Great, thanks for sharing the transcript! Here are polished show notes for this podcast episode of Transition to Zero:
🎙️ Episode Title:
Scaling Smart: Zenobe's Global Electrification Vision with Steven Meersman
📅 Release Date:
4/29/2025
🕒 Episode Length:
Approximately 35 minutes
🎧 Episode Summary:
In this electrifying episode of Transition to Zero, host Jared Schnader sits down with Steven Meersman, Co-Founder and Director of Zenobe, to explore how the company is revolutionizing zero-emission transport across the globe. From powering thousands of electric buses to providing second-life solutions for batteries, Steven dives into Zenobe's holistic, financially sustainable approach to transport decarbonization.
The conversation covers:
The origin and meaning behind the name Zenobe
Zenobe's evolution from grid-scale battery systems to fleet electrification
Key offerings: Charging-as-a-Service, battery financing, and second-life battery use
Real-world case studies: From UK depots to Canadian delivery vans
The coolest (and greenest) projects, including powering a "Massive Attack" concert
Tips for transit agencies on infrastructure planning and procurement models
Zenobe's growing presence and vision for North America
Whether you're in transit planning, fleet management, or just a clean tech enthusiast, this episode is packed with insights into how infrastructure innovation meets environmental impact.
👤 Guest:
Steven Meersman, Co-Founder and Director, Zenobe
Steven brings an engineer's mindset and global perspective to the challenges of electrifying fleets. From Belgium to the UK to the U.S., Steven and Zenobe are reshaping how cities think about electric transport and infrastructure financing.
🔗 Links & Resources:
Zenobe Official Website
CalSTART
ACT Expo Info
📍 Key Timestamps:
(Approximate times, adjust once audio is finalized)
01:16 - Intro to the podcast and Zenobe
02:00 - The story behind the name "Zenobe"
03:03 - Early grid battery applications and scaling up
05:24 - Data-driven optimization and second-life battery use
09:01 - Charging-as-a-Service and cost savings for fleets
13:39 - Pop-up electric bus services & festival logistics
16:43 - Partnership spotlight: Zenobe & 7Gen in Canada
19:40 - Working across global regulatory landscapes
22:32 - Battery value, chemistry, and lifecycle
30:01 - Advice for transit agencies on planning & procurement
33:39 - What's next for Zenobe in North America
📢 Call to Action:
Zenobe is growing fast and making waves. Catch them at ACT Expo and reach out if you're exploring fleet electrification. Want to learn more or partner up? Check out the links above and connect with Steven and his team.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
I have started my discussions and completely forgotten to hit record. So yeah, it's, it's great. It's very professional. I never, never, never. It's definitely not as a, not as natural when you're like, all right, what did I screw up on the first time? yeah, that's right. Um, yeah, the only other thing is if you have, as you're talking and this is people have a tendency to do this, try not to tap your hands, your like a pen, don't click it because the, this is all uncompressed audio.
It'll pick up everything. So don't worry. I'll try and edit out anything that I can, but yeah, if you're, if you're just going like this the whole time, it's going to pick it up. Belgian so that sort of means I'm half French so I will be moving my hands but I'll try not to. Don't worry. can tell I am. I'm absolutely the same. So no worries there. So I'll start with a quick read in introduction of just like the podcast. And then I will say I'm here with Stephen Mearsman, the co-founder and director of Zenobia. Stephen, it's a pleasure to have you here.
And then, you know, say it's great to be here, whatever you want to say. And then I'll start launching into the questions. All right. All right. Wonderful. Welcome everyone to another episode of Transition to Zero, the only podcast dedicated to advanced technologies and transit. I'm your host, Jared Schneider. I lead the bus team at the industry building national nonprofit organization, CalSTART, where we focus on transportation, decarbonization and clean air for all.
I'm here with Stephen Mearsman, the co-founder and director of Zenobe. Stephen, it's a pleasure to have you here. No, it's great to be here and I apologize for being slightly late, but at least three of me didn't show up and I'm sure there's a bus to open there somewhere. No, it's wonderful to have you here. ah So let's kind of start out with how you guys get started, what you guys do, and I'd love to know, and let's actually start with where the name Zenobi come from. sure. So Zenobi for the Greek aficionados amongst the audience, I guess, means child of Zeus and he was thrown in lightning bolts around.
