations that go along with taking federal money. And it's it's it's a long um story as far as that's concerned. What I believe is going to happen is that proposed regulation is going to be part of the work of the legislative task force that was formed by the governor. The governor, I believe, formed it.
SPEAKER_08I believe Jesse Keel and Andy Story are both on that task force. And they have a report due to the legislature in January of 27. And so they'll they'll come out with the research that they've done, recommendations that they're going to give to the legislature and the governor at that time, whoever that may be, um, and it'll it'll go from there. So, yeah, it's it's it's dead for now, uh, but we're still kind of keeping an eye on anything that comes out of the Department of Education regulation-wise when it comes to local contribution.
SPEAKER_04Thank you. Any questions for Dr. Coffran from the assembly members on the phone?
SPEAKER_05Uh, this is dead. Um, nothing at this time.
SPEAKER_02Nothing at this time, you're honored.
SPEAKER_06Nothing at this time, you're honored.
SPEAKER_02Thank you. Thank you.
SPEAKER_04Okay. CPV exercise tax.
SPEAKER_12This is a fun one.
SPEAKER_00Um so the budget that the draft that you saw at the last two meetings, I think at the last two, uh, we had we had originally applied the new CPB percentages that were in the new study that the assembly um postponed for or to get more information. So assuming that that isn't necessarily accepted before the budget comes out, we went back to the old the old allocation.
SPEAKER_00And in looking at it, I I had always uh, I don't know why, but I had always thought that there were sp like you see in the new uh the new study we did, that each department had a percentage assigned to it. But that's not necessarily the case. The max we can give to any, to any of them, most of them, is 68%. So when you see that we've we've historically given emergency services 68%, so fire, police, communications.
SPEAKER_00Um we've historically given, you know, any water sewer type um projects 68%, or we we felt that we could put 68% towards those. Um, I was looking at what the allocation was for the last fiscal year, and um, you know, we have the 68% up here for like the fire department, um, police, and communications. But then if when you got down to solid waste and water and sewer departments, they were 48.6 and 41.1.
SPEAKER_00And I was like, where is this coming from? And so I talked to Heather. Um basically those percentages last year were adjusted in order to balance the budget. So whatever was needed to balance the budget up to 68% was applied. And they were applied in this, you know, administration got 50%, library got 25%, you know, and that's that's where those allocations came from. So it's it changed how I put everything back, you know, I I went back in and I changed those allocations in all the departments.
SPEAKER_00And I was finding, for example, that um I think it was water, it was either water sewer or solid waste. One of them I was able to balance their budget with 66%. Uh, the other, they were still at a deficit at 68%. So I think that we have a we have a lot of leeway as for how we are we're applying our CPV funds. As you know, there's it's a finite amount of money.
SPEAKER_00Um we currently have about five, or we estimate we're going to have 5.7 million in reserves at the start of FY26. The way we've got the CPV, um I basically all the water sewer projects I applied at 68% for the CIP list, which means that the bulk of what we're paying on some of these is from CPV and they're big projects, and so it's a lot of money.
SPEAKER_00So um you'll see on the on the draft CPV budget here that we start with 5.7 in reserves, and then after everything, after you know, 3.2 goes to capital projects, 1.2 goes to garbage, after all of those allocations, we're basically spending twice what we expect to bring in next year. So I want to change that. I've been um it's possible, and I didn't have a lot of time to do it, but it's possible that we might be better off if we don't apply any CPV money to capital projects and do everything with sales tax money.
SPEAKER_00We have more in reserves and sales tax. Um and I don't know if my calculations are right, but I was coming out with like um, we would end up, well, where is it? You know, if we did 32% CPV, 68% sales tax, we would end up in at a$3.5 million deficit in CPV instead of 5.2. And then I was looking at 0% CPV, and it was even better.
SPEAKER_00And I feel like I did something wrong, possibly. So sorry. So I really want to double check that. But um so it's it's possible that it would be in our favor not to apply CPV to projects, but I will I'll give you something that I think is maybe the best scenario. Um, but then I also at the beginning of the year, I the treasurer told me um that we have, and I double checked this with her as well.
SPEAKER_00And she said, conceptually, I'm right. The numbers I I'm not gonna have accurate, but we have about 5.7 in reserve. We expect to get about 6.7 um revenue, you know, in in new revenue this next year. And we've been accruing interest on our principal on our reserves, and we may have an additional$6 million in accrued interest. And I was, I said, well, can we spend it?
