SPEAKER_00Item two, moving on to the agenda review of proposed FOL.
SPEAKER_02Airbass. Present. Clothing. Potter.
SPEAKER_07Here.
SPEAKER_02What else?
SPEAKER_07Present.
SPEAKER_02Hansen. Present. Hillis. Present. Five members present. Quorum is established. Assemblymember Henry is absent.
SPEAKER_00All right. Moving on to the agenda. Item two, review of proposed FY25 municipal budget. At this time, I'm going to turn it over to Manager Ryan, unless anyone, any assembly members, uh would like to make a statement or lead us off on this item. Okay. Manager Ryan, the floor is yours. Thank you.
SPEAKER_01So we're I just want to make sure everybody understands we're talking, you know, the general operating budget and enterprise funds today. We did, this is unusual. One, we canceled the first meeting because I wasn't prepared yet. Um we usually do three of these assemblies as a whole, and we just weren't ready. Um, but two, we've we've done this every year since I've been here, and it's to get you all engaged and me to gauge your interest in where the budget needs to go before you see the manager's budget.
SPEAKER_01Um, but the feedback I've received is it's hard to have a feeling about the budget or understand the budget if you can't see the whole thing. So you have an estimated CIP budget. Don't get too rapped about it, but it is what we're using to help us estimate it. It's it's close, but there's little nuances that are going to change in that. But we're not here to discuss CIP other than it's I almost just gave you a dollar mark this year. Um, but I didn't think that would work very well. And then you also have your sales tax and CPV. Those aren't finalized either, um, but they're they're they're at least close enough for estimating purposes.
SPEAKER_01So it gives you, I hope, a better basis of understanding the general fund and the enterprise funds. Um there's well, um my department heads are here, at least hopefully the majority of them that are impacted by these funds. And so if there's specifics I can't answer, um the mayor can um direct me to bring one of them up to help answer the questions or if you like, if you all like.
SPEAKER_00Man, Ryan, thank you for that. And just for my I just want to clarify the budget's still yours. You still have the budget. We're gonna look at it, we're gonna review it tonight, but you're gonna go back, you can keep your budget until probably about three weeks from now, and you'll deliver it to us for our um we can start, it becomes the assembly's budget. Right now, we're just reviewing your draft budget. Is that am I correct in that?
SPEAKER_01Correct. Today you're looking at the the general operating funds and the enterprise funds. And you know, my hope with all these is if you if you had if you want to have a discussion up there and I can gauge, like let's say you all wanted, I don't know, a butterfly garden in town. Um, and I would understand that I needed the staff for that. And I might consider that if I thought I could get it done, and I may not, but at least it's I'm trying to gauge where you want to be and what you want to see in the manager's budget come you know, November when you get it.
SPEAKER_01Um, with that said, you know, we all know it's it's not a meeting where you're giving direction or anything like that. You're just I'm trying to get you up to speed what I'm thinking and hear what you might be thinking, and then I'll try to hopefully mold that together in a budget that gets you on the right path for what you want to see from this budget um in 2025. So it's just kind of trying to bring where where I'm at and my thoughts together with whatever you might be talking about up here, and if I can, I will bring them together to give you the final manager's budget.
SPEAKER_01If I can't, I'll just straight up tell you, no, that didn't work. I couldn't balance the budget. Um then you can say, well, that's too bad. This is what we want, but it's your budget.
SPEAKER_00Manager Ryan, what would be as we work our way through this, what's the most expedient way for us to give you that feedback as we're up here? You know, we see an item and say, well, maybe we do want that. Yeah, what you mentioned.
SPEAKER_01I I think I I think the the the best way is to to listen to what I have to say, ask me questions if it's not clear, just make a statement of what you want to see. It it I won't take it as direction. I'll just say, oh, Deb wants a butterfly garden. Fine. Too bad. I won't fund it, you know. Or I'll say, you know, maybe she wants uh, I don't know, better infrastructure. Okay. You know, so so it's it's not really that I I'm not here to like I'm just hoping for open communication mostly so you understand the budget and I hear what you might be looking for.
SPEAKER_01And if I can make it happen, I'll try. If I can't, I'll just won't.
SPEAKER_00So um anyone, any of the assembly members, if has Brad as the manager's moving through this process, if you have any questions or you have any input, please just raise your hand, I'll call on you, and uh we'll keep moving forward. Manager Ryan, it's yours.
SPEAKER_01Yeah. So I I want to hit on the memo that I wrote to you all. Um, and this is the first time I've come in with this direction to a budget. And and uh I will say, you know, I had uh Deputy Deach involved a lot, um, Alana Lassen and Heather uh from Bali helping us get this all wrapped up uh into this. Uh some of us work in better places. It's amazing. Um, but but the but the the reality of the discussion was I really want to see the Misfali Skegway have a budget that says this is the revenue we're bringing in, this is the revenue we're expending, and not be in a deficit spending habit.
SPEAKER_01Last year we had a deficit budget. It was okay. We had fund balances, that's fine. But as you're moving forward, that that fund balance is getting smaller and smaller. And so you're not going to be able to have a deficit budget every year. I don't, I'm not talking down to you. I think we all understand that. But my goal was to get you a budget that was what I called a net zero budget. I don't know if that's a real term or not, but essentially the revenue you bring in is the revenue you spend, and you're not spending into a deficit, a deficit. I didn't get there yet.
SPEAKER_01Um, and with that in mind, I'm still hoping to get you that. I may or may not get you a complete break-even budget. Um, but the idea is not to say that you can't go into your deficit budget, but it is to say when you decide that you want something else, um, a senior coordinator, an extra garbage man, or a lady, you know that you are going into deficit to get that. Um, you know, or I don't know, a new facade on the A-B hall, anything like that.
SPEAKER_01You understand that your deficit spending, and that's what I'm trying to get you, is to there. Or you need to shuffle things if you don't want it to be a deficit, but you have to give up something to get something. My priority is on operations and maintaining operations. And the reason for that is I believe that the municipality, since I've been here, is asked to do more and more services throughout the community, provide more and more service. Um, you know, the visit, and you'll see here, like the visitors' department, they they wanted a person.
SPEAKER_01So my department heads come to me and they say, I'm being asked to provide these services. This is what I need to continue that. And it's because we have more tourists, we're taking over more of the services in town. Um, there's there's a high expectation in town that we're going to lay out the red carpet for our visitors and our community. And I think if you go visit other communities of this size, even three times as big as in Southeast Alaska, you're going to be hard pressed to see a community that provides this kind of service to their community and their visitors.
SPEAKER_01I can't find one. And I think I've been to most of them. Um, they're they're just not there. We also are of this size. No, no community this size is hosting this many cruise ship patchers coming to town. I think we do a phenomenal job of it, but we really lay it out. Our trails are amazing, our parks are amazing, our roads, like we have great facilities and very affordable for Southeast Alaska. Um, but to highlight some of the things that are that are happening to show you the services we're providing, visitor center is a good example.
SPEAKER_01Um, you know, we've we've taken over the Fourth of July parade, we're we're taking over more and more events, they're managing the contract for Garden City now, Smart, all of these services that are continually needing more and more um um functionality from the municipality that used to be held in other places. Uh Clean Sweep is another one we now host. Your Seven Pastures venue is very popular. That takes more and more staff to manage, and we're trying to figure out how to manage that more effectively.
SPEAKER_01And so that's just more and more of an impact. Rec Center, you know, we've got senior services, a senior program coordinator over there, and we're trying to always upgrade and continue that service. So uh fire department, you know, there's a demand on that to be search and rescue, uh respond to the ships. I mean, they're just continued on that. Police is the same way, more and more response, public works, um, our facilities, more and more requests for facilities, uh, garbage.
SPEAKER_01There's more and more push on garbage to be picked up, modify canisters, modify dumpsters. So there's just more push on all of it. Administration, you know, we're processing more money, more bills. Um, and then of course, the clinic is there. They're always trying to bring on more um providers to meet the need. And and it and it continues. So it's not to say that we're not a very wealthy community, it's that we're we're trying to provide a lot of services that a lot of other communities don't and just say no, or they're they're down at a lower level.