So that was quite fun. But we actually named it after Zenobi Graham, who's a Belgian engineer who uh perfected the dynamo and sort of the design that we know and love today for generating electricity. And after inventing that, he moved to England and started electrifying all the lighthouses there and Zanobi was founded by myself, a Belgian electrical engineer and two English businessmen, one being very strong on the banking side and one knowing the utility space very well.
So when they proposed that name, it was very hard for me to object to. No, that's great. what do you guys what do you do? Like what's your core business? ah Tell it tell everyone about kind of what you guys do and you know, and we already heard how you got started. So that's Yeah, so Zanobi got started in early 2017 as a developer, owner, and operator of grid scale power infrastructure. So what we were doing is we were the first to put batteries onto the UK grid to solve a lot of the stability issues that you see in a grid that adopts lots of renewables and
retires its formal load and has EVs popping up, et cetera. Now, quite quickly we realized there that doing the lowest common denominator stuff there was actually only scratching the surface. The real fundamental issues were happening at the transmission network where you would see bottlenecks emerge at the first mile of the energy grid, which is a lot of the uh power was generated in Scotland, but it was being consumed in the south of the country and because of legacy that created choke points on the...
So we started putting batteries on those specific locations using grid forming inverters and lots of other things to do very visible things for the grid and really increase the efficiency of the existing network and avoid the need for lots of further investment. Now those capabilities we turned out were really relevant, not just at the first mile, but also at the last mile of the electricity grid and a new last mile at that, which is that If you electrify buses or trucks or other things that need to be on the road to make money and that want to gobble up as much energy as they can in a short period of time and you
put a lot of them in the same place, you start to create choke points at the last mile. So our capabilities to interconnect things to the grid quickly and cost-effectively with software, sometimes with stationary batteries and other things, were relevant. Secondly, our ability to fund batteries and get banks and other people on board to the cost of capital as well. Also quite relevant because if you look at a bus half or a third of the cost, depending on what type of vehicle is the battery or the future replacement battery.
So factoring that in helps. And then lastly, we were getting a lot of data as well from all these vehicles. So we sort of found ways of using that data to further drive down the cost, be it by training the drivers, procuring energy in a better way, um charging at the right time to avoid demand charges. But also lastly, working out that actually when these batteries come off the vehicle, you can still do something with them because you remove the battery because it doesn't have
the 250 mile range anymore that you need. the battery can't run a marathon anymore, but it can still run sprints. So we started putting them into little boxes and competing with diesel generators or hybridizing diesel generators on uh construction sites, movie sets, coronation of kings in the UK and film sets uh to lower their cost and make it quieter, which meant a lot of these things get a lot easier and you sort of reduce your footprint on the community as
well. But all doing that, while saving money. And I think that's a fundamental gist of what we do, is we try to prove that being uh ecologically sustainable will only get mass adoption if it is also financially sustainable. So the money actually matters. That's great to see because it's very often, especially in the zero emission space that the money doesn't always add up. So it's great to see that you guys are driving down costs through this.
And can you talk about a little bit more about like how you're helping fleets specifically, because you brought up a number of different things you guys are doing. But as your business model has evolved, where is that kind of focus on? the different things you're doing for fleets right now. Yeah. So, right now we own and operate about 2000 electric buses and they're charging infrastructure. when I say electric buses in this context, I would say about 80 % of those are transit buses. Uh, and the rest is sort of the typical yellow school bus, you know, in love.
and the core part of the offering is sort of charging as a service where we say, look, If you have any lost miles with a vehicle because it wasn't charged on time or enough or at the lowest cost, we will pay for a replacement vehicle for that day. And the way we were able to offer that and take, take money out of the equation and make it cheaper is because we typically reduce the size of the grid connection that people think they need by about 60%. So that means less time waiting for the utility.