SPEAKER_00And she, well, yeah, we can. So I need to double check it. I don't think necessarily because we have more, we should spend more, you know. Um, but then it's also about what your, you know, how you feel we should be spending CPV. I know that some would say we need to spend it all. You know, we're getting this money from passengers to specifically to spend on things that benefit passengers. And so if we're not, why would they give us more?
SPEAKER_00You know, but then on the other hand, what if there's a big project and we need to spend the CPV money and we need more than just, you know, a million dollars? And so I think we can go either way. I my inclination is to not drain our reserves down to$414,000 in CPV. So I I'm going to play around with it. I feel like we can do this better. Um, and I guess that's all I've got.
SPEAKER_00I don't know if you have any thoughts or um recommendations.
SPEAKER_04I I guess I would I would ask uh Manager Deach when you expect the first reading of the budget to be.
SPEAKER_00I believe we've got that scheduled for November 5th.
SPEAKER_04So coming up.
SPEAKER_00Yeah.
SPEAKER_04Do you want our input um for nuance or big ticket things before you present that you're the first budget?
SPEAKER_00Yeah, I think I I would. I would. I think um, you know, I want I want to balance what you would like to see with what I feel that we need to do. Um, and so I would like to know what your perspective is. Because in the end, it's going to be in your hands. So I'd like to get it close to where you'd like to see it.
SPEAKER_04Questions or comments from the assembly. Assemblymember Widow.
SPEAKER_07Well, since since you asked, um I going back to the levy thing, I just I keep circling back to this in my mind because Daiy has experienced a really extreme amount of erosion in some of its areas, specifically the Tyre River around like the National Park Historic Site, because the river changed a little bit. Now the West Creek, it's different. It's not a river, it's a creek. But you know, if it was somewhere else, they'd probably call it a river. It's quite large. But um, but because it feeds a larger body, it's a creek. But either way, um that right now has um it goes alongside an access road where one of our school teachers lives, where other community members live.
SPEAKER_07Um, it goes along an access road for an area that we're working on a long-term subdivision plan for. And should the creek, you know, have a flood event or have some sort of further erosion, it could really have a severe impact on the community members out there and um the future plans for you know expansion of residential area out there. And so while I see that, you know, we have a lot of projects and have a lot of money, that one just feels pretty important to me.
SPEAKER_07And I would actually like to see it included back in. Um and maybe at the expense of something else, I don't know what yet, right? I mean, because they are they all feel very important, but but that one specifically, it's like, I feel like it's it's just a really high risk because water can change things very quickly. And I know that we've taken some of the preliminary actions. We've cut down the alders on on the existing levy and we're doing things to kind of preserve what we have, but the part that doesn't have a levy on it at all is at a pretty big risk.
SPEAKER_07And I think it could end up being like a catastrophic problem if it isn't handled sooner. So so I guess I'd like to see inclusion of that again, even though it's challenging. And and it's one of these things where um I mean, a net the idea of a net zero budget that gets passed around a lot. And it's and it's an important and interesting concept. But what we forget is that we are already taking 50% of sales tax or a fiscal year, um, whatever it takes to run a general fund, 50% of that's already set aside.
SPEAKER_07We already have the 50% for last year. We currently have a reserve of about where's the sales tax one? 17,870,506. And if we still set aside money, but we don't do that whole thing, we're still at compliance what we have per code, that we will still be meeting that rainy day fund. And then we're not at risk of eroding away our levy or our land that doesn't have the levy next to it.
SPEAKER_07Um so when we say that we're operating at a deficit, I think that that's a little misleading in some ways. However, I get that we shouldn't just inevitably spend and spend and spend more than we're bringing in each time, but we do actually have certain reserves. We set aside reserves each year to the tune of, I don't know, five and a half to seven million dollars, which we still have. And, you know, important projects, I think it's we should see progress on them.
SPEAKER_07So so the levy is one for me that I think is pretty important.
SPEAKER_10Thank you. Assembly member Hillis. Uh, could I just ask the manager for clarification on that statement about interest? Did you say we might have an extra extra six million dollars in interest? Where did that come from?
SPEAKER_00Yes, it has been accruing. Um, I need to understand uh Heather's been out of the office, so I I do plan to sit down and fully understand this. I, you know, I am not an accountant, so it can go over my head at some point. But um I believe that, you know, we have an account that has our we have a CPV reserve account, and it we've been gaining interest on it.