SPEAKER_01So that's the push. In the same breath, I also denied all of those requests for extra positions this year and told the department heads, we're gonna try to provide the same service we did last year with the same staff. The only um the only department that got an extra position in it is the port. And the reason the port is, you know, it's it's a massive effort down there, and we need to build our capacity. I like to say the port's worth$300 million to business in town.
SPEAKER_01I can't quite substantiate that, but it's worth more than that if you take the cruise ship sales and and all of that. So just sales in town, if you just back calculate$12 million on 5% sales tax, that's two$240 million. Uh so it's a very uh important lucrative port. And so there is a position in there, but they're also the only fund in enterprises that are in the black. And they actually uh, and that's not counting CPV. And also they give us payment in lieu of taxes in the form of lease payments to a general operating fund of around$800,000.
SPEAKER_01With all that in mind, uh, the sales tax fund and the CPV fund, I just told you we weren't really gonna talk about them, but I'm going to for a minute, if you don't mind. And that is because to get to a net zero budget, I didn't look at it and go, well, I don't want a deficit spend in both of them. I just want them to even out. So uh sales tax fund, one, we believe you know, it's gonna um we underestimated how much we were gonna get in 2024. So our balance is a little bit more than we'd predicted.
SPEAKER_01It's about$10 million, we think, going into 25. That's our estimate. And the as the budget stands right now with no changes and it will change a bit, we're gonna see an increase in the sales tax fund balance at the end of 25 of about$990,000, which means the projected reserve balance is$11 million,$11.2 million,$1.3. Uh CPV, on the other hand, um we're going to see um uh a net revenue of negative$2.2 million is as the budget stands.
SPEAKER_01And so that's a a fund balance at the end of 25 of about$2.6 million. If you look at those two together, that offset was about$1.3 million deficit. Now I do need to clarify, we missed something from the school's request, about$187,000. We didn't intend to do that, so it's really going to be a$1.5 million deficit as it stands. And that's for uh, I call it the community food program um that we missed. We just it was just an oversight, it wasn't intentional. Um, but we'll we'll slide that into the sales tax budget, which is what we'll talk about on the 22nd.
SPEAKER_00Manager Ryan, real quick, just a few questions. One, the uh current budget, the way it stands, it accounts for the 50% uh reserve savings that's mandated by code that's already in there and tucked away, correct?
SPEAKER_01Well, the so the the resolution that the UL passed was 50% of the operating budget is in reserve. And so, and that's that$11 million that you have in sales tax. It's that's not 50%. 50% would be closer to about seven or about seven million dollars. So you're you're exceeding it by about four million dollars. That that eleven million dollar reserve balance is where that 50% is at.
SPEAKER_00The 11 million reserve and sales tax or in sales taxes.
SPEAKER_01Sales tax.
unknownAll right, yeah.
SPEAKER_00And we saw so last so this year we're gonna we assume we're gonna see a million dollars more in sales tax than we expected, but we're gonna have 2.2 million less in the CPV this coming budget, assumingly. And that's where we see that 1.3, the difference between the two.
SPEAKER_01Yeah, or 1.5 when I adjust for the school um where we missed the school 187,000.
SPEAKER_00How much is 50% of our operating budget? About about seven million. About seven million.
SPEAKER_01Okay.
unknownYeah.
SPEAKER_01And then it obviously changes with how when the budget changes.
SPEAKER_00So the 11 million will be realized at the will, we expect to have that much in reserve in the reserves at the end of 2024. No, at the end of 2025. Yes. Okay. If we don't spend the butt we'll have 11 million in the bank.
SPEAKER_01That's the intent. Yes. That's the budget as it stands right now. So we're saving an extra four million? Yeah, you're sitting on about a four million dollar um I call it gravy above your your seven million dollar um reserve requirement.
SPEAKER_00How much did we have, Brad? Do you remember how much we had when we went into COVID? We have about 20 million in the bank. Oh man. Anybody remember?
SPEAKER_01Well, it depends on whether you're talking about sales tax. I mean, we had 14 million sales tax, right? I don't remember. And COVID had or CPV had a considerable amount. We had a good chunk somewhere that existed that we leveraged during the yeah. I can't pull it off the top of my head. Okay. That's right. Yeah. It was quite a bit. Um, and also some of it was intentionally set aside for developing the port that we spent down. That was CPV. Thank you. Um so with that said, that you know, I did put in the memo and then I'll go into the budget itself.
SPEAKER_01Just there's there's ways to resolve the deficit. You know, you could reduce services and cut operations if you wanted. You can reduce the capital improvement project list. Um, and there's there's some things in there you we can we'll talk about in the 20 second. Uh you can do a combination of those two. Uh, you can increase increase revenue. You know, I've I've pitched it probably everybody up there. Oh, not Jonathan. Um, you know, I I like I have a sales tax idea I like. Um, I'll pitch it any day you'd like. Um, and I understand that you didn't go forward this time because you've already asked the community a couple of times, but I think there's a way to have it be more of a benefit to the community.
SPEAKER_01Um andor you could reduce or cut school funding. Um of the ones that I like the best, obviously, it's the increased seasonal sales tax. But those are all for you to discuss and and and talk about in the future. So uh with that, I'd like to, unless there's questions on that, I'd like to jump into the actual budget. We're good. Um if you just go to the general fund summary, looks like this.
SPEAKER_01It's got the yellow on it. Um this is a good way to to look at the revenue inflows, um some of the other funding sources up on top, you know, 11 million dollars there, and then the expenditures that you see down below just by department, it's just an overview. Um, I don't know that we need to go through it line by line. If you have questions on it, you certainly uh are welcome to ask. But it you know, if you look at expenditures down there, you can just look at your operation budgets, administration, executive offices, and it just goes through the list.
SPEAKER_01Um and then the next page is uh just to give you some uh you know an overview, you got your total CPV, uh 5.7. Um, these are being put into the general fund. So how much CPV is going in and where it's going, you know, CPV's got a total of 5.7 going to the general fund, 5.1 uh is just overall general fund, 523,000 goes to the business department, 68,000 goes to debt service, uh, sales tax about 2.7 million goes to the general fund, and debt service of about$1.7 million.
SPEAKER_01Uh keep in mind that the sales tax is limited to six mils, the equivalent of six mills for general fund. Um and then you have enterprise fund transfers in, CPV is going about 1.1, that's um goes into the enterprises fund and garbage, water sewer, um, and sales tax is uh 1.4, which is the clinic. Um, and then capital transfer funds in you have um enterprise funds of 6.5, uh total grants of 850, CPV at 1.4, and sales tax at 2.7.
SPEAKER_01And we'll get in more into that on the 22nd. So don't get too hung up on that. Um, and then you got your special revenue funds down at the bottom, CPV. I don't want to get too much into these just because that's the 22nd, and there'll be better numbers to go with it. Um, if you want the the next page is really a breakout of where your CPV funding is going in the in the general fund. Uh, you have you know what percentage breakouts we have. So administration gets 50% funding uh from CPV, executive office gets um about 50%.
SPEAKER_01Um I don't know that I need to read them, but that's the breakout per percentage. I think the one that stands out um is admin. We hadn't done that in the past, um, but we are doing it this time. Um it's justified through our CPV studies, and we do a lot to support the port, so I don't I don't see that as an issue.
SPEAKER_00Um Bray, can you say that say that one more time?
SPEAKER_01I missed the uh CPV funding for admin is something new that we haven't done in the past, the administration office. In the past, we've we've funded it other ways, sales tax. Um this year we did CPV funding um in the administration office of 50%. We do a lot to support the port. I don't think there's any issue with their um so getting into I didn't bring my ruler today, did I? That's gonna be hard.
SPEAKER_01Um the administration budget. So um if you see the administration budget, you can just kind of scroll through it. I think that the um I'm just want to hit on the highlights. Generally, first off, let's start at the bottom up. What you're seeing is your your revenues down a little bit, uh 4.8%, um, and your operations are at a negative 4%. So this is pretty much the same budget that we had last year going forward this year.
SPEAKER_01Not a lot of changes, um, especially considering that we have considered in this budget that there'd be a 3% cola. We don't know, but that's what it we assume it will be, or we're making an estimate will be. Um I'm trying to make sure that I hit any highlights on it. One of the things you might you might pick up on is in line on revenue. We're not seeing a lot of interest revenue that we did before. That's because we don't have the ARPA funds in the bank anymore.