It means less upstream investment from the utility. It means a cheaper grid connection. But it also means we can put less copper or aluminum, which is also cheaper, into the ground on the low voltage side on the side. So less infrastructure works, which means then when we fund it, there's less money to recuperate or charge interest on. So that's one thing. The other bit is then on the batteries. You're now starting to see on certain applications OEMs offer 15-year warranties, but in many cases, sort of, there is a midlife replacement.
And because we've got that second life use, that we can ascribe to it rather than treating it as a liability, right? Like having to pay Redwood or other companies to recycle the battery. We will say that we'll account for that value. And that means that the monthly payments in the first life are less because you only pay for what you use. So that's another big savings. And then if you then look at either federal or local state funding, in many cases, you're able to buy the body and the chassis, sort of the bits of the deep that
you recognize from a diesel bus with the subsidies, we will fund the battery, we will fund the charging infrastructure, become zero capex and people pay us from the savings. And I think currently in many places, but I also say in the North American environment, that might be quite relevant for lot of people who got programs underway and currently got uncertainty on some of that funding. So it's really interesting that you're bringing it in.
You're absolutely right. I think that is very interesting. How are you assessing the value of the batteries for, I have so many questions, sorry. I'm gonna stick with this one right now and I'll have to jump back to my other ones. How are you assessing the value of the batteries for that second life? Yeah. The first thing that I think some people start to think that the second life is worth more than the first life. All right. That's sort of the second phase. Like first you've got denial and then you got sort of exuberance. Is that that's not the case.
The most valuable thing you can do with a battery is turn it into kilometers or miles or movement. All these secondary applications are secondary applications and they're worth a lot less like stabilizing grade, avoiding diesel usage on the construction sites. But what we look at is say, look, you're going to drive a bus a certain way and bring it to cars. You drive your car a certain way. I drive my car a different way. The amount of kilometers going through and the acceleration and deceleration will be different.
So we factor the usage in to predict what we think is going to be left of that battery at the end. And then at that point, rather than having to stand on a street corner and try and sell it to whoever passes by at the lowest possible cost, We actually keep it in our system by turning in, getting partners like Doomeray and other companies to turn it into a box that we can then buy and rent out again on a construction site. And in many cases, it's even going back into our own sites.
We've currently got some batteries on a bus depo where the utilities suddenly delay the interconnect and they had a contract with local city. had to go live. So we temporarily put a battery in there. to boost or lock the peak off, allow them to start the route. And then in two, three years, once the interconnect comes live, we'll take that battery away, right? So they don't have to make a permanent investment. In fact, we're just renting them virtual grid capacity. We've got other batteries where it's stationary and it's actually optimizing the cost of the energy, avoiding demand tariffs, integrating solar from their roof to lower the cost
of the electricity and bring the total cost of ownership down. Um, and I think it's really sort of, you've got to sort of start at the end and then we're right to left. And it's different, right? We've got, uh, Ocado vans that, uh, come in and out of the depot three to five times a day to get charged. So heavy, intense usage, small batteries. Well, that's very different from a battery that's driving in the, in Barcelona on a, uh, sightseeing bus, like what we're doing for, uh, for a big bus there.
stuck in traffic and sort of bumbling along, right? It's a very different usage profile. So the application is really what drives it. So unfortunately, I can't give you a dollar a kilowatt hour. no, no, that's no, it's, it's great to hear because those I'm glad that you identified the different use cases here because it's not just you drop a battery down and that just solves all the problems to your exact point. There are different use cases on how each one of these would be done. I really liked the first one because it almost expedites the, um, the deployment of infrastructure.
Like you said, if the interconnect is not going to be there for two to three years, we have this problem all the time in the U S. what happens when the, you know, the utility is not going to be able to upgrade the service for the next, I mean, we've heard five years. So it sounds like you guys have a, you know, a temporary solution, but by temporary, it's like a three to five year solution. Well, the coolest thing we've done, and I want to do more of it, is uh not the coolest thing, there's a lot of cool things. It's sort of cool in this context, which is uh Massive Attack, sort of a British music band, uh very much cares about sustainability.