SPEAKER_00And I don't know, it seems that the interest has not been going back in, but maybe has been. Did we invest it? Yeah. So I I want to understand it better, but I I'm like Heather, you got, you know, I know you're out of the office, you're not by your computer, but I am not going to say this to the assembly if it's not conceptually true. And she assured me that that's correct.
SPEAKER_00We have reserves, we have revenue coming in, and then we have this accrued interest that we haven't been touching.
SPEAKER_10So on a six, a little under six million dollar reserve, we've earned six million dollars extra in interest.
SPEAKER_00It wasn't always that.
SPEAKER_10It used to be a lot more. Okay. So this is from like several.
SPEAKER_00I I think it must be. And maybe it's something that I can um very curious. You know, maybe Heather can help me get this information in like a summary or um some sort of informational document for you guys.
SPEAKER_04Assemblymember Wodell.
SPEAKER_07Thank you. I actually um I'm curious about how the table feels about spending CPV money and spending sales tax money and the kind of general conversation that focuses around that. I mean, I I feel like there's a there's input that could be given as to whether or not we val or want to prioritize saving or spending in one fund versus the other one. I I think the the point I heard about um spending CPV money for the benefit of cruise ship passengers is is an interesting one.
SPEAKER_07And that if we still have these different pools of money, I I don't know if there's a specific project that we are saving up for within the CPV fund. But if there isn't, there there might be good argument to spending all of that money and reserving our sales tax money. But but I guess I'm curious how the table feels about this generally.
SPEAKER_04So two budget cycles ago, we put most of this our CPV money into the transfer station, if I remember correctly. Is that am I accurate with that, manager Deech?
SPEAKER_00Probably up to 68% of the cost that year, yes.
SPEAKER_04Um and therefore the amount of money we could put into the departments was less because we put a I mean it was I don't remember exactly what I want to say, it was about six million dollars we put into a nine million dollar project out of CPV. And then some of those uh departments, instead of being closer to 68%, were much lower because we just didn't have the pool of money to spread it throughout the departments. If there is a financial benefit to doing it different, as manager Deach was looking into, um by all means, let's make our money go as far as we can, would be my take on it.
SPEAKER_04If it if there is a better financial strategy, by all means, let's take let's take it. But um, I would say we we do have uh just within this budget, you know, the incinerator spread over two budget cycles. Um, and that was done deliberately because we knew it would be hard at hard to fit into one budget cycle. So kind of with the planning of and also most likely it the construction would take two budget cycles. So manager Deach and Director Ames have guided the the RFP process so that it would be spread out and not be such a hard um hit on this budget.
SPEAKER_04Uh just you know, and every time we have one of these big capital projects, it's uh it's it's a real challenge to find how to fund it, you know, in one budget cycle. That's not how most businesses or households operate. You know, you want to renovate your home, you say, for a long time. You know, most people do, um, for example. So I I I would say that, you know, in just in this very budget cycle, we we have this spread out over two years. So saving is it's not an if, it's a certainty.
SPEAKER_04We're gonna need it, um, you know, for for that one specific um project. Um flip side is a school, we can't put a CPV into it. So, you know, with those capital projects, that has to come out of sales tax or you know, or property tax. But um that'd be my take on it. I'm curious if anyone on the phone has uh, you know, a maybe 20 years, 25 years of experience of dealing, juggling with these things.
SPEAKER_02Um yeah, Mr. Mayor, I would say, well, just a brief recap on things. Um, the community is not stagnating. Uh we are uh ever increasing every season, so obviously this puts demands on everything that we see in front of us now on this budget cycle. And to go along with that, we have heavy additional personnel in almost every department that includes additional insurance, we have Step increases, COLA.
SPEAKER_02We have large equipment in this budget that, to the best of my knowledge, is very much needed. So to the point that Assemblymember Weddell was dipping her toe in the water, um, I am not opposed to spending down the CPV uh at all. Um the six million dollars that the manager is alluding to through the treasurer, if that's um in fact an accurate number, uh, which is a build-up carryover from investment, um, that's great.
SPEAKER_02Um but I would also ask the city manager, um, I think the buy down this year is is roughly about three and a half million, is that correct? To the mill rate. Um 3.5, 3.6, give or take.
SPEAKER_00You may be right. I don't have that in front of me, but I can get you that tomorrow.
SPEAKER_02Yeah, I believe that's that's probably close. Um, have you looked at the mill rate in zones one, two, and three without the buy down? What would the mill rates be? I know that's gonna put a hush on the room.
SPEAKER_00We can find out if you'd like.