SPEAKER_01We've spent those down. Um, and then as well. Um, Goat Lake lease is down a little bit. We've never really seen uh that 15,000 estimate, so we lowered it down. Goat Lake is really the lease that we get that 9,000 from. Um at the bottom, the transfers in that 794,000 is the payment in lieu of taxes. It's really the lease payments out of the port because we don't have an assessment for that, and that's what comes to generally support the general operations out of the port.
SPEAKER_01Um And I think that's about it on the highlight on the on the revenue in. And the actual expenses, as I as I mentioned, they're they're down about 0.4%. So nothing has really changed in the admin budget except for LEPC, which is the local emergency planning. We really need to get that updated. And so we've we've put some funds in there. I'm actually thinking we're going to reduce it just a little bit.
SPEAKER_01It's at 18,000. But I think we're going to bring that down just a little bit because it's a little bit over. And we might actually bring up to bring that contract line down just to cut that budget uh slightly more. Um so that is about it there. Oh, and I guess is that legal? We've also reduced the legal budget just because we don't I don't see anything on the horizon, knock on wood, and and the legal that should have a big uh push onto the expenses, unlike last year.
SPEAKER_01Um executive office. Um this is you know the manager, deputy manager, executive assistant. Um, you'll see about half of this is funded from CPV because we spend at least half our time working on report issues, um, more this year. Um and it really hasn't changed too much. I actually see that it's up 6%. I think that probably won't be the case because it'll just take time to backfill um in positions, and and those transitions usually uh take a little longer than anticipated.
SPEAKER_01So um I don't see that really being what it is, but that is the budget at this point.
SPEAKER_00Alex, please.
SPEAKER_05Thank you. Um in the executive office, I remember last year you had added to the travel and training lines. I think because you had anticipated more of that. Do you expect the same for this year?
SPEAKER_01I think it's about the same um as last year. Just there seems to be, you know, we we're we're pretty active in Southeast Conference now, the Alaska Municipal League. I think there's some value in all of that. So I don't I think it's about the same. And really the big travel is well, and there's also more training for human resources and contracts in there. Um so I think it's about the same budget as last year. And then we also travel a lot for the port, but that's charged to the port budget.
SPEAKER_05And so you anticipate just moving forward, it's just gonna be more of a solid extra training because we have larger departments.
SPEAKER_01Yeah. I mean, I I think uh one big improvement that I would say that's happened in the last year and a half to two years is human resources. It's it's been a huge uh improvement over when I started here. And that's that's due to the staff and how much they've been engaged. Uh and we just have more and more human resources issues. We've got more and more staff and just more and more issues, and also contracts. Contracts are just uh I think we've really cleaned up contracting and um and I think it's shown in protests that we've been successful at, um, and when we're in the middle of, of course.
SPEAKER_01So I I think that's very important to continue to build that expertise, and you're just not gonna get away from having to continually do that.
SPEAKER_05Thank you.
SPEAKER_01Uh Rec Center. Um we have their their revenue projection looks like it's a little bit up. Um, I think that's just because it's more and more user-friendly and useful. Um, and then as you look through their their general operations, they're down 11%. Um, I don't, and I and I did not have a full-time uh senior coordinator in this. It would still have to be uh, you know, put on someone that's part-time there.
SPEAKER_01Uh we do have a little bit of adjustment in this where we're trying to move people around to be more efficient, but we're not adding positions in this. So member Wooddill.
SPEAKER_05Thank you. Um, just continuing on that. So uh just to clarify, you have somebody that's gonna be continuing the role, but they're gonna be operating from a part-time position for the senior coordinators position.
SPEAKER_01We we did not put a full-time person in there. So what we did last year is we put it on the seasonal people and and the and the part-time people. So we'll we'll attempt to do that again. It's gonna be a bit of a push for them to do that. Okay. Thank you. But we, you know, that that's one of those items I think I understand that there's at least some assembly desire to put that position in full-time. I'm leaving that up to you all. Um, one of the big things that you see in here that that help push this down is we we we reduce capital outlay. And capital outlays always, I shouldn't point this out um because this makes us look good.
SPEAKER_01Um, but I'll point out that capital outlay is one of those ways that really reduces the budget that isn't necessarily a reduction in operations. You may have a big capital outlay, and you know, you might buy a new ice rink, Jason, and uh it'd be a big outlay. And then the next year you don't, and you show you can show quite a bit of savings that way. So keep that in mind on like 5730 um down at the bottom. Um but in general, it's it's what's the staffness that we have. Go ahead. Thanks, Mary Potter.
SPEAKER_07Thank you. What is the I'm seeing the$50,000 capital outlay um item? Is there is that for a specific capital project? Is it a nice rank or yeah?
SPEAKER_01So uh it's it's$32,000 for$25,000. $50,000 was what we budgeted and we haven't spent it yet. Um, but the the intent for 2025 is because we have the new outdoor rec coordinator, they need equipment to make it happen. So we have a four-wheeler with a plow, a trailer, um, and a 20-foot container to put all this fun stuff in. Um, so they're gonna need a bare minimum that and more to maintain the ice rink, hopefully work on some trails, store stuff, trailer to move stuff around.
SPEAKER_01It's just getting that position up and going and started.
unknownThank you.
SPEAKER_00Manager Ryan for uh health insurance expense, item 103051545. Um, it's down 32 percent from 2024 budgeted amounts. Is that going to be something we see across the board, or is that just for this specific instance?
SPEAKER_01Yeah, that's not across the board. The the health insurance is always one of those, if you're hiring new staff, you estimate the per family rate, which is you know forty thousand dollars or something like that. Um, but when you have a staff that doesn't have kids or a family, that's considerably less money. So this is because we know what staff is there, and some of them aren't as much money. So that's why you're seeing that reduction. Thank you.
SPEAKER_01Assembly budget. Um there is something were we gonna add to assembly? Oh, I know. Um we'll have to add that later. Uh as you walk through the assembly budget, uh the the first thing that's that's a big change is your legal. Um and that's because we don't foresee the big fight, you know, whether that's um uh APT's rate adjustments or um all I can think of as gerrymandering.
SPEAKER_01Um what is it? Redistricting. Redistricting, thank you. Got the wrong got the wrong term out. Um uh so we don't we don't foresee one of those big cases on the horizon. So we've cut that legal way down. I actually think it can probably go down more than that. And we I think I might cut it a little bit because I think even at 100, it's a lot. Um, and you probably don't need that. Um that's not it. Um repairs and maintenance.
SPEAKER_01We got oh, we have the other standout for you all, just to be aware is we have uh repairs and maintenance at$10,000, which is something you haven't seen in the past. Uh, that is because uh there's some intent and in to replace the cushions. Um so I hope that can go forward. Um, so you see some of that, um, make people more comfortable when they're here. Um I think scholarships. That's another one.
SPEAKER_01Um, you give out scholarships every year. Um and last year you wanted to give it out to more than one person. Um we increased it. Um, I hope that we've increased it and you will embrace instead of necessarily giving it to everybody, but increasing it so that it's a larger amount. That it's a very small amount, in my opinion, um, based on today's dollar. And I would hope that you could increase that a bit and make it more attractive, uh, so that um you know the the kids coming out of Skagway get a nicer scholarship to go to college, a little bit more money, make it worth their time to apply and come back and and and receive that grant.
SPEAKER_01So you can embrace that or not, but but ideally you you make it a little more beneficial to the kids coming out of school.
SPEAKER_03Um thank you, Your Honor. Um the community funding grants, it seems as though we always have a surplus in that. I mean, that's just my recollection. Is that perhaps overfunded typically? It seems that way to me, but we we usually don't spend it's it three percent or four percent. I think it's it's three percent.
SPEAKER_01I mean, I think you know that's set by resolution. So if you want to amend that, um I guess we could also lower it, but it it seems like it needs to be accounted for. We could lower the amount, right?
SPEAKER_03But just in terms of balancing the budget, that's something that seems like there's always yeah, extra money at the end of the year there.