They also care about where they came from in Bristol, in the of the southwest of the UK. They wanted to have the sort of first zero mission, or as close to it, uh festival or performance. So they worked out where all the emissions are coming from. Actually, a lot of it is from people coming to the venue by car. So what they did is they said, look, we'll sell you a ticket. And it includes a free rail pass from doesn't matter where you are in the UK. But then the problem is, again, as always, the last mile, how to get from the station to the concert venue.
So we created a pop-up electric bus route. So we worked with all our customers in the air and said, look, who's got vehicles spare this weekend? Cause usually there's a reduced service. and, uh, bring them down to Bristol. We'll make sure they're charged with temporary infrastructure that we built in less than a week. We ran the service for a weekend and got like, I don't know, 50,000 people to and from the event with 50 buses. And we did all of that on, think less than a hundred kilowatt grid connection, because we had some second life battery to boost the battery.
charging speed when the buses were in. And then when they were away, we were trickle charging the battery ahead of time for when the next bus arrived. And then we took all of that away in a couple of days and then went off to charge, think the next Fast and the Furious movie or something like that. But that's cool. I mean, you only pay for what you use. Like look at school buses, right? School buses are only used six months of the year. Why are you paying for infrastructure for 10 years? It makes no sense. So I'm gonna back up.
You said that that was not the coolest thing you've done. What's the coolest thing you've done because that's pretty impressive. Well, I mean, there's a lot of cool things that each and every team does, right? mean, there's, so Tim Boothman, who's a global director in our V team and, Sophie Barmore, general counsel, uh, pulled off a record financing deal in Canada, which was a jurisdiction we hadn't worked in before with, uh, Franz and, and, and, Mark and Ken and the wider team at 7Gen. That was pretty cool for its own reasons, right?
New geography, new type of structure, backing a platform that was growing, but needed more funding to grow quicker. That was cool for a certain set of reasons. On the other side, shipping Second Life battery to New Zealand to boost public charging in a way that actually we worked out they're saving half our fees in energy optimization we're doing for them. So we need to make it more expensive next time. To powering a film set or using Second Life bus batteries to power the 11 tower cranes
with select plant hire at uh EDF's nuclear plant they're building in the UK. That's pretty cool too. So you've got to sort of pick your challenge. What's the coolest engineering thing? What's the coolest, or raising 260 million in a structured private placement for one of the biggest batteries in Europe, right? It's sort of, there's lots of cool things going on. So. So let me, let me ask, I want, I want to go back to the, the seven gen example, cause I think I just saw something in the news about this.
Is that correct? think this last week, there was a, a press release on Day, which was sort of a happy accident. Because what's in a name, right? mean, obviously they picked the name 7Gen sort of from the idea that we shouldn't make any decisions that impact seven generations further down, which is why they're sort of pushing for electric last mile delivery. And in the team, we really recognize someone's got the same EFOS as
Zenobia, which is, again, it's not a trade off between ecology and dollars. The two actually do go hand in hand and often if you really think hard enough about it, what's better for the environment also be better in a monetary sense. And they were doing that in last mile delivery in Montreal and wider Canada. But again, as so many of these businesses do, Capital is a challenge because the technology is new, the business is new, there's infrastructure, there's performance risk, all things that funders and banks sometimes
struggle with. But for us, we've got an underlying interest in the asset. We've done this in so many markets before, even though Canada was new, a lot of these other things felt quite familiar, which is why we were able to come in and quite quickly help. to support their growth. So it's really a partnership that we helped them refinance some existing transactions that freed up capital for them to do new transactions, which will then be able to again roll into the line that we've provided to them and we can grow together.