SPEAKER_02I'd be curious. Um so to that end, um we obviously have these um bigger projects such as Main Street that we've discussed, um, and then we have some need projects um that are not so big, um, like the Levee, West Creek. Um, but then we have Garden City that's a little bit bigger than something out in West Creek, but it is also a need project.
SPEAKER_02So I I think we have to explore extensively our our revenue choices of how we are going to um get the get the revenue stream to pay for these projects because we obviously are going to have to. Um none of these that I've seen yet um would I regard really as a want sort of project. Um, all the personnel uh certainly has been represented to us at the table as things that are absolutely needed, additional personnel that's gonna jack up insurance and uh everything that goes along with it for each one of those departments.
SPEAKER_02The large equipment, I know everybody likes to say, you know, let's use some duct tape and um, you know, do what we can to try and get that piece of equipment through or not get an additional garbage truck, whatever it may be. But again, our market is not stagnating, we are growing at a rapid pace, so we have to be mindful of that. That it is going to take those reserves in most cases to subsidize these costs.
SPEAKER_02These are our costs for staying as a thriving port. These aren't things that we're gonna you build that they will come, they're already coming. So we have to continue to maintain it and continue to build around it and continue to replace things and add personnel and all those sorts of things. So um, I I'd be um very attentive to what uh the treasurer says about additional carryover and reserve, and I am not opposed to spending down the CPV at all.
SPEAKER_02That is what it's supposed to be spent on, is uh related to passengers and related port um things. So uh yeah, I'm gonna have to uh beat this thing up um on a pad and paper and probably half a dozen pencils and try and make my best sense out of it. But that's where I'm at.
SPEAKER_04Thank you, Assemblymember Henry. And I found uh in the it's 2B, the sales tax draft for FY26, uh line 5980, transfer to general mill rate adjustment, 3,350,826.60. It was just a guess.
SPEAKER_00Thank you. I knew it was somewhere.
SPEAKER_04Assemblymembers Potter or Pomeroy, do you have uh any thoughts on uh the overall structure of uh of the budget, uh sending down CPV as opposed to sales tax or any particular capital projects that um you want to highlight?
SPEAKER_05This is Deb. I'm prepared to talk. Sorry.
SPEAKER_04Go ahead, Deb.
SPEAKER_05Uh thank you, Your Honor. I completely agree with everything that Assemblymember Henry just said. Um the CPV money is is um woefully inadequate to cover cruise ship passenger costs, but that's what it's there for. So um I do not have an issue with um spending that fund down on cruise-related um services. Um I also leaned in agreement with Assemblymember Waddell um in regards to the West Creek levy that feels like a health life safety um issue to me that that we need to address.
SPEAKER_05Um I I think just in general, you know, we've got um that this continuing increase in in passengers comes with an inherent requirement to increase municipal staff and the services that need to be provided. And, you know, as as we heard from Director Wall, um clinic costs are going up. Um you know, just insurance costs for salaried employees are going up and they're gonna continue to go up.
SPEAKER_05So our expenses are gonna go up. I'm already thinking ahead to next year, at least in terms of the clinic costs, um, at a at a an expected 30% increase every year. So it's it's these budget sessions are never easy, um, and it's just gonna get more difficult. It just we don't have um what skyrocketing costs, um, we just are do not have enough income. Um so I would support everything that Assemblymember Um Henry was saying.
SPEAKER_05Um, and and I think Mayor Hansen, you were talking about in regards thinking about the Main Street project. Um I would agree with you that kind of given this really tight budget, if it's looking like we're not gonna be able to fund this project for a few years, um I would kind of want to take a um taking a second thought at um putting too much money into it now, especially if it seems like the only way we're gonna get that project done is through bond or um a major grant.
SPEAKER_05Um, so that is my thought. And then I have one question for the manager. It's not in the forefront of my brain, but can you remind me of what that number, that dollar amount is per code that we need to keep in the sales tax reserve fund?
SPEAKER_00Uh we need to keep 50% of the general fund. Um, basically 50% of what it would cost to run the municipality for a year.
SPEAKER_05Okay, got it. Thank you.
SPEAKER_00So I based on this budget, it would be currently like at 6.5 million.
SPEAKER_05Thank you.
SPEAKER_04Thank you, Assemblymember Potter. Assemblymember Pomeroy, do you have anything you'd like to highlight or share?
SPEAKER_06I was actually going to say a lot of the same thing. Um I just want to truly point out with the the levy situation in West Street. I I think it is uh it feels to me like something that could potentially fail a lot faster than uh anything along Main Street. So it seems in my mind a slightly higher priority of something that should um be on the budget.