SPEAKER_01I mean, I suppose you could you could lower it and then just know that if if you had more grants, you'd you by resolution, you would need to live up to that unless you want to change that. Okay, thank you. Um, other thing when you when you bring that up, um O'Rion, the other thing that doesn't ever seem to get funded is the$115,000 for daycare teen assists because you have that program out there that if somebody wants to start a daycare, you're gonna fund them at a at a at a pretty good chunk of money.
SPEAKER_01No one's ever really applied for that to start a daycare. We put it in there, we we talked about quite a bit of not. Um, you know, as soon as I don't, somebody will apply for it. So maybe I should, and that'll inspire somebody. But uh but it's there right now. I guess that's up to to you all if you want to change that. Um, because you have that laid out there in a program, and there's no timeout on that program. So member Waddell.
SPEAKER_05Thank you. To clarify, that's the program where um we can get reimbursed for attending uh committee meetings, correct? And no.
SPEAKER_01No, there's well, there's there's a couple of things in there. There's one where the the daycares get a per child amount of money for for operating daycare, but then there's the the grant program, and I'm struggling for all the details, but essentially if you started a new daycare, you can get funded. $50,000. I don't remember what it is. It's a big chunk, it's it's a bit.
SPEAKER_04I think that's what it's yeah, yeah.
SPEAKER_01So there's yeah, so so that that's what part of this is accounting for. Okay, thank you. Uh lease payments. And I think that's um we have an additional little bit of memberships and subscriptions. Part of that, and I believe maybe Clerk Brennan can help me, is is being able to publish our uh resolutions and ordinances online. There's a little bit of increase there.
unknownOkay.
SPEAKER_01Um, you have your revenue up above. Um you don't have ARPA funds, so that's why you see such a big chunk uh up there this year. As you go down, uh, this is one of the departments that wanted an administrative staff to help process everything. Um, I have cut it out. Um, and then one thing right off the bat, you'll see contractual 12,000 going up by 100% there. Just to let you know, that's that's been something that's been accounted for in other areas.
SPEAKER_01It is our medical director, and we have to have a medical director. So we've just moved to contractual because they're not an employee in the past. I think we've had them probably in the wrong spot. And so it's just being accounted for in the right spot. Did Silverwood.
SPEAKER_05This may sound a little naive, but we have a medical director at the fire department and one at the clinic, but they are separate people, right?
SPEAKER_01They are, they haven't always been separate people, but they always get paid separately, regardless of whether they're the same person or not. Thank you.
SPEAKER_05Um actually I have one more question, if you don't mind. Um so we've had the ARPA funds for a few years now. Um, what did we do before that? Because it's kind of a large chunk of money that we're no longer gonna have access to. And I see that we're just like what what is the what did we do before we had the ARPA fundings? Did we just have that same?
SPEAKER_01I don't want to use subsidation, but like what what we we did what we're doing this year, which is use sales tax, CBB funds. So ARPA was just, you know, that was a replacement for lost revenue from COVID. And so that's they that was a bailout for the lost revenue during COVID. And so we've we've been using them down as as appropriate, but now we're we're back to fully functional, and so we just use our our revenue. Spend our money, yeah. Exactly. Thank you. Yep.
SPEAKER_01Um we haven't increased staff to speak of in the fire department, um, or we just haven't. Um really, there's not a lot of change in the fire department budget. You can see we're a 1% increase. I think the the fire department is one of those departments again that's being asked to do more and more search and rescue, rescue on the rivers, uh, the Yukon, you name it. Um, I'm always pushing back. Like we've we've got to keep care of town, do road, you know, rescues, road access rescues.
SPEAKER_01Um, that never goes off well when the fire department um didn't show up to help people out of the river a few years ago. That was in my direction. We weren't ready. Um they want to be ready. It just costs money and people and time. And so that was fully on me. We were not going in the river because we weren't trained up. Um, the fire department's more than willing to do everything and wants to, but it's one of it's it's one of those directions. We gotta we gotta maintain what we have first and then decide what the community is willing to fund.
SPEAKER_05Alex? Thank you. There's a$31,000 of dues, memberships, and subscriptions. What is that? Because it looks like we haven't we budgeted$11,000 this year and didn't spend anything close to that. So what is that for?
SPEAKER_01I believe we have a we're we're trying to get a new computer program that's going to help track payments and that's it's all in that. That's the biggest increase. That wouldn't fall under computer and support. No, I believe it's a subscription-based uh program that manages um the payments and and there's a couple other things that manage in there. I'd see if she appreciated library. Um, I would say the library is status quo from last year.
SPEAKER_01That um it's actually that 6.2% is going to go down a little bit because uh we just found out that she got a little bit of extra money in some of her grants for collections. Um, but there's just really no changes to the library this year. It um same staff, same people, um just clicking along as usual. Um museum, very similar.
SPEAKER_01It's you know, last year there was a hard push on the museum to be open a lot more. Uh, so we we forced more staff on the museum last year to be open more. Uh so they are open more, but other than that, there's just not a lot of change in the museum budget either. It's pretty much the same operational procedure as last year and the same staff. Maybe, I mean, obviously there'll be some seasons that are probably different, but the same staff structure. Uh police, uh very, very similar in that um we're we're still trying to get our extra police officer.
SPEAKER_01Um, we are uh you know it's challenging to get an officer to come. The the chief and I have talked about other models, uh two-on, two off kind of models during the busy season. Uh so we're exploring all sorts of options, uh, but the budget is really not changing. Um, we'd like to get an extra officer because we do run a lot of overtime, which hurts us. Um, and it's not good for our officers in the long run. Um, I think one thing you can see down, one of the big changes you can see is capital outlay there is$40,000.
SPEAKER_01Uh primarily we want to get um one of the little electric gem carts for the we're hoping that we'll get the community uh enforcement officer again. And instead of having them drive a full-size rig around all the time, especially since they're focused downtown, get them a parking rec has in those little electric cars. So they'll they'll only be able to chase down slow walkers. Um, but that's why you see that$48,000 there.
SPEAKER_00Man, Ryan, we've had some discussions about communication upgrades for the fire department, the police department. Do we see any of that effort in this budget?
SPEAKER_01Um yes and no. Not what we're looking at today, but um there is we've we've been at this a long time on communication upgrades. Uh and I'll take the opportunity to say the outage the other day was not our communications. Um, if you saw that, uh Nix will come out. Uh that was a something outside of our control. Um but we finally got a package together that I that I like. Uh I hope Chief Reddick likes, um, and and Chief Rauscher, uh, which is an upgrade, a complete upgrade to our communication systems over there, you know, the the Ztron magic boxes and the extra station.
SPEAKER_01And you finance has it on their agenda for tomorrow. Um, and that's in the capital project budget. And um it's a it's a big project. I think it's needed, and it's on finance tomorrow. And then if finance recommends, we'll bring it to uh the assembly in first week meeting in November. But it's not in this specific budget.
SPEAKER_00Um and real Brad, just real quickly, this budget, the 2025 budget, does still have it's it's budgeted for that extra police position. It's just not filled.
SPEAKER_01It it is. It's not okay. Correct.
SPEAKER_00Yeah, we correct. And so we're not removed that position. We didn't in that position. That position is still active and funded. We're just waiting to fill it.
SPEAKER_01It's still actively funded. Um, we got beat out. Um, we had a we had a gentleman come to town, seemed like a good guy, but he he went to another community in Alaska. Um so we keep trying. Um, I know Chief Reddick has secured some temporary housing for them so that to to ease the transition coming in. So we have that. Uh it's really just trying to find the person that wants to be here and and be part of Skagway. And so we keep looking for that. And if we can't, we like I mentioned just a little bit ago, we would like to explore the two on two off.
SPEAKER_01Maybe uh I think what Dutch Harbor does that, uh Kotzebue. Yeah. Yeah.
SPEAKER_04Yeah, that's what's going on right now that's trying to get all of that bigger out of us.
SPEAKER_01Um that might that might be an option we just need to explore. It I know that wasn't necessarily the community desire, but it might fill in, take some pressure off of them, and um provide us a service we need.
SPEAKER_00Do we have any of those same situations with the fire department where we have a funded spot, it's just not filled? We got them all filled.