And they know the market last mile, they know Canada. And yeah, and off to the races we go, right? So could you kind of dial in a little bit more on what that agreement was with 7Gen? Effectively, it's an asset funding arrangement for last mile delivery uh vehicles that meet certain criteria, where Sabatain is obviously providing a lot of the services that in
our core markets, we would do itself. So they're designing, building, and managing the charging infrastructure, the software on the vehicles, uh vetting the customer. managing credit, invoices, billing, all that sort of stuff. And we're sitting behind them saying that, as long as things tick all these boxes, there will be capital for you to fund these projects. No, that's perfect. let me ask, because you are working in multiple countries around the world.
ah Are you finding different value propositions, not just in the projects, but in the countries themselves with their own regulations, with their own rules that they have? How are you guys assessing that? Yeah, countries are, wish it was, uh, I wish it was only one country compared to the next, right? Cause what you've really got here is multiple layers and a Venn diagram that would make, um, yeah, Escher and all of these, um, early abstract artists are really proud because
you've got on one side, uh, the transport sector, which is very fragmented and it's got different regulations. on the trucking side, bus side, public transit side or school bus side. So you've got all these lenses. Then you've got national regulations, but then typically you also got state level or province level regulations, right? I mean, not going to pick on the U.S., but say in Germany, environmental regulations in Munich are different than in Berlin, right? So, and then on top of that, you've got the energy grid with several thousand utilities, say in the U.S.
Some of them regulated, some of them vertically integrated, and then you need to take the cross-section of that. So it's hard to overstate the complexity. However, the nice thing is we've done this quite a few times now, right? So we've got over 140 depots now across nine countries and God knows how many cities. And what you do start to see is a New Zealand Australia, UK, Netherlands, Belgium, Finland, Sweden, Spain, Massachusetts, California, they have all asked themselves the same questions because they're just certain questions
you have to answer when you build an electrical grid. Now you may have come up with different answers to different problems, but the questions are always the same. So we can learn and go through that process, I think, a lot quicker. than other people, I think. And so working across multiple countries and multiple platforms, seems like the one, I don't even wanna say it's a ubiquitous part of it, but we're dealing with the batteries.
That's kind of the through line on all of this. Is there different value, and this is where I'm trying to get at, like when you're doing an assessment on the value of the batteries, Is it the chemistry that you're looking at? it the manufacturer? I mean, because there are obviously multiple chemistries, battery manufacturers, whoever it is. Are you seeing differences across there in terms of the residual value and second life use of these batteries based by the manufacturer of the chemistry and whatever else that may
go into it? there's even differences in the first life, I would say. So if you look at it, the... How the first life vehicle is built and how it is used, the duty cycle, will have an impact on any battery in a certain way. The battery is then manufactured by someone else, so again you've got these shocks being applied to the battery having a different impact based on the chemistry and all the things you touched on. So the answer is yes, all of the above.
Obviously we're gathering a lot of data and we're living and learning with every project. But the short answer is yes. I what I would say though is that the battery industry to a large extent relies on scale manufacturing, right? So you may have a wide variety of people selling vehicles. If you go a level deeper where the batteries come from, it's more concentrated.
If you then go a level deeper below the pack level to the module level, it gets even more concentrated. You go to the cell level, you go to the raw commodities. it gets a lot more narrower, right? uh So to that extent, there are certain things you can go with, but it's not just the technical performance, it's also the commercial performance, right? Like if we were underwriting a vehicle, right? We're now underwriting full vehicles, not just batteries, We fund full vehicles. Well, is that OEM gonna be here four years from now?
Can they really stand by the warranty they've provided? And... That's a double edged thing, right? Cause on one side it's something we got to get comfortable with or get comfortable that we can manage it in case they're not around. And that can then be a service we provide to other customers, right? So if you look at a customer, you've got, don't know, 50 buses or 20 trucks you're buying from one of the new startup OEMs or from a large OEM, but you're buying the first gen
vehicle. Well, what supporter you're going to get. Is there a dealer near you? How can they get parts three, four years from now? But by having somebody like us sit in the middle, well, it doesn't really matter because you just go to Zenobi, right? And they're the single point of accountability. And if the OEM disappears and we've done this in some cases and there is no more battery from that supplier, we have to go and find one somewhere else. But that's doable. There are solutions for that.