SPEAKER_06Um I I I'm I'm not sure uh how it compares. Maybe I should go out there how it compares to uh say the Taya erosion. Um, but I was out there last week, and I I think if anybody has a chance to head out and just see the erosion, even just in that area, it is staggering. It looks like one weather event away from some pretty uh catastrophic flooding on that side.
SPEAKER_06So uh if we are also experiencing a weather event um that would sweep through the the West Street side, I think that's just that would be devastating. So I I think that's something that we really need to um I think keep at the top of our priority. But also, yeah, I I agree with um Assemblymember Henry in everything he was saying. It just makes sense.
SPEAKER_10Thank you, Assemblymember Hillis. Thank you, Your Honor. Uh Assemblymember Henry touched on something that um made my brain start firing again. And uh that was this that buy down number. And I would like to know um what that percentage is um that's made up. Um I was even thinking it would be nice if the public knew um how much that buy down is. I heard many times this year about property taxes increasing.
SPEAKER_10Um, and that's because of valuation changing, not because of mill rate changing. And I don't think it's advertised enough how much money is spent out of sales tax to buy down those services to make it more affordable to live here. Um, and so that's something I I would like to see. Um I when it comes to CPV, jumping back to that, I have no problem um spending it on projects, uh CIP projects, CIP projects, that's double.
SPEAKER_10Um, anyways, um I would be aware of the upcoming upcoming years, like 2027, we're gonna be spending roughly the same amount on projects again forecasted. Um, so if we blow it all down now, and then next year we'll be pulling some away from departments probably to make this happen. Um so just uh concern something to look at, but I have no problem spending it down on projects.
SPEAKER_04Thank you, assembly member Hollis, Assemblymember Burnham.
SPEAKER_12Thank you, Your Honor. Um as far as the CPV and the regular sales tax stuff, it's as I always used to quote you as saying, can we use CPV for that? Um nowadays it's we're getting a lot of CPV money. We're talking millions of dollars, but it's just where we use it, because it's basically if you look at just the two bonds of CPV and sales tax, they're both in the same kitchen.
SPEAKER_12It's just one you can use for a specific amount of things, and one we have a lot of leeway on using it. So if if we don't spend down the CPV and use the sales tax, it's still going to end up with the same amount of money left over. It'll just be in different places. Um I I'm I'm not opposed to spending the CPV down. I'm I'm not opposed to to holding on to some of it for future projects. Um I I think that it would be uh probably prudent to listen to, I don't know, people with 20 years financial experience that happen to be on the phone, and also, or maybe more importantly so, because they've had their hand in the municipality for years and doing and getting paid for it, would be a treasurer and a manager.
SPEAKER_12So I would I would lean a lot towards what they would recommend. Um and as far as a levy, working spending money on a levy or spending money on anything, even a design or whatever else, if we spend it this year, it's more money than next year. Because it's it's let me not let me rephrase that. It's uh money well spent kind of thing, because it's gonna cost you more next year to pay for it.
SPEAKER_12So this year, even if we bust even or go in the hole a little bit, we pay for it this year, next year it's gonna be more expensive by another 20%. Um and of course, I did not see on the CPV list a rec center expansion with a pool. I I guess I just haven't looked hard enough or didn't have enough time with it. But other than that, that's about all I gotta say about it.
SPEAKER_07Thanks. I have something else I want to add back in. Um well, the welcome garden was coming out of the port fund, right? And that's our favorite fund, the one that can afford welcome gardens for our beautiful visitors and community members to enjoy. And what's the latest on that? I can't actually find any um multi-year projections for that. And I just tried to quickly pull up the concept. But does anyone like the manager have a rough idea on what that would be for 26 if we wanted to pursue it and if we did, if there was room within the port budget to pursue it?
SPEAKER_07Because I would love to see that project continue. Since you know, hate to get design plans and then not move forward with things, right?
SPEAKER_00Like, if I may, do it, I think the we don't know how much it's going to be because we don't know if the assembly would like to have a fountain or not. When we get, yeah, Tyson, you want to come up? Um there are some parts of the design that will be more expensive than other parts. And when we get to 35%, we'll have those cost estimates on the different options.
unknownYeah.
SPEAKER_11Yeah, that's right. Yeah. We'll have a 35% set pretty soon. Um, one showing a fountain, one not showing the fountain. Um, and then we'll have a cost estimate with both of those. And I guess that'll get sent to a committee for review.