SPEAKER_01No, man, everybody wants to be a fireman. You know, it's it's it's what it is. They're pretty cool. Those guys are pretty cool. I mean, come on. Oh sorry, Chief Rennick. Um communications, that's dispatch. Um you'll see it's down a little bit. Uh that uh that's a little bit to do with uh some computer support transitioning and and straightening some of the budget out between police.
SPEAKER_01Fire and communications. But also we have a long-term employee that's leaving us at the end of the year. And so with that transition, you know, they were at a much higher step and grade than replacement will be. And we do have a replacement that we're training up right now. So we're excited about that. But that'll also be a little bit of a cost savings in 2025.
SPEAKER_01Next year. One thing to note in public works, and this is always a little bit hard to understand, if you slide down to line 5170, you'll see that we have$803,000 budgeted for salaries. And you can just slide over to 24 and say, well, we we've only spent 270 in the first six months. Why is it so high? Well, their time gets allocated out to all the different departments. And so depending on what department they work for, you know, if they go rebuild a pharmacy in the clinic, then they get charged to the clinic budget under the, you know, under their salary lines.
SPEAKER_01And so that can be considerably lower than that, depending on how much they work for other departments, as opposed to doing just straight up public works roads type work. Um so that always is an interesting one to try to estimate and guess where we should be.
SPEAKER_00Um is the rate the same, Brad, for whatever department they're working, regardless of what they're doing, it's the same rate.
SPEAKER_01Yeah, we don't we don't have favorites. We charge everybody the same. Yep. Yep. Um utilities have gone up. That's just a you know, that's just gonna happen. Capital outlay. This is one of those where you don't see a big capital outlay. Um, they actually haven't spent it in in 24 yet, and we're just not budgeting for it in 20 uh five. Uh street maintenance, uh we always like to bump that up, but to keep it down, we we kept it at 160 this year. Um and that is really about the all the significant changes for public works.
SPEAKER_01This is one of those departments public works cannot keep up. There are more requests than they're gonna fill. You know, I know that all of our facilities have requests in for public works. This is one of those that if I could, I would add a facilities maintenance person to. Um the director didn't actually ask for it. I put it in there because I wanted to fund it, but I I just haven't. Um, and so our facilities are in good shape. Um, some of them are in great shape, but there are requests continually for public works to to continue you know upgrades and and services to the buildings.
SPEAKER_00Greg, what do you estimate that position would cost us? 100 and something a year with with benefits and um about$150,000.
SPEAKER_01$150. Yeah.
unknownYeah.
SPEAKER_05Thank you. Um, the$5,000 for levy maintenance, is that for cutting down the trees out in Dai E to keep them from overgrowing on the levee there?
SPEAKER_01Because that's no, we already did that out there. We we always go through and brush any levy and work on levees. Um so that's just continual levee maintenance that we're doing. So we did the brushing on the Dai E levy maintenance. Um, so we have the levee along the Skateway River. Um we have some above there that we work on. So it's just standard levy maintenance.
SPEAKER_05It looks like we didn't use it in 23 or 24 yet, though.
SPEAKER_01So I guess that's my asking. I just haven't seen it build okay for 24. 23, you're right, but 24 they did go out and well, they did die for it. That's what I mean. So that's where you'll see that. Um in 24. Yeah.
SPEAKER_00Vice Mayor Potter.
SPEAKER_07Thank you. How many staff do we have on public works right now? And what are they actually? Can you give a little bit of a list of what they are responsible for? What are they doing?
SPEAKER_01Yeah, for responsibility-wise, they you know, they're they're they're road maintenance, they plow the roads, they fix the roads, you know. They we got you know, they you just saw like a new intersection over on I guess eighth and main. They do a lot of work, they they do all the repairs in our buildings that are not electrical. Um, they shovel sidewalks, um, maintain trails. Well, that's um parks, usually parks and rec. Um, man, I mean the list goes on and on.
SPEAKER_01It'd be hard to list everything. They're our very talented group. They're actually going to hopefully rebuild even the Pull and Creek uh restrooms this year uh to make them ADA compliant, not nearly what we were hoping for, but better. Uh so they're they're they're highly functional individuals that take care of a lot of stuff. We stay out of electrical. That is obviously um, you know, legally, we cannot get into that. So that's the one thing we don't do. Um, they maintain our boilers, they even find secret beeping uh uh apparatus in here.
SPEAKER_01And you and you want to know how many there are? How many are there? Eight public works, seven park and wreck in the summer. Park and wreck. Um so park and wreck, uh it's it's a five percent increase. Uh, I think we cut one uh seasonal person out of that position or out of there this year.
SPEAKER_01Um usually we're not able to hire uh all the seasonal crew to go out and mow lawns and stuff, but the last few years, um Tyson's done an amazing job of recruiting the high school. And they come out, they work hard, they're great, they're happy, uh, they're paid well, and and they want to be there. And they they also you know don't mind working the holidays and getting that overtime. So uh it's been working pretty pretty well. But other than that, there's just not uh much difference in the park and rec budget um than um last year.
SPEAKER_01I think our parks look pretty amazing. Trails look great, and that's the we're just gonna continue that. Um, I do hope one thing that we could make happen this year would be a contract, and we really want to start looking at the um maybe this fall we can get it done or next uh next spring. Just started looking at the fire load up at the lower Dewey Lake area and trying to get rid of uh some of those uh trees that are down up there and get them out of there. So hopefully uh prevent some of the fire danger up there.
SPEAKER_01Visitors department. Um as I mentioned earlier, they're really being asked to do more and more. Um last year they managed, I think the last two years even they managed our dock ambassadors. We're gonna move that to the to the port department this year, but they also get asked uh to manage smart contracts, uh the the R V contract, host the events. Um and there's more and more involved in that continually, lots and lots of requests on them, indigenous uh tourism training.
SPEAKER_01Um and they they really do need another staff, and I'd love to get them one, and and they and they want one, but I have denied that again. Uh so um that is out there, otherwise, um they manage website for our tourism department.
SPEAKER_00I'm trying to see if there's anything that's Brad. How many members of the tourism department? How many employees? Well, there's two full-time, right?
SPEAKER_01And how many seasonal? Two and two? Oh two full-time, and how many seasonals do we have?
SPEAKER_04Seasonal. Well, two seasonal departments seasonal positions are all in the visitor department, and roughly the eight or ten percent of our visitors just aggregated every day.
SPEAKER_01Questions on that one? And there's the bonds. Oh, go ahead, Andrew, I have one second.
SPEAKER_03Thank you, Your Honor. Just a quick question. What what are short-term rental taxes in the revenue line uh forty seven? Hotels, hotels, airbnbs. So it's bed tax? Bed tax. And that goes to the visitor department. Okay, thank you.
SPEAKER_01Okay. Um we have the bond. We have to pay the bonds. I don't I don't know what to say to it, otherwise.
SPEAKER_03There's a one more question on that. Um how do we monitor the Airbnb that we're actually collecting it, or is it just word of mouth and just you know, we got good people in City Hall who know what's going on? I mean, how how is that?
SPEAKER_01I I would say we have good people that are very active at trying to make sure we're monitoring it. Uh we know people are slipping through the cracks. Okay. Most people are honest, and when they're reminded, they come forward. We have the occasional that wants to maybe avoid some of it, and depending on how hard they fight, depends on how hard we go after them.
SPEAKER_06Thank you.
SPEAKER_00If we have a they have a business license and they're on the list to be to receive the the notifications of payments.
SPEAKER_03Just one more question on that. The the might get what this business is called wrong, but Turo, I think it's called, um, in terms of uh automobile renting. How does that I mean is that something that kind of falls through the cracks too? Because that seemed to be pretty prevalent now.
SPEAKER_01It can fall through the cracks, but we reach out to them and say, you need a business license, you need to pay sales tax. Okay. Thank you. Whether they all do or not, I'm sure they don't, but we do our best to reach out to them.
SPEAKER_03And then in terms of the contract we signed with the online sales tax vendor, I think it was you know 11% or something was their cut to pull that in. Does that revenue go back into sales tax or is that part of the short-term rental sales tax? It goes to sales tax. Okay, thank you.
SPEAKER_00Have we realized any revenue from that program yet? We have.
SPEAKER_05I don't know where we're at with it right now, but hundreds of thousands of dollars.
SPEAKER_00Oh, good news. Okay.
SPEAKER_01I don't have much to say to the bonds. The bonds are there. Um I don't know if anybody has any questions on them.
SPEAKER_00Um Brad, just so I'm I understand it. Port bond, uh 5945. Which one? Uh 5945. That's not the that's not the revenue bond.
SPEAKER_01That's the that's the 2015 five million dollar port bond. Which one? We had a general obligation bond in 2015 for$5 million for port development. Um, and that's one that wasn't spent until we got um into working on the the restrooms down there for the port and the port project.
SPEAKER_00So we're not seeing the port bond, the revenue bond uh maintenance here on this schedule. No, that's in the port budget. Okay. And that's running us about four million a year, is about our revenue payments with interest on that revenue bond. And Brad, if we're gonna get to it later, just tell me.
SPEAKER_01We can I'm gonna get to it later, but it's 4.28. 4.28. Okay. All right. Okay. So bonds, we can move on. Uh we have the land fund. Um we have you know the revenue from it up above, and then as you move down, we have contractual, uh, investment advisor, and then we have 370 going to capital projects, and we'll talk about that in the 22nd.
SPEAKER_01Um, but you want to roughly find me what that was for 370 go into the capital projects for land fund. Which was it?
SPEAKER_00Some remember Hanson. West Creek.
SPEAKER_03Oh, thank you, Your Honor. So the minimal um balance of the land fund is outside of this budget entirely every year. Is that accurate? The the minimal that would that's required to keep? Yes. So that's and we uh I believe we have another account like that as well. I'm not I'm drawing a blink on what that is right now, but um that has a balance outside of it? Outside of our annual budget. I'm not thinking of what it is, but I think there is a second one.
SPEAKER_03Not that I can but the land it's three is it three million the land fund? Is that the million, the the minimum that we we we maintain?
SPEAKER_01The principle. Yeah.
SPEAKER_03Thank you.
SPEAKER_01And so the 370 is uh West Creek levy and$20,000 to um finish the plat, certified plat out there. Um okay. Beyond land. Uh clinic budget. Uh so I think the clinic uh you know we have we have a new director, a new direction. I know that we uh as a community voted to turn it over to a 51c3.
SPEAKER_01That's not gonna happen tomorrow or next year, most likely. Um this is gonna be a process. So this is the budget the budget as it stands for 25. Hang on. I think of note on this is if you go to the 30 330 grant in revenue, you're gonna see 1.3. That's because in 24 we still had an extra bit of essentially capital improvements to the facility.
SPEAKER_01There was an extra grant, not the normal HERSA grant, extra money to spend. Um, and I think they're getting that done. They bought some X-ray machines and some other things. So you'll see the standard three point or 1.3 million from HERSA. Um, and then the other revenue that's significant in this is you'll see that the clinic revenue is projected to be up a lot in 2025. Um, and really hope that's true. And the director seems to be laying the groundwork to make that happen. He's increased our encounter rate, he is getting the pharmacy closer and closer to be opened.
SPEAKER_01He's got dental going, so um, he's projecting a lot more revenue. And fingers crossed, that comes true for the for the um clinic. Uh, with that said, uh there's a lot of shuffling down here on and who's uh servicing us, locums, nurses, um, etc. And I don't know that I could intelligently talk to each of these. This is way outside of my comfort level, um, but I will say that with this and Albert Wall's um grand plan, I think what is important to look through this whole budget is to look down all the way down to where we as the municipality have been supporting the clinic.
SPEAKER_01Um, and you can see that we're now projected to support the clinic at$1.46 million. You know, um, nearly$1.5 million of taxpayer funds to support the clinic. Um, while that may sound like a lot, in 2024 the subsidy was$2.2 million, nearly$2.3 million. And in 2023, it was a million dollars. Um Director Wall has stated he wants to reduce that subsidy by 30% a year over three years.
SPEAKER_01Um, and that he seems to be living up to that. Um, and previously what had happened with the clinic budget, the the big jump in 23 to 24 was um the director would come to me and I would automatically cut a million dollars out of their request and they would live with it. Um in 24 I didn't, and I let it go to see it what the assembly wanted because there was a lot of pushback on me for that, and the assembly left it in there. Um, so this year it's 1.5 nearly, which is down from last year.
SPEAKER_01And I hope that pandard continues and maybe even uh he gets more revenue than he thought, and it's less than that even.
SPEAKER_00So it's good to see that number less. Remember last year when we were talking about the$2.2 million number, that wasn't gonna occur again. So I'm glad to see that number down. Me too.
SPEAKER_01Um garbage budget. Um it is, I would say it's a standard budget, except for there's there's a catch to this budget, and that is if you look at the top, there's a contractual$300,000. That's because we don't know what to do. That's MSW, right? So that's shipping it out now, assuming the incinerator um really goes down and we burn less, um, and we're going to burn less intentionally to try to save it. So, you know, once a week burn, that gets rid of our sludge medical waste instead of burning all the time in the summer.
SPEAKER_01And so you'll see that that's that big increase there, that$300,000 for shipping. Um, we anticipate that going full tilt here. Um, well, it should be going full tilt now, actually. So that's the big change there. Um, insurance is up, um RM is up a little bit, uh cereals and supplies a bit. Um and then hazardous waste is up a little bit as well. We we still do household hazardous waste.
SPEAKER_01Uh that's a good program. Otherwise, uh this budget hasn't changed much as far as there's no staff changes. Um, right now we do take our higher paid employees and put them on the garbage crew all summer. Um, so that might be a water and sewer employee or um, you know, a heavy equipment driver, and they go ride the garbage truck because they are such a small staff over there. Um, we would like to add a garbage person, but um, that's what we do now to fill in.
SPEAKER_01Haven't quite wrapped our heads around whether it would actually be a savings debit person on. There's a lot to that, and it depends again on insurance costs, etc. So um there's not much to say about this budget otherwise. Oh, and and I'll just point out that you'll see uh$6 uh$80,000 of that budget is supported by CPV. Is what say that again, Bruce? It's supported by CPV. And this is this is one of those funds uh I that I'll just jump on my soapbox.
SPEAKER_01It's called an enterprise fund, but we have no intention of making it an enterprise fund. So it's a frustrating fund because enterprise funds are supposed to pay for themselves, but it doesn't even come close. And it and if we did make it come pay for itself, it would be really, really hard on the community construction, everything, right? The rates would have to go through the roof. Um, so we're highly subsidizing garbage rates. Water and sewer. Um, this is another one of those budgets uh that is pretty standard.
SPEAKER_01Um, it's it's gone down a little bit. Um, I don't think there's anything that stands out on this to speak of. Um, it's it's the same operation as it was in uh 2024. We'll be you know hopefully in full on um moving forward with the wastewater treatment upgrades, but there's just not a lot to say about this one. Um, and again, it's another one of those enterprise funds that is highly subsidized. Um, you know, you're you're getting your$479,000 from CPV to help offset the cost of operating.
SPEAKER_01So port, and this is um and small blue harbor. This is your this is your enterprise fund that's. Functioning. You know, the revenue that comes in is supporting the port. So you have your you know your permits and licensing fees, interest, uh lease, rental. If you look at that, that 4620, that's what goes essentially pilt to the operation funds. Um, and then you have vessel impact fee, that's$12 million, we're estimating for 2025.
SPEAKER_01And that's the fees that we charge on both municipal and private docks. It's split, you know, a different lower rate for private docs. I think it's 8 and 13, if I got that right, Cody. Eight and 13. 8 and 13. Uh, and then you have uh a grant there for 850. And you will notice not a lot of grants. We're not funding, we're not we've made a decision not to put any grants in the budget that we don't have. So that's you're not gonna see where in the past we projected grants on a on a hope.
SPEAKER_01Yeah, we're not gonna do that, it confuses things. Um, worthage, in total, you have about a 16 million dollar budget um revenue form the report. That's it's fantastic. It allows us to do a lot of good work down there.
SPEAKER_00Um manager Ryan, just so I'm reading this right, we're the 25 budget will be roughly eight million bucks in the black for uh um as it's noted here in the budget. Bring in 16, spend eight.
SPEAKER_01No, no, no. Uh in total will be three hundred and ten thousand into the good. That's because you you got your operations up here at eight million dollars, but if you if you follow it through, you have capital projects, harbor, general fund, it takes another you know, 7.8 million dollars out of that. So you I didn't scroll down far enough. You get me excited, I think. Yeah, no, we're doing it. Yeah, me too, right? Uh no, about 310.
SPEAKER_01I think that though what's important to remember is when you go through this, the things that you're going to do to your port to upgrade it in 2025 are significant. And you know, in 24, you you killed it. I mean, you got a new cruise ship dock, you've you've got lights in places you never have lights, you have power capstains, you know, you're cleaning up the site down there. Every time you touch contamination, you've you're not just leaving it, you're you're you're cleaning it up, you're continuing to improve down there. It's the same pattern that you're looking at for 2025.
SPEAKER_01You know, you're you're gonna hopefully get anodes on your dock, hopefully some electrical lights, you know, permanent lights on on the ore dock. Um, it just because it just continues to get better and better down there and cleaner down there, and it and it's looking better. We're hopefully gonna clean up the uh you know the the old ore shed, and the maintenance is full of uh uh filters and debris. So we're we have an environmental firm coming up to tell us how to dispose of all those.
SPEAKER_01Uh it it's just getting nicer and nicer down there, and and that is the continued effort to happen down there. And so that's what you're seeing in all of this. A lot of those projects I threw at you were capital projects, but but you also just have you have contractual at 575. That's because we know that every time we we come against something down there, our intent is to fix it and clean it up, and so you get a lot of contractual work in there. Um legals is maybe a negative spot, but we funded it well just because we know that you know the the dispute over the OR doc is gonna get um heated probably after the first of the year.
SPEAKER_01We're gonna go to mediation um probably sometime in January or February, and just anticipate that's gonna be a continued ongoing drag there. Hopefully we get some of it back. Uh, but but you have to be prepared for that. Um insurance is up. Um it may be up more than that. We've been working with our insurance agents to make sure that we have everything properly insured down there. That's a lot of work. Uh, we really are starting to outgrow even APEI. And so hopefully we can go to a larger firm that's more familiar with marine insurance in the future.
SPEAKER_01But right now, they're doing us hopefully a good service and hanging on until we can get to even a larger firm. Costs are going to go up, but being appropriately insured is important. Um, we do have an additional person in this budget. This is the one budget that we have an additional person in. Um, my intent uh has always been to have the port stand alone. They're they're a big department, they need a lot of staff down there and they need to be functional. We've got a maintenance person this year, which is fantastic. We have another assistant.
SPEAKER_01Uh, they got a lot of money running through there, they got a lot of maintenance running through there. Um, and hopefully next we'll get a mechanic/slash uh maintenance persons down there as well. And get a new loader down there, um, a new cart to drive people up and down the ramp, at least on the ore dock. Hopefully, uh, you know, one of the issues is that dock is steep, and some people that are are not as physically capable have trouble getting up the ramps. And I know that um our port director has actually been down there physically pushing people up the ramp at the at the at the high uh low tides.
SPEAKER_01Uh they can't make it. And we're hoping to get as you know, some sort of a people mover cart down there, similar to what White Pass uses. Um but in general, there's there's just a lot of improvement um that's happening down there. And yes, we're only seeing a 307,000,$310,000 improvement in the black to the port or you know, fund balance commitment. But that says a lot for the amount of work that we're hoping to get done down there. My my guess is by the time you're done with 25, it's gonna be more than that because you're gonna have a hard time getting all the projects on the ground in one year that are in here.
SPEAKER_01But we're you know, fingers crossed. Because of that, because of money or because of it's just not feasible to do it. Just time. Time will time, you know, we're always hounding um well electrical engineers right now, because it's it's maddening. You're like, we need the bid documents, okay. So there's just always somebody that we're we're pushing on to get these things out so we can have more and more improvements down there. And there's some things fall by the wayside, some things don't go, and that happens throughout the budget. But I would I would anticipate you're probably going to see um that be more than it is.
SPEAKER_01The one caveat would be depending on how much rock work we do, um, just to maintain the safety of the slope, that that might be a we have a budget in CIP, but you never know what that's really gonna come into next.
SPEAKER_00Brad, could you uh just through the op once we're down past the$8 million line, we're down here into the transfers, depreciations, other non-cash items. Can you walk me through a few of these, especially these big line items? I just want to make sure I understand what those are. Are those these projects you were just talking about that are in the works?
SPEAKER_01The transfer to the capital project, like the 5.5 million that we got. Yeah, so those are those are some of them that I threw at you from uh the uh uh that we'll talk about on the 22nd. So anodes, electrical, dock water, uh rock slide mitigation work, those those are the big items in the capital.
unknownRight.
SPEAKER_00And those will come directly out of here, and we'll see this type of if it's approved at the capital budget side, we'll see this kind of reduction in the uh port fund. Yes. Alex Thank you.
SPEAKER_05Um for the revenue, um, 4130 for white pass lease. Are we no longer leasing to white pass?
SPEAKER_014130.
SPEAKER_05Second line down, first page.
SPEAKER_01Yeah, it's now in um where did it go? Leases and rentals down below. 794.
SPEAKER_05Thank you.
SPEAKER_01Yeah, we have an easement payment and a lease for them.
SPEAKER_07Thank you, Your Honor. Um, there's a little bit of an increase in um the capital outlay. Um what's what do you have in mind for what's a thought on that?
SPEAKER_01Uh loader is the biggest part of it. And then uh cart. And then oh, and the generator total station upgrade. So the total station, if if if I think we we haven't talked about rock slides in a lot, it is really giving us nice data for the rock movements up there, and so we want to make sure we keep that fully functional. Um and it appears to be working a lot better than the old wire extensometer port.
SPEAKER_00So any more questions on the uh port?
SPEAKER_02All right.
SPEAKER_01Onward. Small Blue Harbor. Um it continues to to benefit revenue-wise, primarily from you know, the increase over what we've seen in previous years, although you can't look back that far on this one, it turns out, is that commercial um passenger fee that gets charged for the tendering vessels that come through off the boat. You know, there's a a small fee for it to come through. Um, and now that we're tendering all the vessels from that forward ship through the small boat harbor uh off a railroad, that's why you see that um big increase in the commercial user fees there um that you didn't see in years past.
SPEAKER_01But since the rock slide and the tendering operation, that is there. Um, and then the rest of it is just the general small boat harbor revenues that you get from all the activities they do down there, transit moorage, bowshed, uh showers, annual moorage, boat storage, haul outs. Um so it's while you're you're you're you're getting a lot of revenue off those commercial um user fees. I think you know all the small boat harbor users and the seawalk users wouldn't really like to get out of that tender and operation at some point because it really does take away a lot of the functionality of the small boat harbor.
SPEAKER_01So hopefully someday uh that uh we'll get that brick grant in place and the rock down and we can stop the tender and operation. Um as far as the operation budget, um, there's a little bit of engineering in there, and then that's a little bit higher this year. Um and then we have the I'm looking here, we got impound and disposal. Uh it sounds like we did get rid of a boat this year that just hasn't been built out yet, and we anticipate another one at least.
SPEAKER_01And then there's the capital outlay, which was a four-wheeler and half of the loader. Half of the loader. What was it again, Brad? Half of the loader. The loader's being big split between port and small boat harbor. So half a loader. All right, so they're paying 156, they're paying half. Yeah. So so um, and other than that, I mean it's it's kind of what what it is. Capital outways the big the big bump there. And the loaders needed, you know, to have one down there, but um, it's getting a little long in the tooth.
SPEAKER_00Right, is the haul out? Is that the revenue we see from the uh the the commercial the commercial boats up there on the flat?
SPEAKER_01Generally, I mean there's some sailboats and stuff like that, but it's it's almost all the Haynes commercial uh killnet fleet.
SPEAKER_03All right. Thank you, Your Honor. What was the auction sale revenue for one dollar?
SPEAKER_01Uh I don't remember what that was a boat, wasn't it? Was it a boat this year?
SPEAKER_03Someone bought it for a dollar. Okay.
SPEAKER_01It wasn't me. All right. I think that's it, right? Did I did I hit the end? No. That is it. Um I don't you know you have sales tax in here so you can understand roughly how the budget is impacted and CPV as well as capital, but those are all for 22nd.
SPEAKER_00Um and I don't know if you have any questions. Manager Ryan, when do you expect us to get your final draft of your budget? When will when do you expect us to make it ours?
SPEAKER_07Require it beyond the first meeting in November.
SPEAKER_01All right, so first meeting in November, we'll have it. Yeah, and on the 22nd, we'll talk these other funds. I'll leave everything else in there though, so you can bounce back and forth between um these and what we just talked about. And I would like to say, um, I've talked to some of you about this, uh, assembly members and and mayor, but one of the things I always ask of assembly members is if you want to see a change to the budget, you know, like you're gonna you're gonna get it first meeting in November.
SPEAKER_01If you want something added to the budget, then you're gonna propose it and over when it becomes yours. I would, I would, I would request that you come schedule a meeting with myself, Heather, Deputy Deach, and talk about what you want so that we can help you understand the best way, in our opinion, to fund it, because you may want whatever it may be, uh, it doesn't really matter, except for I'd like to not be sitting here saying, well, you can't fund this out of sales tax.
SPEAKER_01I don't want, I don't want to have to have a debate that's like on on the nuance or the understanding of the budget. So we'll help you understand the way you can budget it. Because let's say you you you overfund CPV funds or something, you overtax, or you go over an operations for sales tax. I don't want to have to be sitting here and saying, no, you can't do that because it seeds six mils. It'd be much better to have the conversation and say, well, if you want another person in here, this is where it can get funded. And we, you know, it's 30% CPV and 70% sales tax, and that's all good.
SPEAKER_01That's how the Rex Blender split is. So just ask for a meeting, we'll sit down, we'll help you understand how to put that motion forward in the right way so that we're not on the on the debate of technicalities. Instead, it's just a a direction from the assembly. That's all I'd ask.
SPEAKER_00And thank you, manager Ryan, for letting us have that access and bring those things to you before we even get to November 1st. So that's a good thing. Um any further questions for the manager? Assemblymember Waddell.
SPEAKER_05Thank you. So in um the beginning of the meeting, you discussed uh different ways to address the deficit, and one of which was um increased revenue. And you know, your note here says without a public vote, the only viable option is raising the mill rate, but you mentioned that you might have some other ideas. Did you care to expand on that at all?
SPEAKER_01I think my idea is nothing that you can do this time. It you know, I like the increased sales tax idea. I'd like to say I would like to see a sales tax that was dedicated to our enterprise funds, garbage, sewer, water, it'd be free of the community and commercial businesses. That 2% would be about$4 million or more, would totally cover those budgets, plus some capital outlay. Um, I really like it. Um, I like the idea of it. I get a lot of pushback at first, um, but sometimes I swing people, uh, sometimes I don't.
SPEAKER_01But uh, I think it's you got to offer the community something. And I think when you offer them free garbage, water, and sewer, or the sales tax revenue, they're getting something that makes their life easier here, more affordable. It also makes the businesses affordable. Obviously, some people will benefit more than others, and you will need rules to make sure it's not getting abused. However, I I like that idea. Um but that's up to the vote of the people.
SPEAKER_05Thank you.
SPEAKER_00Man, Ryan, can we anticipate seeing that 1.3 deficit still in there when we receive your budget, or are you planning on washing that out to zero?
SPEAKER_01That's that's a really good question. I don't I think it will depend on what I hear on the 22nd. So, for example, just to give you an example, there's a street sweeper in the CIP budget right now. It's$500,000. You can take it out. Last year, the street sweeper broke. It was near chaos over the street sweeper breaking. We fixed it. We know the street sweeper's old. Uh, we got a new motor in it eventually.
SPEAKER_01Um and really going into 24, 25, or going into 24, this is why I'm not a gambler. Tyson and I, the public works director, sat there going, greater, street sweeper, greater, street sweeper. He finally said, You choose. I chose a greater. Obviously, I chose wrong, so don't bet on me. But we know the street sweeper is old, we know it's prone to breaking down. We got a new motor on the sweeping apparatus. Um, but you know, it it's it's one of those things what I mentioned when I was talking about early on.
SPEAKER_01Skegway expects the community to be beautiful and the services to be good. We're a tourist town, we want that. That's great, but you got to pay for it. So could you pull a sweeper out? Sure. But, you know, do you do you want to be in that roll of the dice on whether you're going to keep that sweeper running or not? That that's up to you all. I can tell you that um street sweepers are problematic, not just in this community. They they seem to follow me around and break down.
SPEAKER_00So check. All right. We'll wait and see then. We'll wait, we'll we'll wait with anticipation to see if we get that 1.3. Any further questions on the uh on item two of our agenda here before we move on? Okay. We'll move forward then. Manager Ryan, thank you, and thank you to all your staff for coming out. We appreciate you guys being here. We may not have asked a lot of questions, but we do uh we do appreciate your attendance. Thanks for coming.
SPEAKER_00Okay, moving on to item three, mayor and assembly discussion items. I'll open the table up if anybody has any discussion items, basically like we do during assembly meetings. If not, we'll move on to closing comments and then we'll adjourn. Any discussion items from the table. Okay. Um, I think my only thought is um as we move through this budget cycle, it's very important. This sets the the direction and the course for the our community for the next year for sure, and and beyond that.
SPEAKER_00Um once we get the even now, start thinking about items that you may want to change. If you do, if you want to add, you want to subtract. Um, we've had this offer from Manager Ryan. I think it's a very gracious offer, so we can come into his office and talk about these changes. Possibly he'll incorporate them into his budget before we actually get it back here at the table. Um, once we get it, we can make our changes, and then that will be the budget. So we'll move on now to closing comments.
SPEAKER_05If uh assembly member would nothing at this time, thank you.
SPEAKER_00Thank you. Some member Hillis, welcome, assembly member Hillis. How are you, sir? I'm great. Thank you. All right, you got all this budget stuff figured out?
SPEAKER_03Oh, I've got it all totally figured out. Thank you. All right, but seriously, thank you, Brad, for writing this up and making it so clear. It's very helpful.
SPEAKER_00So Hans.
SPEAKER_03Nothing at this time, thank you.
SPEAKER_00So I member Collodi. Just wanted to thank our staff and department heads for their hard work. Good. Vice Mayor Potter.
SPEAKER_07Thank you, Your Honor. Um, I'll also thank the staff. This is a a big, big time of year for them. Well, they work hard um all year round. Uh I would just, for anybody who might be listening at home, the very dedicated community members, I really would encourage everyone to read the um mayor's memo in this public packet. Manager's sorry, thank you. Manager's memo in this public packet. Um Valanch budget is important, and um we have to do, but it comes with choices.
SPEAKER_07We can't have it all. Um, so um we'll see what happens.
SPEAKER_00I don't have anything else, so I would uh entertain a motion to adjourn. Second by motion by Clodie, second by Potter, discussion? Roll call, please.
SPEAKER_02Yes. Clodie. What else?
SPEAKER_00All right, thank you, everyone. This meeting is adjourned.
Call to Order Roll Call Approval of Minutes: November 5, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report Manager’s Report Presentation from...
Call to Order Discussion of Rockslide Mitigation Project 65% Design: Presentation from the Design Team Questions and Answers Written Questions from the Public Questions from the Mayor and Assembly Overview of Guided...
Call to Order Roll Call Approval of Minutes: October 8, 2026 Special Meeting October 15, 2026 Approval of Agenda Reports of Officials and Committees: Mayor’s Report Assembly Committee Reports Treasurer’s Report...
Call to Order Review of Proposed FY27 Budget - CIP & Special Revenue Funds: School Funding Debt Service Permanent Trust Capital Projects Sales Tax Fund CPV Excise Tax Fund Mayor & Assembly Discussion Items Adjournment...
Call to Order Review of Proposed FY27 Budget - Operating Funds: General Fund Visitor Fund Clinic Fund Harbor Fund Port Fund Water - Sewer Fund Solid Waste Fund Mayor & Assembly Discussion Items Adjournment Packet