m But that's again sort of part of the value we provide is it's a lot of tiny little things, a little bit of value on the engineering, a little bit of value on the maintenance, avoiding making the same mistakes, right? Every project is unique, so we'll make new ones together. And that credit insurance, right? We were backed by KKR, by &G, we've got a large balance sheet. We've done this many times before. So... Yeah, that in a time of volatility, that hopefully gives a lot of people comfort as well that we can be that sort of, yeah, extra line of defense because let's be clear, all these
people, be it school bus, logistics, transit, they're running critical infrastructure, right? If they fail, uh people don't get to their jobs. Kids don't get to school on time and they don't have breakfast or, um, or, or, our Nike shoes, uh, get delivered seven days late. mean, I'm sure there's some more. or medicine doesn't get delivered on time, right? Let's use a slightly more critical example on app. But that's what we're talking about. So these people are under massive pressures already.
So having a partner that sits there alongside them, is in the trenches with them saying, look, we've done this before. Yes, your situation is unique, but it's similar in this and this this way. We can take a lot of risk out of the project. And I think that's, we take a lot of risk out of the project and a lot of costs out of And as long as we continue to do that and obviously the market evolves, we need to continue to find new ways. uh But yeah, as long as we keep doing that, we'll be busy for quite a while. So in the U S we have, we've seen kind of tumult in the transit industry with, um, some manufacturers leaving the industry and, know, just kind of like any market, it's going to
be, it's going to be dynamic. It's always changing. have the same thing in the school bus market, um, same thing in trucking, but I'd love to know if you can talk a little bit about what is Zenobis plans in the U S like where are you guys trying to. uses your beachhead and have you guys already been working here? Yes, we're active, right? We've got more than 20 people on the EV fleet side based out of Naperville, just outside Chicago. We've got another team out of Brooklyn looking at the grid scale battery developments in the Northeast, which is I think about just under 10 people.
We've been there for two years now, I think. We've got just under 100 transit buses where we're owning and providing batteries as a service. A lot of them we picked up out of the Proterra Chapter 11. We've got around 100 or so school buses that we're charging at the moment, or probably got double that in build in terms of charging infrastructure.
With the 7Gen deal, I guess we've got just around a hundred uh last mile delivery fans on our books as well. And yeah, we're continuing to grow, right? I mean, we're gonna be at it. We've got a presence at ACT and a lot of other conferences because we're keen to grow, be it last mile, be it bridge, be it yard tractors or other heavy duty transport. We're gonna continue to grow into transit and school bus. Yeah, we're here for the long haul. No, I love that. And where, like, if you can talk about it, what transit buses or I guess what transit agency are you working with?
Um, this is probably where Larry would kick me under the table, but, um, no, think there's probably a list somewhere that we can provide you after the call, but we are quite well spread, uh, around, uh, around the U S I think we're in, uh, definitely over 20 of, of all the States. So, uh, yeah, we're not everywhere yet, but we'd like to be. No, that's really impressive. So you guys will be at ACT next week as we're recording this today. It'll be next week.
And actually when we release it, it should be right before ACT if I remember correctly. So really want to make sure that people get a chance to meet with you guys. Also, are there any recommendations? I mean, you guys have been doing this in countries all over the world. Is there anything that you would like to tell? especially for this podcast, it's all focused on transit. Is there anything that you'd like to tell transit agencies or really just whomever may be listening about what they should be thinking as they're moving towards building out their
zero emission platforms, their, their infrastructure, whether that's the end of the life side or even just the longterm planning for infrastructure. I think the first thing is that you cannot approach this problem in isolation. You can't have your CAPEX planning team and your operations team just one builds one chucks it over the fence and carries on. You've got to get representatives of all these teams together because how you operate it can have a huge impact on how you design it and vice versa.
that I think that will be the first message. Second message would be. in and I know this is a hard one because obviously they have to follow procurement rules and all these processes and legacies that have been put in place over the last 75 years or so. But be flexible in your approach to procurement because what we do see in some places is, they have to go and buy a charger this way. They have to buy installation services that way. They have to buy financing that other way.
And the problem with that is you end up with a suboptimal situation because all these things introduce interfaces. And when interfaces get created, somebody has to make a margin because they're not doing it for your trustworthy uh face. And secondly, there's a risk transfer that takes place. And when risk needs to be factored in, somebody's adding cost that the end customer will be paying for. Give an example. can say you get somebody to design your LV.
charging need, right? So they say, I've done a lot of industrial projects. I'm going to apply a diversification factor of 60%. Now that doesn't work on EV because when they're on, they're alone. But say they do something. Then they say, let's put a 30 % safety factor on the amount of copper I use. That then goes into a switchboard. The switchboard manufacturer says, my god, so much load. But what if they go over that? I'll apply a 30 % safety factor to that as well. And that sort of cascades all the way up and suddenly somebody tells you you need 18 megawatts to charge 200 buses, which is probably about three times too much.
Like in Coventry, we are currently charging about 170 buses on less than six megawatts. Now that took a bit of work. We had to look at a parking layout because if certain vehicles park up earlier, then it brings down the peak load. So we had to look at parking layouts, operations, but that only worked because national express and our Mubico group, um, engaged with us early on. so you had the utility, us, them, the designers all sitting together and massively iterating.
think the thing that got built was like version 46 F or something like that. Right. Um, but it's still very cheap to get the CAD guy to redraw it one more time than to dig up your depot again and say, Oh, sorry. No, we wanted it in a different place. Right. So. And I think that's the other bit that I think is really important, your procurement approach and being open to alternative models and avoiding the marginal-marginal or risk-on-risk-on-risk-on-risk thing. And then the last thing I would say, and obviously I'd be remiss not to do this, call Zanobi or a competitor of ours and get as much advice as you can, right?
Because while we're pitching us and others, we provide a lot of free advice, right? So engage with the market, get good ideas. take good ideas to other people and then see who you trust to deliver it. So what's going to be the next big thing that Zenob is doing that you can that you can talk about? Is there anything on the horizon that you're like, Oh, as long as you're not going to get in trouble from somebody. I think there's a lot of exciting things happening.
I mean, we're really excited about what we're doing in the US and in Canada in terms of building that beachhead, I think that you referred to, getting those first depots up and live and being able to tell other people in the industry, say, come and look at what we've built. Because at Zenobi we've never really been good at marketing and that's not a criticism of our marketing team, we make sure they don't kick me because they've done a great job. But we put an artificial restriction on ourselves is that in the best case, we only talk about what we've done.
And then sometimes we forget because we've gotten busy with the next thing. And I think that's really important. So I'm really excited about what the team's doing in the US and delivering, same in the other regions. And then being able to invite. Other people say, hey, look at what we built. Tell us how we could have done it better. Tell us how you think we did great. And let's learn from it and move on to the next project and do that just a little bit better than the one yesterday. Now that is perfect. And Steven, I really appreciate you taking the time. Hopefully your shins aren't too bruised from everyone kicking you under the table for this one.
So yeah, everyone check out Zenobia. There'll be links in the show notes to their website. If you're at ACT, please find them. A great group of people. So thank you so much, Steven. I really appreciate you taking the time. Thanks, Jarrod, for inviting me.
Episode 60: Rethinking Transit Adoption, Open-Loop Payments, and Equity with Dr. Susie Pike Episode Overview In this episode of Transition to Zero, host Jared Schnader is joined by Dr. Susie Pike, Director of the UC...
Transition to Zero Podcast: Show Notes Episode Title Unpacking Bus Customization: Costs, Risks, and the Road to Fleet Standardization with Phil Plotch & Grace Truslow Episode Description & SEO Summary Why do U.S....
This episode of Transition to Zero explores how transit agencies can use digital learning, digital twins, and modern LMS tools to prepare their workforce for zero emission fleets and other evolving propulsion systems....
Transforming Transit Operations: Anthony's Military Background, Fort Bliss Partnerships, and the Future of Clean Mobility Explore how Anthony's military background informs a disciplined, mission-driven approach to...
Episode Overview The procurement of a zero-emission bus (ZEB) is not the final destination - it is merely the starting line. As transit agencies across the country deploy advanced transit fleets, the ultimate metric of...