SPEAKER_00Yeah, probably it's been at public works, I think. And do we, I mean, have we hazarded a guess of what like if there was a fountain, if it was the whole shebang, what would it cost?
SPEAKER_11No, we we haven't, but we should have that um pretty soon here. And once we have that, if we get that to committee and a decision is made, we can see where we're at in the in the year for the FY25 budget, and we could, um, if there's enough time, we could make an amendment to the contract to continue the design. Because we have we we we didn't use the full amount budgeted in FY25 to get to 35%.
SPEAKER_00Right. So we're we are gonna have to get to 100% on those drawings. So that's probably where the next um pocket of money would be spent. How long would it take to get to 100% drawings?
SPEAKER_11I don't know that answer right now.
SPEAKER_04We had it at Public Works about two weeks ago. Is that right? Three weeks ago, two weeks ago, somewhere there recently. Parks and rec. It was parks in rec. It was right before our last assembly meeting, I think. So yeah. Uh Assemblymember Hillis.
SPEAKER_10Thank you. Uh I was disappointed a little bit to see the public works consolidation got pushed off to 27. Um I know it's a chunk of money, but it is another um needed finish of a project that we kind of halfway started. Um I'm not proposing it gets moved forward unless we can cut a whole bunch of other things. But just wanted to state my disappointment that it got moved off a year.
SPEAKER_04I would like to see some helicopter fees back in this budget too, since we've probably three, four years in a row, we've been talking about flying this cabin up to Lost Lake. Um and I think uh the new public work or parks and rec chair will push this uh to a conclusion.
SPEAKER_10Go ahead. Yeah, we plan to do it. We'll find funding. It's gonna be in the budget somewhere or another.
SPEAKER_00Well, and I think once um we really need there there've been so many, the discussion on that has been sort of over here and then over here. And I would love to get specific direction about location from the assembly on that. Um, and that would, you know, we'd be able to then move something forward.
SPEAKER_04I think it will be highlighted here soon. So okay. Anything else anyone would like to contribute? Mr. Mayor.
SPEAKER_02Yes, Assemblymember Henry. Um just for uh just for information sake, we drew$12 million. Um, and that's what our forecast is for sales tax. So at 5%, obviously, that means uh sales of$240 million. At 5%, that's$12 million. If you take um an additional 2%, which is 40% of 5%, and sales tax additionally, and you do the math on that$240 million, that's$4.8 million additional sales tax revenue.
SPEAKER_02So for anybody scoring at home, uh, whatever we are out around as far as being a balanced budget, we could still have the mill rate bought down to keep those property taxes low, as we show on paper in this particular presentation of the budget, but we would also have an additional$4.8 million dollars based on the projection numbers to cover the amount of money that we are out around so that we can operate and deal with the amount of passengers and the quality of experience that we try and offer.
SPEAKER_04Just saying. So we could be in a worse shape.
SPEAKER_02We could have had something on the ballot, maybe, that read in uh let's see, add seven mills to the um mill rate or add two percent sales tax. But I'm just spitballing it.
SPEAKER_04Okay. I know we have another meeting coming up, um, and the clerk's got to get that ready. So if we don't have anything else to discuss, I would entertain a motion to it. Oh, Director Ames has uh his hand up right at the last second.
SPEAKER_11I I did just want to mention that um aside from the for the CIP budget, aside from the port projects, everything in there is pretty much um to maintain existing infrastructure, either to upgrade uh or replace aging failing infrastructure. Um, and those those items aren't going to get any better as time goes on. And I, you know, with the amount of um upgrades, upgrade projects that are on there, um, that doesn't even that doesn't even take care of everything we have to do.
SPEAKER_11And I think it's something to keep in mind when we talk about building new facilities or new infrastructure. You know, everything that we build has to eventually be upgraded and replaced. And and we're coming up um on a lot of things that were constructed and built kind of in the same era. You know, we're gonna have these recurring major maintenance, major building system upgrades, um, road replacement upgrades coming up for a while, I think.
SPEAKER_11So I just think it's important to keep that in mind as we move forward thinking about new facilities, because eventually those, you know, you have your construction costs, but they also have to be operated and maintained. Um, and as time goes on, they have those those large costs for major maintenance.
SPEAKER_04Thank you. Chair would entertain a motion to adjourn.
SPEAKER_10Make a motion we adjourn. Second.
SPEAKER_04Motion by Hillis, second by Waddell to adjourn. May we have a roll call, please.
Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...
Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...
Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...
Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment...
Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet